Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Madden Contracting Co., LLC | - 2 - Earnest Contracting LLC |
Unit Price | Total Amount | Unit Price | Total Amount |
0001 | 202-02-00030 | Removal of existing rip rap | 840 | LNFT | 24.00 | 20,160.00 | 35.00 | 29,400.00 |
0002 | 202-02-00030 | Removal of existing timber retaining wall | 530 | LNFT | 24.00 | 12,720.00 | 25.00 | 13,250.00 |
0003 | 202-02-14500 | Removal of Guard Rail | 374 | LNFT | 15.00 | 5,610.00 | 8.00 | 2,992.00 |
0004 | 202-02-32100 | Removal of Pipe (Cross Drain) 24", 30" and 36" pipes | 377 | LNFT | 15.00 | 5,655.00 | 10.00 | 3,770.00 |
0005 | 202-02-32180 | Removal of Pipe Headwalls | 2 | EACH | 2,000.00 | 4,000.00 | 500.00 | 1,000.00 |
0006 | 203-07-00100 | Borrow (Vehicular Measurement) | 5,968.2 | CUYD | 1.50 | 8,952.30 | 20.00 | 119,364.00 |
0007 | 203-10-00100 | Cleaning Existing Ditches | 500 | LNFT | 12.00 | 6,000.00 | 20.00 | 10,000.00 |
0008 | 204-06-00100 | Temporary Silt Fencing | 1,469 | LNFT | 2.75 | 4,039.75 | 2.50 | 3,672.50 |
0009 | 402-03-00100 | Non-Mainline Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 31.2 | CUYD | 1.00 | 31.20 | 65.00 | 2,028.00 |
0010 | 502-01-00100 | Asphalt Concrete | 11,337.3 | TON | 101.25 | 1,147,901.63 | 116.55 | 1,321,362.32 |
0011 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 413.1 | TON | 50.00 | 20,655.00 | 120.00 | 49,572.00 |
0012 | 509-01-00100 | Milling Asphalt Pavement | 5,933 | SQYD | 4.75 | 28,181.75 | 3.50 | 20,765.50 |
0013 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -235 | CUYD | 0.01 | -2.35 | 1.00 | -235.00 |
0014 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 6,870 | SQYD | 66.00 | 453,420.00 | 54.45 | 374,071.50 |
0015 | 701-01-01001 | Cross Drain Pipe (24" RCP) | 56 | LNFT | 168.00 | 9,408.00 | 150.00 | 8,400.00 |
0016 | 701-01-01021 | Cross Drain Pipe (30" RCP) | 276 | LNFT | 189.00 | 52,164.00 | 215.00 | 59,340.00 |
0017 | 701-01-01041 | Cross Drain Pipe (36" RCP) | 48 | LNFT | 195.00 | 9,360.00 | 295.00 | 14,160.00 |
0018 | 701-08-00100 | Relaying Pipe 30" and 36" pipes | 28 | LNFT | 155.00 | 4,340.00 | 200.00 | 5,600.00 |
0019 | 701-15-00100 | Concrete Collar | 8 | EACH | 890.00 | 7,120.00 | 750.00 | 6,000.00 |
0020 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 320 | LNFT | 2.00 | 640.00 | 25.00 | 8,000.00 |
0021 | 702-07-00100 | Cross Drain Safety End (Type 1) | 9 | EACH | 3,800.00 | 34,200.00 | 4,000.00 | 36,000.00 |
0022 | 704-01-01000 | Guard Rail (Single Thrie Beam) (3'-1 1/2" post spacing) | 100 | LNFT | 60.00 | 6,000.00 | 95.00 | 9,500.00 |
0023 | 704-01-01020 | Guard Rail (Single Thrie Beam) (6'-3" post spacing) | 152 | LNFT | 145.00 | 22,040.00 | 130.00 | 19,760.00 |
0024 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 565.5 | LNFT | 28.00 | 15,834.00 | 35.00 | 19,792.50 |
0025 | 704-10-00205 | Guard Rail End Treatment, MASH, (TL-3 Tangent) | 8 | EACH | 3,850.00 | 30,800.00 | 3,800.00 | 30,400.00 |
