Bid Tabulations for the Letting of 8/11/2021 LA DOTD Headquarters

Proposal:H.011600.6
Parish:Red River
Routes:LA 507, LA 514
Description:LA 514 & LA 507: US 371 TO BIENVILLE PL
Type Construction:DRAINAGE STRUCTURES, MILLING ASPHALT CONCRETE, PAVEMENT PATCHING, ASPHALT CONCRETE PAVEMENT, AND RELATED WORK.
Estimated Construction Cost:$2,603,622.05
108584Madden Contracting Co., LLC$2,521,217.83
267822Earnest Contracting LLC$3,300,012.57


Line
Number
Item NumberItem DescriptionQuantityUnit of
Measure
- 1 -
Madden Contracting Co., LLC
- 2 -
Earnest Contracting LLC
Unit PriceTotal
Amount
Unit PriceTotal
Amount
0001202-02-00030Removal of existing rip rap840     LNFT24.0020,160.0035.0029,400.00
0002202-02-00030Removal of existing timber retaining wall530     LNFT24.0012,720.0025.0013,250.00
0003202-02-14500Removal of Guard Rail 374     LNFT15.005,610.008.002,992.00
0004202-02-32100Removal of Pipe (Cross Drain) 24", 30" and 36" pipes377     LNFT15.005,655.0010.003,770.00
0005202-02-32180Removal of Pipe Headwalls 2     EACH2,000.004,000.00500.001,000.00
0006203-07-00100Borrow (Vehicular Measurement) 5,968.2   CUYD1.508,952.3020.00119,364.00
0007203-10-00100Cleaning Existing Ditches 500     LNFT12.006,000.0020.0010,000.00
0008204-06-00100Temporary Silt Fencing 1,469     LNFT2.754,039.752.503,672.50
0009402-03-00100Non-Mainline Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) 31.2   CUYD1.0031.2065.002,028.00
0010502-01-00100Asphalt Concrete 11,337.3   TON101.251,147,901.63116.551,321,362.32
0011502-01-00200Asphalt Concrete, Drives, Turnouts and Miscellaneous 413.1   TON50.0020,655.00120.0049,572.00
0012509-01-00100Milling Asphalt Pavement 5,933     SQYD4.7528,181.753.5020,765.50
0013509-02-00100Contractor Retained Reclaimed Asphalt Pavement -235     CUYD0.01-2.351.00-235.00
0014510-01-00200Pavement Patching (12" Minimum Thickness) 6,870     SQYD66.00453,420.0054.45374,071.50
0015701-01-01001Cross Drain Pipe (24" RCP) 56     LNFT168.009,408.00150.008,400.00
0016701-01-01021Cross Drain Pipe (30" RCP) 276     LNFT189.0052,164.00215.0059,340.00
0017701-01-01041Cross Drain Pipe (36" RCP) 48     LNFT195.009,360.00295.0014,160.00
0018701-08-00100Relaying Pipe 30" and 36" pipes28     LNFT155.004,340.00200.005,600.00
0019701-15-00100Concrete Collar 8     EACH890.007,120.00750.006,000.00
0020701-17-00100Trench Excavation Safety Protection (Depth >5 feet) 320     LNFT2.00640.0025.008,000.00
0021702-07-00100Cross Drain Safety End (Type 1) 9     EACH3,800.0034,200.004,000.0036,000.00
0022704-01-01000Guard Rail (Single Thrie Beam) (3'-1 1/2" post spacing) 100     LNFT60.006,000.0095.009,500.00
0023704-01-01020Guard Rail (Single Thrie Beam) (6'-3" post spacing) 152     LNFT145.0022,040.00130.0019,760.00
0024704-03-00200Blocked Out Guard Rail - 31", (6'-3" Post Spacing) 565.5   LNFT28.0015,834.0035.0019,792.50
0025704-10-00205Guard Rail End Treatment, MASH, (TL-3 Tangent) 8     EACH3,850.0030,800.003,800.0030,400.00
0026707-04-00100Asphalt Curb 54     LNFT50.002,700.0075.004,050.00
0027711-01-05000Riprap (130 lb, 24" Thick) 979     SQYD92.0090,068.00403.65395,173.35
0028711-04-00100Geotextile Fabric 979     SQYD2.752,692.252.502,447.50
0029713-01-00100Temporary Signs and Barricades 1     LUMP131,500.00131,500.00100,000.00100,000.00
0030713-02-00500Temporary Pavement Markings (24" Width) 44     LNFT20.00880.0020.00880.00
0031713-03-01000Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) 7.884 MILE350.002,759.40500.003,942.00
0032713-03-02000Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) 3.695 MILE1,000.003,695.001,000.003,695.00
0033713-04-01000Temporary Pavement Markings (Solid Line) (4" Width) 27.786 MILE1,500.0041,679.001,500.0041,679.00
0034716-01-00100Mulch (Vegetative) 10     TON700.007,000.00950.009,500.00
0035717-01-00100Seeding 300     LB12.003,600.0012.503,750.00
0036718-01-00100Fertilizer 5,000     LB0.653,250.000.653,250.00
0037724-02-00100Rumble Strips (Shoulder/Edge) 8.414 MILE1,164.009,793.902,000.0016,828.00
0038726-01-00100Bedding Material 123.2   CUYD103.0012,689.6085.0010,472.00
0039727-01-00100Mobilization 1     LUMP131,500.00131,500.00140,000.00140,000.00
0040729-16-00200Object Marker Assembly (Type 2) 20     EACH65.001,300.0080.001,600.00
0041729-16-00300Object Marker Assembly (Type 3) 8     EACH105.00840.00110.00880.00
0042731-01-00100Nonreflectorized Raised Pavement Markers 40     EACH30.001,200.0030.001,200.00
0043731-02-00100Reflectorized Raised Pavement Markers 1,133     EACH7.007,931.007.007,931.00
0044732-01-02080Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) 22     LNFT40.00880.0040.00880.00
0045732-02-02000Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) 13.893 MILE3,800.0052,793.403,800.0052,793.40
0046732-03-02000Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) 1.848 MILE2,000.003,696.002,000.003,696.00
0047735-01-00100Mailboxes 8     EACH5.0040.0075.00600.00
0048735-02-00100Mailbox Supports (Single) 8     EACH170.001,360.00150.001,200.00
0049740-01-00100Construction Layout 1     LUMP20,000.0020,000.00100,000.00100,000.00
0050805-17-00100Reinforced Concrete Box Culvert Headwall Class A1 Concrete 15.08 cuyds Deformed Steel 883 lbs2     EACH33,000.0066,000.0060,000.00120,000.00
0051201-01-00200Clearing and Grubbing (Selective) 0.202 LUMP12,000.0012,000.00100,000.00100,000.00
0052732-05-00100Removal of Existing Markings 0.014 MILE10,000.00140.00400,000.005,600.00
         
  CONTRACTOR TOTAL   2,521,217.83 3,300,012.57