Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - D & J CONSTRUCTION CO., LLC | - 2 - GILCHRIST CONSTRUCTION COMPANY, LLC | - 3 - Diamond B Construction Co., L.L.C. |
Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount |
0001 | 201-01-00200 | Clearing and Grubbing (Selective) | 5.752 | LUMP | 29,000.00 | 29,000.00 | 60,000.00 | 60,000.00 | 42,000.00 | 42,000.00 |
0002 | 202-02-00010 | Removal of SPECIALTY MAILBOX | 1 | EACH | 600.00 | 600.00 | 5,500.00 | 5,500.00 | 1,800.00 | 1,800.00 |
0003 | 202-02-14500 | Removal of Guard Rail | 682 | LNFT | 16.00 | 10,912.00 | 6.00 | 4,092.00 | 15.00 | 10,230.00 |
0004 | 202-02-32100 | Removal of Pipe (Cross Drain) 24" | 12 | LNFT | 12.00 | 144.00 | 50.00 | 600.00 | 120.00 | 1,440.00 |
0005 | 202-02-32100 | Removal of Pipe (Cross Drain) 24", 30" | 152 | LNFT | 12.00 | 1,824.00 | 50.00 | 7,600.00 | 40.00 | 6,080.00 |
0006 | 202-02-32100 | Removal of Pipe (Cross Drain) 48" | 4 | LNFT | 12.00 | 48.00 | 50.00 | 200.00 | 200.00 | 800.00 |
0007 | 203-07-00100 | Borrow (Vehicular Measurement) | 309 | CUYD | 45.00 | 13,905.00 | 75.00 | 23,175.00 | 30.00 | 9,270.00 |
0008 | 204-02-00100 | Temporary Hay Bales | 24 | EACH | 30.00 | 720.00 | 60.00 | 1,440.00 | 55.00 | 1,320.00 |
0009 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 1,342 | CUYD | 70.00 | 93,940.00 | 110.00 | 147,620.00 | 150.00 | 201,300.00 |
0010 | 402-01-00100 | Mainline Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 22.8 | CUYD | 70.00 | 1,596.00 | 70.00 | 1,596.00 | 75.00 | 1,710.00 |
0011 | 502-01-00100 | Asphalt Concrete | 8,181.1 | TON | 96.00 | 785,385.60 | 100.00 | 818,110.00 | 111.00 | 908,102.10 |
0012 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 744.4 | TON | 96.00 | 71,462.40 | 100.00 | 74,440.00 | 210.00 | 156,324.00 |
0013 | 507-01-00100 | Asphalt Material (CRS-2P Emulsion) | 22,678 | GAL | 2.75 | 62,364.50 | 3.00 | 68,034.00 | 2.75 | 62,364.50 |
0014 | 507-02-00300 | Aggregate (S3) | 73,157 | SQYD | 1.15 | 84,130.55 | 1.25 | 91,446.25 | 1.25 | 91,446.25 |
0015 | 509-01-00100 | Milling Asphalt Pavement | 23,701 | SQYD | 3.00 | 71,103.00 | 4.00 | 94,804.00 | 2.25 | 53,327.25 |
0016 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -293 | CUYD | 1.00 | -293.00 | 1.00 | -293.00 | 1.00 | -293.00 |
0017 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 520 | SQYD | 145.00 | 75,400.00 | 125.00 | 65,000.00 | 98.00 | 50,960.00 |
0018 | 701-02-02080 | Cross Drain Pipe Arch (36" Equiv. RCPA or 42" Equiv. CMPA) | 96 | LNFT | 200.00 | 19,200.00 | 300.00 | 28,800.00 | 275.00 | 26,400.00 |
0019 | 701-10-01060 | Reinforced Concrete Pipe (Extension) (24") | 24 | LNFT | 160.00 | 3,840.00 | 500.00 | 12,000.00 | 475.00 | 11,400.00 |
0020 | 701-10-01140 | Reinforced Concrete Pipe (Extension) (48") | 8 | LNFT | 325.00 | 2,600.00 | 700.00 | 5,600.00 | 450.00 | 3,600.00 |
0021 | 701-14-00100 | Cleaning Existing Pipes | 50 | LNFT | 30.00 | 1,500.00 | 50.00 | 2,500.00 | 130.00 | 6,500.00 |
0022 | 701-15-00100 | Concrete Collar | 4 | EACH | 800.00 | 3,200.00 | 3,000.00 | 12,000.00 | 2,200.00 | 8,800.00 |
0023 | 704-01-01000 | Guard Rail (Single Thrie Beam) (3'-1 1/2" post spacing) | 175 | LNFT | 60.00 | 10,500.00 | 105.00 | 18,375.00 | 60.00 | 10,500.00 |