0026 | 707-04-00100 | Asphalt Curb | 54 | LNFT | 50.00 | 2,700.00 | 75.00 | 4,050.00 |
0027 | 711-01-05000 | Riprap (130 lb, 24" Thick) | 979 | SQYD | 92.00 | 90,068.00 | 403.65 | 395,173.35 |
0028 | 711-04-00100 | Geotextile Fabric | 979 | SQYD | 2.75 | 2,692.25 | 2.50 | 2,447.50 |
0029 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 131,500.00 | 131,500.00 | 100,000.00 | 100,000.00 |
0030 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 44 | LNFT | 20.00 | 880.00 | 20.00 | 880.00 |
0031 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 7.884 | MILE | 350.00 | 2,759.40 | 500.00 | 3,942.00 |
0032 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 3.695 | MILE | 1,000.00 | 3,695.00 | 1,000.00 | 3,695.00 |
0033 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 27.786 | MILE | 1,500.00 | 41,679.00 | 1,500.00 | 41,679.00 |
0034 | 716-01-00100 | Mulch (Vegetative) | 10 | TON | 700.00 | 7,000.00 | 950.00 | 9,500.00 |
0035 | 717-01-00100 | Seeding | 300 | LB | 12.00 | 3,600.00 | 12.50 | 3,750.00 |
0036 | 718-01-00100 | Fertilizer | 5,000 | LB | 0.65 | 3,250.00 | 0.65 | 3,250.00 |
0037 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 8.414 | MILE | 1,164.00 | 9,793.90 | 2,000.00 | 16,828.00 |
0038 | 726-01-00100 | Bedding Material | 123.2 | CUYD | 103.00 | 12,689.60 | 85.00 | 10,472.00 |
0039 | 727-01-00100 | Mobilization | 1 | LUMP | 131,500.00 | 131,500.00 | 140,000.00 | 140,000.00 |
0040 | 729-16-00200 | Object Marker Assembly (Type 2) | 20 | EACH | 65.00 | 1,300.00 | 80.00 | 1,600.00 |
0041 | 729-16-00300 | Object Marker Assembly (Type 3) | 8 | EACH | 105.00 | 840.00 | 110.00 | 880.00 |
0042 | 731-01-00100 | Nonreflectorized Raised Pavement Markers | 40 | EACH | 30.00 | 1,200.00 | 30.00 | 1,200.00 |
0043 | 731-02-00100 | Reflectorized Raised Pavement Markers | 1,133 | EACH | 7.00 | 7,931.00 | 7.00 | 7,931.00 |
0044 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 22 | LNFT | 40.00 | 880.00 | 40.00 | 880.00 |
0045 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 13.893 | MILE | 3,800.00 | 52,793.40 | 3,800.00 | 52,793.40 |
0046 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 1.848 | MILE | 2,000.00 | 3,696.00 | 2,000.00 | 3,696.00 |
0047 | 735-01-00100 | Mailboxes | 8 | EACH | 5.00 | 40.00 | 75.00 | 600.00 |
0048 | 735-02-00100 | Mailbox Supports (Single) | 8 | EACH | 170.00 | 1,360.00 | 150.00 | 1,200.00 |
0049 | 740-01-00100 | Construction Layout | 1 | LUMP | 20,000.00 | 20,000.00 | 100,000.00 | 100,000.00 |
0050 | 805-17-00100 | Reinforced Concrete Box Culvert Headwall Class A1 Concrete 15.08 cuyds
Deformed Steel 883 lbs | 2 | EACH | 33,000.00 | 66,000.00 | 60,000.00 | 120,000.00 |
0051 | 201-01-00200 | Clearing and Grubbing (Selective) | 0.202 | LUMP | 12,000.00 | 12,000.00 | 100,000.00 | 100,000.00 |
0052 | 732-05-00100 | Removal of Existing Markings | 0.014 | MILE | 10,000.00 | 140.00 | 400,000.00 | 5,600.00 |
| | | | | | | | |
| | CONTRACTOR TOTAL | | | | 2,521,217.83 | | 3,300,012.57 |