Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - D & J CONSTRUCTION CO., LLC | - 2 - Diamond B Construction Co., L.L.C. | - 3 - GILCHRIST CONSTRUCTION COMPANY, LLC |
Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount |
0001 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 1,200.00 | 1,200.00 | 1,100.00 | 1,100.00 | 5,500.00 | 5,500.00 |
0002 | 202-02-14500 | Removal of Guard Rail | 244 | LNFT | 22.00 | 5,368.00 | 15.00 | 3,660.00 | 12.00 | 2,928.00 |
0003 | 202-02-32100 | Removal of Pipe (Cross Drain) 48" RCP | 8 | LNFT | 12.00 | 96.00 | 745.00 | 5,960.00 | 60.00 | 480.00 |
0004 | 203-07-00100 | Borrow (Vehicular Measurement) | 20 | CUYD | 25.00 | 500.00 | 11.00 | 220.00 | 60.00 | 1,200.00 |
0005 | 502-01-00100 | Asphalt Concrete | 15,621 | TON | 90.00 | 1,405,890.00 | 112.00 | 1,749,552.00 | 100.00 | 1,562,100.00 |
0006 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 430.1 | TON | 90.00 | 38,709.00 | 155.00 | 66,665.50 | 100.00 | 43,010.00 |
0007 | 507-01-00100 | Asphalt Material (CRS-2P Emulsion) | 75,190 | GAL | 2.70 | 203,013.00 | 3.25 | 244,367.50 | 3.25 | 244,367.50 |
0008 | 507-02-00200 | Aggregate (S2) | 73,692 | SQYD | 1.40 | 103,168.80 | 1.55 | 114,222.60 | 1.25 | 92,115.00 |
0009 | 507-02-00300 | Aggregate (S3) | 145,091 | SQYD | 1.15 | 166,854.65 | 1.35 | 195,872.85 | 0.90 | 130,581.90 |
0010 | 509-01-00100 | Milling Asphalt Pavement | 145,966 | SQYD | 1.40 | 204,352.40 | 2.00 | 291,932.00 | 2.00 | 291,932.00 |
0011 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -4,055 | CUYD | 1.00 | -4,055.00 | 1.00 | -4,055.00 | 1.00 | -4,055.00 |
0012 | 510-01-00104 | Pavement Patching (10" Minimum Thickness) | 1,100 | SQYD | 125.00 | 137,500.00 | 97.00 | 106,700.00 | 80.00 | 88,000.00 |
0013 | 510-01-00400 | Pavement Patching (24" Minimum Thickness) | 1,200 | SQYD | 200.00 | 240,000.00 | 173.00 | 207,600.00 | 160.00 | 192,000.00 |
0014 | 701-10-01140 | Reinforced Concrete Pipe (Extension) (48") | 16 | LNFT | 350.00 | 5,600.00 | 875.00 | 14,000.00 | 600.00 | 9,600.00 |
0015 | 701-15-00100 | Concrete Collar | 2 | EACH | 1,000.00 | 2,000.00 | 2,100.00 | 4,200.00 | 4,000.00 | 8,000.00 |
0016 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 100 | LNFT | 30.00 | 3,000.00 | 26.00 | 2,600.00 | 32.00 | 3,200.00 |
0017 | 704-06-00200 | Guard Rail Bridge Attachments (Single Thrie Beam) | 25 | LNFT | 60.00 | 1,500.00 | 60.00 | 1,500.00 | 73.00 | 1,825.00 |
0018 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 50 | LNFT | 100.00 | 5,000.00 | 95.00 | 4,750.00 | 120.00 | 6,000.00 |
0019 | 704-10-00310 | Guard Rail End Treatment, NCHRP 350 - 31" (TL-3 Flared) | 2 | EACH | 3,400.00 | 6,800.00 | 3,400.00 | 6,800.00 | 3,200.00 | 6,400.00 |
0020 | 707-04-00100 | Asphalt Curb | 27 | LNFT | 65.00 | 1,755.00 | 175.00 | 4,725.00 | 150.00 | 4,050.00 |
0021 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 60,000.00 | 60,000.00 | 52,000.00 | 52,000.00 | 100,000.00 | 100,000.00 |
0022 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 968 | LNFT | 0.20 | 193.60 | 0.30 | 290.40 | 1.00 | 968.00 |
0023 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 920 | LNFT | 0.30 | 276.00 | 0.55 | 506.00 | 2.65 | 2,438.00 |
0024 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 27.494 | MILE | 200.00 | 5,498.80 | 154.00 | 4,234.08 | 210.00 | 5,773.74 |
0025 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 40.786 | MILE | 100.00 | 4,078.60 | 450.00 | 18,353.70 | 600.00 | 24,471.60 |
