Bid Tabulations for the Letting of 8/11/2021 LA DOTD Headquarters

Proposal:H.012951.6
Parish:Winn
Routes:LA 126
Description:LA 126: LA 1237 TO CALDWELL P/L
Type Construction:GRADING, DRAINAGE STRUCTURES, MILLING ASPHALT CONCRETE, IN-PLACE CEMENT TREATED SUBGRADE, LIME TREATMENT, IN-PLACE CEMENT TREATED BASE COURSE, ASPHALT CONCRETE OVERLAY, AND RELATED WORK.
Estimated Construction Cost:$6,504,068.66
112487Diamond B Construction Co., L.L.C.$6,946,333.02
212312GILCHRIST CONSTRUCTION COMPANY, LLC$7,452,176.99
305789D & J CONSTRUCTION CO., LLC$8,251,972.30


Line
Number
Item NumberItem DescriptionQuantityUnit of
Measure
- 1 -
Diamond B Construction Co., L.L.C.
- 2 -
GILCHRIST CONSTRUCTION COMPANY, LLC
- 3 -
D & J CONSTRUCTION CO., LLC
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
0001202-02-00020Removal of Winn Rock (3.5" Depth)920     SQYD15.0013,800.0010.009,200.0010.009,200.00
0002202-02-00020Removal of Winn Rock (40" Depth)2,778     SQYD48.00133,344.0025.0069,450.0025.0069,450.00
0003202-02-02020Removal of Asphalt Pavement 463.5   SQYD28.0012,978.0012.005,562.0010.004,635.00
0004202-02-14500Removal of Guard Rail 1,674     LNFT15.0025,110.0010.0016,740.0035.0058,590.00
0005202-02-32100Removal of Pipe (Cross Drain) (24" CMP)25     LNFT10.00250.00110.002,750.0020.00500.00
0006202-02-32100Removal of Pipe (Cross Drain) (24" RCP)16     LNFT10.00160.00210.003,360.0020.00320.00
0007202-02-32100Removal of Pipe (Cross Drain) (30" RCP)42     LNFT12.00504.0080.003,360.0020.00840.00
0008202-02-32100Removal of Pipe (Cross Drain) (36" CMPA)40     LNFT15.00600.00130.005,200.0020.00800.00
0009202-02-32100Removal of Pipe (Cross Drain) (36" RCP)8     LNFT10.0080.00140.001,120.0020.00160.00
0010202-02-32100Removal of Pipe (Cross Drain) (48" CMPA)80     LNFT12.00960.0090.007,200.0020.001,600.00
0011203-05-00100Excavation and Embankment 1     LUMP25,000.0025,000.0075,000.0075,000.0075,000.0075,000.00
0012203-07-00100Borrow (Vehicular Measurement) 5,723     CUYD20.00114,460.0026.00148,798.0030.00171,690.00
0013303-03-00400In-Place Cement Treated Base Course (12" Thick) 155,229.2   SQYD9.251,435,870.109.001,397,062.8010.001,552,292.00
0014304-01-00100Lime 57.87  TON254.0014,698.98250.0014,467.50280.0016,203.60
0015304-03-00400Lime Treatment (Type C) (12" Thick) 6,124     SQYD5.2532,151.005.0030,620.0015.0091,860.00
0016309-01-12000In-Place Cement Treated Subgrade (12" Thick) 119,516     SQYD7.45890,394.209.751,165,281.009.001,075,644.00
0017401-02-00100Aggregate Surface Course (Adjusted Vehicular Measurement) 3,861     CUYD44.00169,884.0040.00154,440.0030.00115,830.00
0018502-01-00100Asphalt Concrete 28,634.8   TON89.002,548,497.2095.002,720,306.00112.003,207,097.60
0019502-01-00200Asphalt Concrete, Drives, Turnouts and Miscellaneous 1,894.4   TON130.00246,272.0095.00179,968.00165.00312,576.00
0020509-01-00100Milling Asphalt Pavement 141,490     SQYD1.55219,309.501.65233,458.502.25318,352.50
0021509-02-00100Contractor Retained Reclaimed Asphalt Pavement -3,858     CUYD1.00-3,858.001.00-3,858.001.00-3,858.00
0022701-01-01001Cross Drain Pipe (24" RCP) 24     LNFT340.008,160.00190.004,560.00190.004,560.00
0023701-01-01003Cross Drain Pipe (24" RCP/RPVCP/CPEPDW) 40     LNFT190.007,600.00190.007,600.00195.007,800.00