0024 | 704-01-01020 | Guard Rail (Single Thrie Beam) (6'-3" post spacing) | 264 | LNFT | 150.00 | 39,600.00 | 120.00 | 31,680.00 | 145.00 | 38,280.00 |
0025 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 87.5 | LNFT | 30.00 | 2,625.00 | 22.00 | 1,925.00 | 25.00 | 2,187.50 |
0026 | 704-10-00105 | Guard Rail End Treatment (Flared, 12' - 6" Length) | 2 | EACH | 3,600.00 | 7,200.00 | 4,300.00 | 8,600.00 | 4,250.00 | 8,500.00 |
0027 | 704-10-00120 | Guard Rail End Treatment, MASH, (TL-3 Flared) | 5 | EACH | 3,400.00 | 17,000.00 | 3,500.00 | 17,500.00 | 3,550.00 | 17,750.00 |
0028 | 704-10-00310 | Guard Rail End Treatment, NCHRP 350 - 31" (TL-3 Flared) | 1 | EACH | 3,350.00 | 3,350.00 | 1,300.00 | 1,300.00 | 3,750.00 | 3,750.00 |
0029 | 711-01-04000 | Riprap (55 lb, 18" Thick) | 22 | SQYD | 95.00 | 2,090.00 | 220.00 | 4,840.00 | 300.00 | 6,600.00 |
0030 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 30,000.00 | 30,000.00 | 35,000.00 | 35,000.00 | 34,500.00 | 34,500.00 |
0031 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 12.445 | MILE | 200.00 | 2,489.00 | 210.00 | 2,613.45 | 154.00 | 1,916.53 |
0032 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 5.781 | MILE | 100.00 | 578.10 | 10.50 | 60.70 | 500.00 | 2,890.50 |
0033 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 33.701 | MILE | 100.00 | 3,370.10 | 10.50 | 353.86 | 875.00 | 29,488.38 |
0034 | 713-06-00200 | Temporary Reflectorized Raised Pavement Markers (Tabs) | 1,646 | EACH | 2.00 | 3,292.00 | 2.50 | 4,115.00 | 2.00 | 3,292.00 |
0035 | 720-01-01000 | Erosion Control System (Slope Protection) (Type A) | 480 | SQYD | 5.00 | 2,400.00 | 3.25 | 1,560.00 | 3.00 | 1,440.00 |
0036 | 726-01-00100 | Bedding Material | 47.6 | CUYD | 100.00 | 4,760.00 | 150.00 | 7,140.00 | 115.00 | 5,474.00 |
0037 | 727-01-00100 | Mobilization | 1 | LUMP | 80,000.00 | 80,000.00 | 200,000.00 | 200,000.00 | 195,000.00 | 195,000.00 |
0038 | 729-16-00200 | Object Marker Assembly (Type 2) | 10 | EACH | 100.00 | 1,000.00 | 65.00 | 650.00 | 100.00 | 1,000.00 |
0039 | 729-16-00300 | Object Marker Assembly (Type 3) | 8 | EACH | 110.00 | 880.00 | 135.00 | 1,080.00 | 110.00 | 880.00 |
0040 | 731-02-00100 | Reflectorized Raised Pavement Markers | 1,264 | EACH | 6.00 | 7,584.00 | 8.00 | 10,112.00 | 7.00 | 8,848.00 |
0041 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 20.593 | MILE | 3,600.00 | 74,134.80 | 4,500.00 | 92,668.50 | 3,850.00 | 79,283.05 |
0042 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 2.891 | MILE | 1,000.00 | 2,891.00 | 2,000.00 | 5,782.00 | 950.00 | 2,746.45 |
0043 | 735-01-00100 | Mailboxes | 36 | EACH | 5.00 | 180.00 | 6.00 | 216.00 | 27.00 | 972.00 |
0044 | 735-02-00100 | Mailbox Supports (Single) | 34 | EACH | 135.00 | 4,590.00 | 200.00 | 6,800.00 | 177.00 | 6,018.00 |
0045 | 735-03-00100 | Mailbox Supports (Double) | 1 | EACH | 225.00 | 225.00 | 250.00 | 250.00 | 215.00 | 215.00 |
0046 | 739-01-00100 | Hydro-Seeding | 0.131 | ACRE | 12,000.00 | 1,572.00 | 12,000.00 | 1,572.00 | 1,300.00 | 170.30 |
0047 | 740-01-00100 | Construction Layout | 1 | LUMP | 6,000.00 | 6,000.00 | 35,000.00 | 35,000.00 | 20,000.00 | 20,000.00 |
| | | | | | | | | | |
| | CONTRACTOR TOTAL | | | | 1,640,893.05 | | 2,013,457.76 | | 2,136,582.81 |