0026 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 66.252 | MILE | 100.00 | 6,625.20 | 900.00 | 59,626.80 | 1,000.00 | 66,252.00 |
0027 | 713-05-00220 | Temporary Pavement Legends & Symbols (Arrow - Left Turn) | 26 | EACH | 15.00 | 390.00 | 15.00 | 390.00 | 100.00 | 2,600.00 |
0028 | 713-05-00300 | Temporary Pavement Legends & Symbols (ONLY) | 1 | EACH | 25.00 | 25.00 | 25.00 | 25.00 | 100.00 | 100.00 |
0029 | 713-06-00200 | Temporary Reflectorized Raised Pavement Markers (Tabs) | 4,938 | EACH | 2.00 | 9,876.00 | 2.00 | 9,876.00 | 2.50 | 12,345.00 |
0030 | 716-01-00100 | Mulch (Vegetative) | 0.01 | TON | 6,000.00 | 60.00 | 10,500.00 | 105.00 | 130,000.00 | 1,300.00 |
0031 | 717-01-00100 | Seeding | 2 | LB | 60.00 | 120.00 | 55.00 | 110.00 | 600.00 | 1,200.00 |
0032 | 718-01-00100 | Fertilizer | 10 | LB | 6.00 | 60.00 | 5.00 | 50.00 | 60.00 | 600.00 |
0033 | 726-01-00100 | Bedding Material | 6.7 | CUYD | 100.00 | 670.00 | 110.00 | 737.00 | 150.00 | 1,005.00 |
0034 | 727-01-00100 | Mobilization | 1 | LUMP | 65,000.00 | 65,000.00 | 155,000.00 | 155,000.00 | 350,000.00 | 350,000.00 |
0035 | 729-16-00200 | Object Marker Assembly (Type 2) | 1 | EACH | 100.00 | 100.00 | 95.00 | 95.00 | 50.00 | 50.00 |
0036 | 729-16-00300 | Object Marker Assembly (Type 3) | 2 | EACH | 110.00 | 220.00 | 105.00 | 210.00 | 80.00 | 160.00 |
0037 | 731-01-00100 | Nonreflectorized Raised Pavement Markers | 570 | EACH | 7.00 | 3,990.00 | 7.00 | 3,990.00 | 14.00 | 7,980.00 |
0038 | 731-02-00100 | Reflectorized Raised Pavement Markers | 3,590 | EACH | 5.00 | 17,950.00 | 7.00 | 25,130.00 | 8.00 | 28,720.00 |
0039 | 732-01-02040 | Plastic Pavement Striping (8" Width) (Thermoplastic 125 mil) | 484 | LNFT | 3.00 | 1,452.00 | 14.00 | 6,776.00 | 6.00 | 2,904.00 |
0040 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 460 | LNFT | 12.00 | 5,520.00 | 15.00 | 6,900.00 | 15.00 | 6,900.00 |
0041 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 22.084 | MILE | 3,600.00 | 79,502.40 | 3,900.00 | 86,127.60 | 4,600.00 | 101,586.40 |
0042 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 11.81 | MILE | 800.00 | 9,448.00 | 1,000.00 | 11,810.00 | 2,200.00 | 25,982.00 |
0043 | 732-03-02002 | Plastic Pav't Striping (Broken) (4" Width) (Thermo 90 mil)(Black and White Cont) | 1.785 | MILE | 2,000.00 | 3,570.00 | 2,200.00 | 3,927.00 | 4,400.00 | 7,854.00 |
0044 | 732-03-02010 | Plastic Pavement Striping (Dotted Line)(4" W)(2' L)(Thermo 90 mil) | 0.054 | MILE | 5,000.00 | 270.00 | 4,750.00 | 256.50 | 8,000.00 | 432.00 |
0045 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 26 | EACH | 300.00 | 7,800.00 | 275.00 | 7,150.00 | 500.00 | 13,000.00 |
0046 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 1 | EACH | 500.00 | 500.00 | 550.00 | 550.00 | 500.00 | 500.00 |
0047 | 732-05-00100 | Removal of Existing Markings FOR REMOVAL OF PAVEMENT MARKINGS ON PCC PVMT. & ON BRIDGE AND APPROACHES | 1.719 | MILE | 5,000.00 | 8,595.00 | 6,000.00 | 10,314.00 | 25,000.00 | 42,975.00 |
0048 | 735-01-00100 | Mailboxes | 31 | EACH | 5.00 | 155.00 | 30.00 | 930.00 | 25.00 | 775.00 |
0049 | 735-02-00100 | Mailbox Supports (Single) | 17 | EACH | 145.00 | 2,465.00 | 200.00 | 3,400.00 | 160.00 | 2,720.00 |
0050 | 735-03-00100 | Mailbox Supports (Double) | 7 | EACH | 200.00 | 1,400.00 | 225.00 | 1,575.00 | 280.00 | 1,960.00 |
0051 | 740-01-00100 | Construction Layout | 1 | LUMP | 6,000.00 | 6,000.00 | 11,000.00 | 11,000.00 | 42,000.00 | 42,000.00 |
| | | | | | | | | | |
| | CONTRACTOR TOTAL | | | | 2,830,062.45 | | 3,503,817.53 | | 3,544,786.14 |