Bid Tabulations for the Letting of 8/11/2021 LA DOTD Headquarters

Proposal:H.001971.6
Parish:Richland
Routes:LA 132
Description:LA 132: LA 561 - LA 135
Type Construction:CLEARING AND GRUBBING, DRAINAGE STRUCTURES, MILLING ASPHALT CONCRETE, LIME TREATMENT, IN-PLACE CEMENT TREATED BASE COURSE, ASPHALT CONCRETE OVERLAY AND RELATED WORK.
Estimated Construction Cost:$3,324,378.20
105789D & J CONSTRUCTION CO., LLC$3,264,159.35
212487Diamond B Construction Co., L.L.C.$3,496,489.55
312312GILCHRIST CONSTRUCTION COMPANY, LLC$3,595,457.27


Line
Number
Item NumberItem DescriptionQuantityUnit of
Measure
- 1 -
D & J CONSTRUCTION CO., LLC
- 2 -
Diamond B Construction Co., L.L.C.
- 3 -
GILCHRIST CONSTRUCTION COMPANY, LLC
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
0001201-01-00200Clearing and Grubbing (Selective) APPROX. 2.607 ACRES2.607 LUMP30,000.0030,000.0040,000.0040,000.0095,000.0095,000.00
0002202-01-00100Removal of Structures and Obstructions 1     LUMP700.00700.001,000.001,000.001,000.001,000.00
0003202-02-06100Removal of Concrete Walks and Drives 73     SQYD15.001,095.0050.003,650.0040.002,920.00
0004202-02-32100Removal of Pipe (Cross Drain) 18" RCP38     LNFT15.00570.0080.003,040.0070.002,660.00
0005202-02-32100Removal of Pipe (Cross Drain) 24" CMP48     LNFT15.00720.0075.003,600.0070.003,360.00
0006202-02-32100Removal of Pipe (Cross Drain) 24" RCP407     LNFT15.006,105.00100.0040,700.0090.0036,630.00
0007202-02-32100Removal of Pipe (Cross Drain) 30" CMP24     LNFT15.00360.00200.004,800.00180.004,320.00
0008202-02-32100Removal of Pipe (Cross Drain) 42" RCP45     LNFT15.00675.00135.006,075.00120.005,400.00
0009203-07-00100Borrow (Vehicular Measurement) 8,996     CUYD28.00251,888.0010.0089,960.0025.00224,900.00
0010203-10-00100Cleaning Existing Ditches 420     LNFT9.003,780.0016.006,720.0015.006,300.00
0011204-06-00100Temporary Silt Fencing 2,126     LNFT4.008,504.002.004,252.002.004,252.00
0012303-02-00100Removal of Existing Patches 640     SQYD10.006,400.008.005,120.0018.0011,520.00
0013303-03-00400In-Place Cement Treated Base Course (12" Thick) 77,556.3   SQYD8.00620,450.4010.00775,563.008.00620,450.40
0014304-01-00100Lime 67.2   TON270.0018,144.00250.0016,800.00265.0017,808.00
0015304-03-00400Lime Treatment (Type C) (12" Thick) 5,333     SQYD7.5039,997.506.0031,998.005.5029,331.50
0016401-02-00100Aggregate Surface Course (Adjusted Vehicular Measurement) 1,847     CUYD75.00138,525.0090.00166,230.00100.00184,700.00
0017402-01-00100Mainline Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) 213.8   CUYD50.0010,690.0040.008,552.00135.0028,863.00
0018502-01-00100Asphalt Concrete 13,957.1   TON107.001,493,409.70103.001,437,581.30100.001,395,710.00
0019502-01-00200Asphalt Concrete, Drives, Turnouts and Miscellaneous 777.1   TON162.00125,890.20196.00152,311.60100.0077,710.00
0020509-01-00100Milling Asphalt Pavement 1,469     SQYD10.0014,690.008.0011,752.0020.0029,380.00
0021509-02-00100Contractor Retained Reclaimed Asphalt Pavement -41     CUYD1.00-41.000.10-4.101.00-41.00
0022701-01-01001Cross Drain Pipe (24" RCP) 124     LNFT155.0019,220.00175.0021,700.00170.0021,080.00
