Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - D & J CONSTRUCTION CO., LLC | - 2 - Diamond B Construction Co., L.L.C. | - 3 - GILCHRIST CONSTRUCTION COMPANY, LLC |
Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount |
0001 | 201-01-00200 | Clearing and Grubbing (Selective) APPROX. 2.607 ACRES | 2.607 | LUMP | 30,000.00 | 30,000.00 | 40,000.00 | 40,000.00 | 95,000.00 | 95,000.00 |
0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 700.00 | 700.00 | 1,000.00 | 1,000.00 | 1,000.00 | 1,000.00 |
0003 | 202-02-06100 | Removal of Concrete Walks and Drives | 73 | SQYD | 15.00 | 1,095.00 | 50.00 | 3,650.00 | 40.00 | 2,920.00 |
0004 | 202-02-32100 | Removal of Pipe (Cross Drain) 18" RCP | 38 | LNFT | 15.00 | 570.00 | 80.00 | 3,040.00 | 70.00 | 2,660.00 |
0005 | 202-02-32100 | Removal of Pipe (Cross Drain) 24" CMP | 48 | LNFT | 15.00 | 720.00 | 75.00 | 3,600.00 | 70.00 | 3,360.00 |
0006 | 202-02-32100 | Removal of Pipe (Cross Drain) 24" RCP | 407 | LNFT | 15.00 | 6,105.00 | 100.00 | 40,700.00 | 90.00 | 36,630.00 |
0007 | 202-02-32100 | Removal of Pipe (Cross Drain) 30" CMP | 24 | LNFT | 15.00 | 360.00 | 200.00 | 4,800.00 | 180.00 | 4,320.00 |
0008 | 202-02-32100 | Removal of Pipe (Cross Drain) 42" RCP | 45 | LNFT | 15.00 | 675.00 | 135.00 | 6,075.00 | 120.00 | 5,400.00 |
0009 | 203-07-00100 | Borrow (Vehicular Measurement) | 8,996 | CUYD | 28.00 | 251,888.00 | 10.00 | 89,960.00 | 25.00 | 224,900.00 |
0010 | 203-10-00100 | Cleaning Existing Ditches | 420 | LNFT | 9.00 | 3,780.00 | 16.00 | 6,720.00 | 15.00 | 6,300.00 |
0011 | 204-06-00100 | Temporary Silt Fencing | 2,126 | LNFT | 4.00 | 8,504.00 | 2.00 | 4,252.00 | 2.00 | 4,252.00 |
0012 | 303-02-00100 | Removal of Existing Patches | 640 | SQYD | 10.00 | 6,400.00 | 8.00 | 5,120.00 | 18.00 | 11,520.00 |
0013 | 303-03-00400 | In-Place Cement Treated Base Course (12" Thick) | 77,556.3 | SQYD | 8.00 | 620,450.40 | 10.00 | 775,563.00 | 8.00 | 620,450.40 |
0014 | 304-01-00100 | Lime | 67.2 | TON | 270.00 | 18,144.00 | 250.00 | 16,800.00 | 265.00 | 17,808.00 |
0015 | 304-03-00400 | Lime Treatment (Type C) (12" Thick) | 5,333 | SQYD | 7.50 | 39,997.50 | 6.00 | 31,998.00 | 5.50 | 29,331.50 |
0016 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 1,847 | CUYD | 75.00 | 138,525.00 | 90.00 | 166,230.00 | 100.00 | 184,700.00 |
0017 | 402-01-00100 | Mainline Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 213.8 | CUYD | 50.00 | 10,690.00 | 40.00 | 8,552.00 | 135.00 | 28,863.00 |
0018 | 502-01-00100 | Asphalt Concrete | 13,957.1 | TON | 107.00 | 1,493,409.70 | 103.00 | 1,437,581.30 | 100.00 | 1,395,710.00 |
0019 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 777.1 | TON | 162.00 | 125,890.20 | 196.00 | 152,311.60 | 100.00 | 77,710.00 |
0020 | 509-01-00100 | Milling Asphalt Pavement | 1,469 | SQYD | 10.00 | 14,690.00 | 8.00 | 11,752.00 | 20.00 | 29,380.00 |
0021 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -41 | CUYD | 1.00 | -41.00 | 0.10 | -4.10 | 1.00 | -41.00 |
0022 | 701-01-01001 | Cross Drain Pipe (24" RCP) | 124 | LNFT | 155.00 | 19,220.00 | 175.00 | 21,700.00 | 170.00 | 21,080.00 |
0023 | 701-01-01021 | Cross Drain Pipe (30" RCP) | 48 | LNFT | 175.00 | 8,400.00 | 240.00 | 11,520.00 | 215.00 | 10,320.00 |
0024 | 701-01-02005 | Cross Drain Pipe (24" RCP/RPVCP/CPEPDW/CMP) | 40 | LNFT | 155.00 | 6,200.00 | 245.00 | 9,800.00 | 225.00 | 9,000.00 |
0025 | 701-02-01000 | Cross Drain Pipe Arch (24" Equiv. RCPA) | 240 | LNFT | 155.00 | 37,200.00 | 195.00 | 46,800.00 | 195.00 | 46,800.00 |