0024701-01-01023Cross Drain Pipe (30" RCP/RPVCP/CPEPDW) 48     LNFT245.0011,760.00200.009,600.00210.0010,080.00
0025701-01-01042Cross Drain Pipe (36" RCP/RPVCP/CPEPDW) 48     LNFT255.0012,240.00275.0013,200.00230.0011,040.00
0026701-01-01082Cross Drain Pipe (48" RCP/RPVCP/CPEPDW) 96     LNFT345.0033,120.00290.0027,840.00300.0028,800.00
0027701-08-00100Relaying Pipe (48" RCP)16     LNFT170.002,720.00150.002,400.00150.002,400.00
0028701-15-00100Concrete Collar 5     EACH2,400.0012,000.002,500.0012,500.001,000.005,000.00
0029701-17-00100Trench Excavation Safety Protection (Depth >5 feet) 211     LNFT10.002,110.001.00211.002.00422.00
0030704-03-00200Blocked Out Guard Rail - 31", (6'-3" Post Spacing) 737.5   LNFT29.0021,387.5035.0025,812.5028.0020,650.00
0031704-06-00200Guard Rail Bridge Attachments (Single Thrie Beam) 350     LNFT60.0021,000.0042.0014,700.0065.0022,750.00
0032704-07-00200Guard Rail Transitions (Double Thrie Beam) 700     LNFT95.0066,500.00110.0077,000.00100.0070,000.00
0033704-10-00310Guard Rail End Treatment, NCHRP 350 - 31" (TL-3 Flared) 28     EACH3,550.0099,400.003,100.0086,800.003,300.0092,400.00
0034711-01-04000Riprap (55 lb, 18" Thick) 85     SQYD110.009,350.00235.0019,975.00100.008,500.00
0035711-04-00100Geotextile Fabric 85     SQYD2.00170.002.00170.005.00425.00
0036712-02-00100Sacked Concrete Revetment 6     SQYD420.002,520.002,100.0012,600.00400.002,400.00
0037713-01-00100Temporary Signs and Barricades 1     LUMP70,000.0070,000.0075,000.0075,000.0065,000.0065,000.00
0038713-03-01000Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) 34.097 MILE154.005,250.94210.007,160.37200.006,819.40
0039713-03-02000Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) 9.517 MILE800.007,613.601.009.52500.004,758.50
0040713-04-01000Temporary Pavement Markings (Solid Line) (4" Width) 123.597 MILE1,200.00148,316.401.00123.60100.0012,359.70
0041722-02-00100Project Site Laboratory (Equipped) 1     EACH4,500.004,500.0020,000.0020,000.0010,000.0010,000.00
0042726-01-00100Bedding Material 71.6   CUYD10.00716.00160.0011,456.00100.007,160.00
0043727-01-00100Mobilization 1     LUMP227,000.00227,000.00540,000.00540,000.00450,000.00450,000.00
0044729-16-00200Object Marker Assembly (Type 2) 4     EACH100.00400.0060.00240.00100.00400.00
0045729-16-00300Object Marker Assembly (Type 3) 28     EACH105.002,940.0095.002,660.00110.003,080.00
0046731-02-00100Reflectorized Raised Pavement Markers 2,582     EACH7.0018,074.007.1018,332.207.0018,074.00
0047732-02-02000Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) 41.199 MILE4,200.00173,035.804,200.00173,035.804,000.00164,796.00
0048732-03-02000Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) 3.172 MILE1,650.005,233.801,600.005,075.201,250.003,965.00
0049732-05-00100Removal of Existing Markings 0.325 MILE12,000.003,900.0012,000.003,900.007,000.002,275.00
0050735-01-00100Mailboxes 15     EACH1.0015.0011.00165.005.0075.00
0051735-02-00100Mailbox Supports (Single) 15     EACH265.003,975.00155.002,325.00160.002,400.00
0052739-01-00100Hydro-Seeding 16.6   ACRE2,100.0034,860.001,400.0023,240.003,000.0049,800.00
0053740-01-00100Construction Layout 1     LUMP50,000.0050,000.0015,000.0015,000.0085,000.0085,000.00
           
  CONTRACTOR TOTAL   6,946,333.02 7,452,176.99 8,251,972.30