0023701-01-01021Cross Drain Pipe (30" RCP) 48     LNFT175.008,400.00240.0011,520.00215.0010,320.00
0024701-01-02005Cross Drain Pipe (24" RCP/RPVCP/CPEPDW/CMP) 40     LNFT155.006,200.00245.009,800.00225.009,000.00
0025701-02-01000Cross Drain Pipe Arch (24" Equiv. RCPA) 240     LNFT155.0037,200.00195.0046,800.00195.0046,800.00
0026701-02-01020Cross Drain Pipe Arch (30" Equiv. RCPA) 48     LNFT175.008,400.00245.0011,760.00200.009,600.00
0027701-02-01060Cross Drain Pipe Arch (42" Equiv. RCPA) 48     LNFT260.0012,480.00345.0016,560.00325.0015,600.00
0028701-02-02001Cross Drain Pipe Arch (24" Equiv. RCPA or 24" Equiv. CMPA) 40     LNFT160.006,400.00325.0013,000.00305.0012,200.00
0029701-10-01060Reinforced Concrete Pipe (Extension) (24") 22     LNFT140.003,080.00200.004,400.00185.004,070.00
0030701-15-00100Concrete Collar 33     EACH760.0025,080.002,000.0066,000.002,100.0069,300.00
0031701-17-00100Trench Excavation Safety Protection (Depth >5 feet) 516     LNFT1.00516.004.002,064.005.002,580.00
0032706-02-00200Concrete Drive (6" Thick) 73.8   SQYD85.006,273.00110.008,118.00110.008,118.00
0033711-01-04000Riprap (55 lb, 18" Thick) 55     SQYD85.004,675.00175.009,625.00175.009,625.00
0034711-04-00100Geotextile Fabric 55     SQYD5.00275.003.30181.503.00165.00
0035713-01-00100Temporary Signs and Barricades 1     LUMP50,000.0050,000.0035,000.0035,000.0060,000.0060,000.00
0036713-03-01000Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) 10.814 MILE175.001,892.45175.001,892.45240.002,595.36
0037713-03-02000Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) 6.902 MILE500.003,451.00550.003,796.101.006.90
0038713-04-01000Temporary Pavement Markings (Solid Line) (4" Width) 33.706 MILE500.0016,853.00900.0030,335.401.0033.71
0039716-01-00100Mulch (Vegetative) 21.1   TON600.0012,660.00550.0011,605.00550.0011,605.00
0040717-01-00100Seeding 633     LB11.006,963.0012.007,596.0012.007,596.00
0041718-01-00100Fertilizer 10,548     LB0.555,801.400.454,746.600.454,746.60
0042722-02-00100Project Site Laboratory (Equipped) 1     EACH9,000.009,000.0025,000.0025,000.0012,000.0012,000.00
0043726-01-00100Bedding Material 295.2   CUYD100.0029,520.00125.0036,900.00120.0035,424.00
0044727-01-00100Mobilization 1     LUMP100,000.00100,000.00192,500.00192,500.00350,000.00350,000.00
0045729-16-00300Object Marker Assembly (Type 3) 38     EACH100.003,800.00100.003,800.0090.003,420.00
0046731-02-00100Reflectorized Raised Pavement Markers 972     EACH7.006,804.007.507,290.009.008,748.00
0047732-02-02000Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) 16.853 MILE3,900.0065,726.704,200.0070,782.604,600.0077,523.80
0048732-03-02000Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) 3.451 MILE1,000.003,451.001,100.003,796.102,000.006,902.00
0049735-01-00100Mailboxes 27     EACH5.00135.0010.00270.002.0054.00
0050735-02-00100Mailbox Supports (Single) 21     EACH175.003,675.00200.004,200.00170.003,570.00
0051735-03-00100Mailbox Supports (Double) 3     EACH225.00675.00250.00750.00200.00600.00
0052740-01-00100Construction Layout 1     LUMP33,000.0033,000.0025,000.0025,000.0010,000.0010,000.00
           
  CONTRACTOR TOTAL   3,264,159.35 3,496,489.55 3,595,457.27