Bid Tabulations for the Letting of 5/12/2021 LA DOTD Headquarters

Proposal:H.014126.6
Parish:Catahoula
Routes:LA 914, LA 915, LA 916
Description:LA 914, LA 915, LA 916 OVERLAY
Type Construction:CLEARING AND GRUBBING, DRAINAGE STRUCTURES, MILLING ASPHALT CONCRETE, PAVEMENT PATCHING, ASPHALT SURFACE TREATMENT, ASPHALT CONCRETE OVERLAY, AND RELATED WORK.
Estimated Construction Cost:$1,724,642.12
105789D & J CONSTRUCTION CO., LLC$1,640,893.05
212312GILCHRIST CONSTRUCTION COMPANY, LLC$2,013,457.76
312487Diamond B Construction Co., L.L.C.$2,136,582.81


Line
Number
Item NumberItem DescriptionQuantityUnit of
Measure
- 1 -
D & J CONSTRUCTION CO., LLC
- 2 -
GILCHRIST CONSTRUCTION COMPANY, LLC
- 3 -
Diamond B Construction Co., L.L.C.
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
0001201-01-00200Clearing and Grubbing (Selective) 5.752 LUMP29,000.0029,000.0060,000.0060,000.0042,000.0042,000.00
0002202-02-00010Removal of SPECIALTY MAILBOX1     EACH600.00600.005,500.005,500.001,800.001,800.00
0003202-02-14500Removal of Guard Rail 682     LNFT16.0010,912.006.004,092.0015.0010,230.00
0004202-02-32100Removal of Pipe (Cross Drain) 24"12     LNFT12.00144.0050.00600.00120.001,440.00
0005202-02-32100Removal of Pipe (Cross Drain) 24", 30"152     LNFT12.001,824.0050.007,600.0040.006,080.00
0006202-02-32100Removal of Pipe (Cross Drain) 48"4     LNFT12.0048.0050.00200.00200.00800.00
0007203-07-00100Borrow (Vehicular Measurement) 309     CUYD45.0013,905.0075.0023,175.0030.009,270.00
0008204-02-00100Temporary Hay Bales 24     EACH30.00720.0060.001,440.0055.001,320.00
0009401-02-00100Aggregate Surface Course (Adjusted Vehicular Measurement) 1,342     CUYD70.0093,940.00110.00147,620.00150.00201,300.00
0010402-01-00100Mainline Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) 22.8   CUYD70.001,596.0070.001,596.0075.001,710.00
0011502-01-00100Asphalt Concrete 8,181.1   TON96.00785,385.60100.00818,110.00111.00908,102.10
0012502-01-00200Asphalt Concrete, Drives, Turnouts and Miscellaneous 744.4   TON96.0071,462.40100.0074,440.00210.00156,324.00
0013507-01-00100Asphalt Material (CRS-2P Emulsion) 22,678     GAL2.7562,364.503.0068,034.002.7562,364.50
0014507-02-00300Aggregate (S3) 73,157     SQYD1.1584,130.551.2591,446.251.2591,446.25
0015509-01-00100Milling Asphalt Pavement 23,701     SQYD3.0071,103.004.0094,804.002.2553,327.25
0016509-02-00100Contractor Retained Reclaimed Asphalt Pavement -293     CUYD1.00-293.001.00-293.001.00-293.00
0017510-01-00200Pavement Patching (12" Minimum Thickness) 520     SQYD145.0075,400.00125.0065,000.0098.0050,960.00
0018701-02-02080Cross Drain Pipe Arch (36" Equiv. RCPA or 42" Equiv. CMPA) 96     LNFT200.0019,200.00300.0028,800.00275.0026,400.00
0019701-10-01060Reinforced Concrete Pipe (Extension) (24") 24     LNFT160.003,840.00500.0012,000.00475.0011,400.00
0020701-10-01140Reinforced Concrete Pipe (Extension) (48") 8     LNFT325.002,600.00700.005,600.00450.003,600.00
0021701-14-00100Cleaning Existing Pipes 50     LNFT30.001,500.0050.002,500.00130.006,500.00
0022701-15-00100Concrete Collar 4     EACH800.003,200.003,000.0012,000.002,200.008,800.00
0023704-01-01000Guard Rail (Single Thrie Beam) (3'-1 1/2" post spacing) 175     LNFT60.0010,500.00105.0018,375.0060.0010,500.00
0024704-01-01020Guard Rail (Single Thrie Beam) (6'-3" post spacing) 264     LNFT150.0039,600.00120.0031,680.00145.0038,280.00
0025704-03-00200Blocked Out Guard Rail - 31", (6'-3" Post Spacing) 87.5   LNFT30.002,625.0022.001,925.0025.002,187.50
0026704-10-00105Guard Rail End Treatment (Flared, 12' - 6" Length) 2     EACH3,600.007,200.004,300.008,600.004,250.008,500.00
0027704-10-00120Guard Rail End Treatment, MASH, (TL-3 Flared) 5     EACH3,400.0017,000.003,500.0017,500.003,550.0017,750.00
0028704-10-00310Guard Rail End Treatment, NCHRP 350 - 31" (TL-3 Flared) 1     EACH3,350.003,350.001,300.001,300.003,750.003,750.00
0029711-01-04000Riprap (55 lb, 18" Thick) 22     SQYD95.002,090.00220.004,840.00300.006,600.00
0030713-01-00100Temporary Signs and Barricades 1     LUMP30,000.0030,000.0035,000.0035,000.0034,500.0034,500.00
0031713-03-01000Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) 12.445 MILE200.002,489.00210.002,613.45154.001,916.53
0032713-03-02000Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) 5.781 MILE100.00578.1010.5060.70500.002,890.50
0033713-04-01000Temporary Pavement Markings (Solid Line) (4" Width) 33.701 MILE100.003,370.1010.50353.86875.0029,488.38
0034713-06-00200Temporary Reflectorized Raised Pavement Markers (Tabs) 1,646     EACH2.003,292.002.504,115.002.003,292.00
0035720-01-01000Erosion Control System (Slope Protection) (Type A) 480     SQYD5.002,400.003.251,560.003.001,440.00
0036726-01-00100Bedding Material 47.6   CUYD100.004,760.00150.007,140.00115.005,474.00
0037727-01-00100Mobilization 1     LUMP80,000.0080,000.00200,000.00200,000.00195,000.00195,000.00
0038729-16-00200Object Marker Assembly (Type 2) 10     EACH100.001,000.0065.00650.00100.001,000.00
0039729-16-00300Object Marker Assembly (Type 3) 8     EACH110.00880.00135.001,080.00110.00880.00
0040731-02-00100Reflectorized Raised Pavement Markers 1,264     EACH6.007,584.008.0010,112.007.008,848.00
0041732-02-02000Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) 20.593 MILE3,600.0074,134.804,500.0092,668.503,850.0079,283.05
0042732-03-02000Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) 2.891 MILE1,000.002,891.002,000.005,782.00950.002,746.45
0043735-01-00100Mailboxes 36     EACH5.00180.006.00216.0027.00972.00
0044735-02-00100Mailbox Supports (Single) 34     EACH135.004,590.00200.006,800.00177.006,018.00
0045735-03-00100Mailbox Supports (Double) 1     EACH225.00225.00250.00250.00215.00215.00
0046739-01-00100Hydro-Seeding 0.131 ACRE12,000.001,572.0012,000.001,572.001,300.00170.30
0047740-01-00100Construction Layout 1     LUMP6,000.006,000.0035,000.0035,000.0020,000.0020,000.00
           
  CONTRACTOR TOTAL   1,640,893.05 2,013,457.76 2,136,582.81