Bid Tabulations for the Letting of 5/12/2021 LA DOTD Headquarters

Proposal:H.013925.6
Parish:Tensas
Routes:LA 4
Description:LA 4: LA 128 - 1.6 MI. E. LA 888
Type Construction:CLEARING AND GRUBBING, DRAINAGE STRUCTURES, MILLING ASPHALT CONCRETE, PAVEMENT PATCHING, PAVEMENT WIDENING, ASPHALT CONCRETE OVERLAY AND RELATED WORK.
Estimated Construction Cost:$1,900,055.61
105789D & J CONSTRUCTION CO., LLC$1,663,664.90
212312GILCHRIST CONSTRUCTION COMPANY, LLC$1,994,718.33
312487Diamond B Construction Co., L.L.C.$2,036,912.93


Line
Number
Item NumberItem DescriptionQuantityUnit of
Measure
- 1 -
D & J CONSTRUCTION CO., LLC
- 2 -
GILCHRIST CONSTRUCTION COMPANY, LLC
- 3 -
Diamond B Construction Co., L.L.C.
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
0001201-01-00200Clearing and Grubbing (Selective) 4.346 LUMP30,000.0030,000.0050,000.0050,000.0034,000.0034,000.00
0002202-02-00050Removal of Maintenance Material1     LUMP500.00500.0050,000.0050,000.003,000.003,000.00
0003202-02-02020Removal of Asphalt Pavement 281.7   SQYD12.003,380.4025.007,042.5010.002,817.00
0004202-02-14500Removal of Guard Rail 309     LNFT18.005,562.0010.003,090.0015.004,635.00
0005202-02-32100Removal of Pipe (Cross Drain) 42" EQUIV. CMPA62     LNFT12.00744.0020.001,240.0015.00930.00
0006203-07-00100Borrow (Vehicular Measurement) 310     CUYD20.006,200.0030.009,300.0025.007,750.00
0007204-06-00100Temporary Silt Fencing 200     LNFT3.00600.006.001,200.003.00600.00
0008401-02-00100Aggregate Surface Course (Adjusted Vehicular Measurement) 1,051     CUYD65.0068,315.00110.00115,610.00125.00131,375.00
0009502-01-00100Asphalt Concrete 9,512.4   TON91.00865,628.40100.00951,240.00115.001,093,926.00
0010502-01-00200Asphalt Concrete, Drives, Turnouts and Miscellaneous 296.4   TON180.0053,352.00100.0029,640.00205.0060,762.00
0011509-01-00100Milling Asphalt Pavement 2,714     SQYD5.0013,570.0015.0040,710.004.0010,856.00
0012509-02-00100Contractor Retained Reclaimed Asphalt Pavement -111     CUYD1.00-111.001.00-111.001.00-111.00
0013510-01-00100Pavement Patching (6" Minimum Thickness) 1,201     SQYD90.00108,090.0055.0066,055.0075.0090,075.00
0014510-01-00255Pavement Patching (15 inch Minimum Thickness) 350     SQYD150.0052,500.00145.0050,750.00150.0052,500.00
0015510-02-00100Pavement Widening 12" MINIMUM THICKNESS1,011.1   SQYD110.00111,221.00100.00101,110.00140.00141,554.00
0016701-02-01060Cross Drain Pipe Arch (42" Equiv. RCPA) 128     LNFT260.0033,280.00300.0038,400.00315.0040,320.00
0017701-17-00100Trench Excavation Safety Protection (Depth >5 feet) 126     LNFT2.00252.0050.006,300.005.00630.00
0018704-01-01020Guard Rail (Single Thrie Beam) (6'-3" post spacing) 1,040     LNFT55.0057,200.0050.0052,000.0035.0036,400.00
0019704-03-00200Blocked Out Guard Rail - 31", (6'-3" Post Spacing) 37.5   LNFT30.001,125.0032.001,200.0025.00937.50
0020704-07-00200Guard Rail Transitions (Double Thrie Beam) 100     LNFT100.0010,000.00115.0011,500.00110.0011,000.00
0021704-10-00120Guard Rail End Treatment, MASH, (TL-3 Flared) 4     EACH3,300.0013,200.003,100.0012,400.003,200.0012,800.00
0022711-03-00500Riprap (130 lb) 69.8   TON85.005,933.00375.0026,175.00125.008,725.00
0023711-04-00100Geotextile Fabric 33     SQYD5.00165.0013.00429.005.00165.00
0024713-01-00100Temporary Signs and Barricades 1     LUMP33,500.0033,500.0035,000.0035,000.0020,000.0020,000.00
0025713-03-01000Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) 5.991 MILE200.001,198.20210.001,258.11175.001,048.43
0026713-03-02000Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) 4.331 MILE400.001,732.4010.5045.48500.002,165.50
0027713-04-01000Temporary Pavement Markings (Solid Line) (4" Width) 16.775 MILE100.001,677.5010.50176.141,000.0016,775.00
0028716-01-00100Mulch (Vegetative) 0.1   TON6,000.00600.005,300.00530.005,500.00550.00
0029717-01-00100Seeding 4     LB60.00240.0027.00108.00250.001,000.00
0030718-01-00100Fertilizer 60     LB6.00360.002.00120.001.0060.00
0031726-01-00100Bedding Material 79.4   CUYD100.007,940.00160.0012,704.00150.0011,910.00
0032727-01-00100Mobilization 1     LUMP95,000.0095,000.00190,000.00190,000.00135,000.00135,000.00
0033729-16-00200Object Marker Assembly (Type 2) 13     EACH100.001,300.0050.00650.0095.001,235.00
0034729-16-00300Object Marker Assembly (Type 3) 4     EACH110.00440.0085.00340.00105.00420.00
0035731-02-00100Reflectorized Raised Pavement Markers 1,011     EACH6.006,066.009.009,099.007.007,077.00
0036732-02-02000Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) 16.775 MILE3,600.0060,390.004,200.0070,455.004,500.0075,487.50
0037732-03-02000Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) 4.331 MILE1,000.004,331.002,100.009,095.101,000.004,331.00
0038732-03-02010Plastic Pavement Striping (Dotted Line)(4" W)(2' L)(Thermo 90 mil) 0.095 MILE5,000.00475.003,000.00285.006,600.00627.00
0039732-05-00100Removal of Existing Markings 0.106 MILE8,000.00848.0012,000.001,272.0010,000.001,060.00
0040735-01-00100Mailboxes 12     EACH5.0060.0050.00600.0010.00120.00
0041735-02-00100Mailbox Supports (Single) 12     EACH150.001,800.00225.002,700.00200.002,400.00
0042740-01-00100Construction Layout 1     LUMP5,000.005,000.0035,000.0035,000.0010,000.0010,000.00
           
  CONTRACTOR TOTAL   1,663,664.90 1,994,718.33 2,036,912.93