Bid Tabulations for the Letting of 5/12/2021 LA DOTD Headquarters

Proposal:H.014473.6
Parish:St. James
Routes:LA 3125, LA 641
Description:LA 641 & LA 3125: INT. IMPROVEMENTS
Type Construction:GRADING, MILLING ASPHALT CONCRETE, CLASS II BASE COURSE, LIME TREATMENT, ASPHALT CONCRETE OVERLAY AND RELATED WORK.
Estimated Construction Cost:$473,065.10
106276Barriere Construction Co., LLC$313,749.68
200046Barber Bros. Contracting Co., L.L.C$319,176.95


Line
Number
Item NumberItem DescriptionQuantityUnit of
Measure
- 1 -
Barriere Construction Co., LLC
- 2 -
Barber Bros. Contracting Co., L.L.C
Unit PriceTotal
Amount
Unit PriceTotal
Amount
0001202-02-02020Removal of Asphalt Pavement 1,387.6   SQYD7.009,713.2015.0020,814.00
0002202-02-03000Removal of Base – Soil Cement, Asphalt, or BCS 1,387.6   SQYD10.0013,876.005.006,938.00
0003202-02-06100Removal of Concrete Walks and Drives 30.2   SQYD25.00755.0040.001,208.00
0004202-03-38000Relocation of Sign ROUTE SIGN1     EACH650.00650.00550.00550.00
0005203-05-00100Excavation and Embankment 1     LUMP30,000.0030,000.0032,000.0032,000.00
0006204-06-00100Temporary Silt Fencing 714     LNFT1.501,071.001.25892.50
0007302-02-06030Class II Base Course (6" Thick) (Asphalt Concrete Base) 1,661     SQYD30.0049,830.0041.0068,101.00
0008304-01-00100Lime 5.61  TON406.502,280.47400.002,244.00
0009304-05-00100Lime Treatment (Type E) 416     SQYD30.7512,792.008.003,328.00
0010402-03-00100Non-Mainline Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) 50     CUYD10.00500.0035.001,750.00
0011502-01-00100Asphalt Concrete 553.9   TON160.0088,624.00142.0078,653.80
0012509-01-00100Milling Asphalt Pavement 250     SQYD12.753,187.5013.003,250.00
0013509-02-00100Contractor Retained Reclaimed Asphalt Pavement -14     CUYD0.01-0.140.000.00
0014706-02-00200Concrete Drive (6" Thick) 45.3   SQYD90.004,077.00180.008,154.00
0015713-01-00100Temporary Signs and Barricades 1     LUMP30,000.0030,000.0030,000.0030,000.00
0016713-02-00100Temporary Pavement Markings (4" Width) 1,534     LNFT1.001,534.001.001,534.00
0017713-02-00300Temporary Pavement Markings (8" Width) 320     LNFT2.25720.002.00640.00
0018713-02-00500Temporary Pavement Markings (24" Width) 298     LNFT6.001,788.003.00894.00
0019713-05-00230Temporary Pavement Legends & Symbols (Arrow - Right Turn) 8     EACH1.008.00100.00800.00
0020724-02-00100Rumble Strips (Shoulder/Edge) 0.135 MILE650.0087.75750.00101.25
0021727-01-00100Mobilization 1     LUMP30,000.0030,000.0031,000.0031,000.00
0022731-02-00100Reflectorized Raised Pavement Markers 117     EACH18.002,106.0016.001,872.00
0023732-01-01000Plastic Pavement Striping (4" Width) (Thermoplastic 90 mil) 1,622     LNFT2.504,055.003.155,109.30
0024732-01-01040Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) 160     LNFT5.00800.006.301,008.00
0025732-01-02080Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) 269     LNFT20.005,380.0021.005,649.00
0026732-03-02040Plastic Pavement Striping (Dotted Line)(8" W)(3' L)(Thermo 90 mil) 0.09  MILE20,000.001,800.0015,800.001,422.00
0027732-04-01100Plastic Pavement Legends and Symbols (Arrow - Right Turn) 4     EACH550.002,200.00525.002,100.00
0028732-05-00100Removal of Existing Markings 0.064 MILE35,000.002,240.0024,700.001,580.80
0029739-01-00100Hydro-Seeding 0.164 ACRE2,100.00344.402,400.00393.60
0030740-01-00100Construction Layout 1     LUMP4,500.004,500.003,500.003,500.00
0031NS-500-00340Saw Cutting Asphalt Concrete Pavement 8,568     INLF1.008,568.000.403,427.20
0032NS-600-00220Saw Cutting Portland Cement Concrete Pavement 210     INLF1.25262.501.25262.50
         
  CONTRACTOR TOTAL   313,749.68 319,176.95