Bid Tabulations for the Letting of 8/11/2021 LA DOTD Headquarters

Proposal:H.013738.6
Parish:Livingston
Routes:LA 441
Description:LA 441: LA 42 - I-12 COA
Type Construction:MILLING ASPHALT CONCRETE, IN-PLACE CEMENT TREATED BASE COURSE, ASPHALT CONCRETE OVERLAY AND RELATED WORK.
Estimated Construction Cost:$1,211,802.85
106276Barriere Construction Co., LLC$1,057,675.66
200046Barber Bros. Contracting Co., L.L.C$1,154,593.73
312031R.J. Daigle & Sons Contractors, Inc$1,182,598.11
469570Bridging The Gap, L.L.C.$1,606,289.94


Line
Number
Item NumberItem DescriptionQuantityUnit of
Measure
- 1 -
Barriere Construction Co., LLC
- 2 -
Barber Bros. Contracting Co., L.L.C
- 3 -
R.J. Daigle & Sons Contractors, Inc
- 4 -
Bridging The Gap, L.L.C.
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
0001202-02-38300Removal of Sign and U-Channel Post 12     EACH14.50174.0015.00180.0016.50198.0016.31195.72
0002203-07-00100Borrow (Vehicular Measurement) 17     CUYD60.001,020.0030.00510.0026.53451.01137.442,336.48
0003204-05-00100Temporary Sediment Check Dams (Hay) 12     EACH165.001,980.00100.001,200.00165.001,980.0037.56450.72
0004204-06-00100Temporary Silt Fencing 800     LNFT3.002,400.001.00800.002.201,760.004.363,488.00
0005303-02-00100Removal of Existing Patches 50     SQYD1.0050.0020.001,000.0021.241,062.00189.119,455.50
0006303-03-00400In-Place Cement Treated Base Course (12" Thick) 30,138.8   SQYD8.25248,645.108.00241,110.408.45254,672.8612.58379,146.10
0007401-02-00100Aggregate Surface Course (Adjusted Vehicular Measurement) 603     CUYD30.0018,090.0040.0024,120.0017.6110,618.83114.7369,182.19
0008402-01-00100Mainline Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) 15     CUYD150.002,250.0075.001,125.0088.741,331.10112.181,682.70
0009502-01-00100Asphalt Concrete 6,428.3   TON89.50575,332.8585.00546,405.5085.32548,462.56109.48703,770.28
0010502-01-00200Asphalt Concrete, Drives, Turnouts and Miscellaneous 452.6   TON1.00452.60145.0065,627.00142.9464,694.64142.1164,318.99
0011509-01-00100Milling Asphalt Pavement 26,603     SQYD2.2559,856.752.7573,158.252.3261,718.962.0855,334.24
0012509-02-00100Contractor Retained Reclaimed Asphalt Pavement -1,501     CUYD1.00-1,501.000.000.000.01-15.015.44-8,165.44
0013713-01-00100Temporary Signs and Barricades 1     LUMP63,000.0063,000.0043,000.0043,000.0067,614.0067,614.0073,399.0473,399.04
0014713-03-01000Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) 8.216 MILE45.00369.72300.002,464.80141.381,161.58617.245,071.24
0015713-03-02000Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) 18.588 MILE1.0018.59750.0013,941.00825.0915,336.77816.0715,169.11
0016713-04-01000Temporary Pavement Markings (Solid Line) (4" Width) 8.22  MILE1.008.221,250.0010,275.001,375.0011,302.501,360.8911,186.52
0017716-01-00100Mulch (Vegetative) 1.5   TON775.001,162.501,000.001,500.00880.001,320.003,624.655,436.98
0018717-01-00100Seeding 45     LB18.00810.0011.00495.0016.50742.5043.501,957.50
0019718-01-00100Fertilizer 1,494     LB0.751,120.501.001,494.000.50747.002.173,241.98
0020722-02-00100Project Site Laboratory (Equipped) 1     EACH1.001.002,000.002,000.002,500.002,500.0038,058.7638,058.76
0021724-02-00100Rumble Strips (Shoulder/Edge) 4.109 MILE300.001,232.70320.001,314.88286.071,175.463,602.2414,801.60
0022727-01-00100Mobilization 1     LUMP37,450.0037,450.0080,000.0080,000.0090,000.0090,000.0075,000.0075,000.00
0023729-16-00200Object Marker Assembly (Type 2) 12     EACH85.001,020.0080.00960.0082.50990.0081.56978.72
0024731-02-00100Reflectorized Raised Pavement Markers 272     EACH8.502,312.008.002,176.008.252,244.008.152,216.80
0025732-01-02080Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) 12     LNFT18.50222.0021.00252.0022.00264.0021.75261.00
0026732-02-02000Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) 4.647 MILE5,000.0023,235.004,700.0021,840.904,953.2023,017.524,896.4322,753.71
0027732-03-02000Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) 2.055 MILE1,475.003,031.131,600.003,288.001,654.013,398.991,635.063,360.05
0028735-01-00100Mailboxes 53     EACH18.00954.0021.001,113.0022.001,166.00184.089,756.24
0029735-02-00100Mailbox Supports (Single) 53     EACH150.007,950.00135.007,155.00143.007,579.0046.652,472.45
0030740-01-00100Construction Layout 1     LUMP4,500.004,500.006,000.006,000.005,000.005,000.0038,058.7638,058.76
0031NS-500-00340Saw Cutting Asphalt Concrete Pavement 88     INLF6.00528.001.0088.001.18103.8421.751,914.00
             
  CONTRACTOR TOTAL   1,057,675.66 1,154,593.73 1,182,598.11 1,606,289.94