0026 | 701-02-01020 | Cross Drain Pipe Arch (30" Equiv. RCPA) | 48 | LNFT | 175.00 | 8,400.00 | 245.00 | 11,760.00 | 200.00 | 9,600.00 |
0027 | 701-02-01060 | Cross Drain Pipe Arch (42" Equiv. RCPA) | 48 | LNFT | 260.00 | 12,480.00 | 345.00 | 16,560.00 | 325.00 | 15,600.00 |
0028 | 701-02-02001 | Cross Drain Pipe Arch (24" Equiv. RCPA or 24" Equiv. CMPA) | 40 | LNFT | 160.00 | 6,400.00 | 325.00 | 13,000.00 | 305.00 | 12,200.00 |
0029 | 701-10-01060 | Reinforced Concrete Pipe (Extension) (24") | 22 | LNFT | 140.00 | 3,080.00 | 200.00 | 4,400.00 | 185.00 | 4,070.00 |
0030 | 701-15-00100 | Concrete Collar | 33 | EACH | 760.00 | 25,080.00 | 2,000.00 | 66,000.00 | 2,100.00 | 69,300.00 |
0031 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 516 | LNFT | 1.00 | 516.00 | 4.00 | 2,064.00 | 5.00 | 2,580.00 |
0032 | 706-02-00200 | Concrete Drive (6" Thick) | 73.8 | SQYD | 85.00 | 6,273.00 | 110.00 | 8,118.00 | 110.00 | 8,118.00 |
0033 | 711-01-04000 | Riprap (55 lb, 18" Thick) | 55 | SQYD | 85.00 | 4,675.00 | 175.00 | 9,625.00 | 175.00 | 9,625.00 |
0034 | 711-04-00100 | Geotextile Fabric | 55 | SQYD | 5.00 | 275.00 | 3.30 | 181.50 | 3.00 | 165.00 |
0035 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 50,000.00 | 50,000.00 | 35,000.00 | 35,000.00 | 60,000.00 | 60,000.00 |
0036 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 10.814 | MILE | 175.00 | 1,892.45 | 175.00 | 1,892.45 | 240.00 | 2,595.36 |
0037 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 6.902 | MILE | 500.00 | 3,451.00 | 550.00 | 3,796.10 | 1.00 | 6.90 |
0038 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 33.706 | MILE | 500.00 | 16,853.00 | 900.00 | 30,335.40 | 1.00 | 33.71 |
0039 | 716-01-00100 | Mulch (Vegetative) | 21.1 | TON | 600.00 | 12,660.00 | 550.00 | 11,605.00 | 550.00 | 11,605.00 |
0040 | 717-01-00100 | Seeding | 633 | LB | 11.00 | 6,963.00 | 12.00 | 7,596.00 | 12.00 | 7,596.00 |
0041 | 718-01-00100 | Fertilizer | 10,548 | LB | 0.55 | 5,801.40 | 0.45 | 4,746.60 | 0.45 | 4,746.60 |
0042 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 9,000.00 | 9,000.00 | 25,000.00 | 25,000.00 | 12,000.00 | 12,000.00 |
0043 | 726-01-00100 | Bedding Material | 295.2 | CUYD | 100.00 | 29,520.00 | 125.00 | 36,900.00 | 120.00 | 35,424.00 |
0044 | 727-01-00100 | Mobilization | 1 | LUMP | 100,000.00 | 100,000.00 | 192,500.00 | 192,500.00 | 350,000.00 | 350,000.00 |
0045 | 729-16-00300 | Object Marker Assembly (Type 3) | 38 | EACH | 100.00 | 3,800.00 | 100.00 | 3,800.00 | 90.00 | 3,420.00 |
0046 | 731-02-00100 | Reflectorized Raised Pavement Markers | 972 | EACH | 7.00 | 6,804.00 | 7.50 | 7,290.00 | 9.00 | 8,748.00 |
0047 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 16.853 | MILE | 3,900.00 | 65,726.70 | 4,200.00 | 70,782.60 | 4,600.00 | 77,523.80 |
0048 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 3.451 | MILE | 1,000.00 | 3,451.00 | 1,100.00 | 3,796.10 | 2,000.00 | 6,902.00 |
0049 | 735-01-00100 | Mailboxes | 27 | EACH | 5.00 | 135.00 | 10.00 | 270.00 | 2.00 | 54.00 |
0050 | 735-02-00100 | Mailbox Supports (Single) | 21 | EACH | 175.00 | 3,675.00 | 200.00 | 4,200.00 | 170.00 | 3,570.00 |
0051 | 735-03-00100 | Mailbox Supports (Double) | 3 | EACH | 225.00 | 675.00 | 250.00 | 750.00 | 200.00 | 600.00 |
0052 | 740-01-00100 | Construction Layout | 1 | LUMP | 33,000.00 | 33,000.00 | 25,000.00 | 25,000.00 | 10,000.00 | 10,000.00 |
| | | | | | | | | | |
| | CONTRACTOR TOTAL | | | | 3,264,159.35 | | 3,496,489.55 | | 3,595,457.27 |