Bid Tabulations for the Letting of 5/12/2021 LA DOTD Headquarters

Proposal:H.012946.6
Parish:Vermilion
Routes:LA 697
Description:LA 697: LA 343 - US 167
Type Construction:DRAINAGE STRUCTURES, MILLING ASPHALT CONCRETE, PAVEMENT PATCHING, SUBGRADE TREATMENT, IN-PLACE CEMENT STABILIZED BASE COURSE, ASPHALT SURFACE TREATMENT, ASPHALT CONCRETE OVERLAY, AND RELATED WORK.
Estimated Construction Cost:$3,195,392.55
133663Glenn Lege Construction LLC$3,207,851.75
234356Prairie Contractors LLC$3,582,481.27


Line
Number
Item NumberItem DescriptionQuantityUnit of
Measure
- 1 -
Glenn Lege Construction LLC
- 2 -
Prairie Contractors LLC
Unit PriceTotal
Amount
Unit PriceTotal
Amount
0001202-01-00100Removal of Structures and Obstructions 1     LUMP500.00500.003,000.003,000.00
0002202-02-06100Removal of Concrete Walks and Drives 245     SQYD16.153,956.7517.004,165.00
0003202-02-14500Removal of Guard Rail 1,120     LNFT14.2015,904.0015.0016,800.00
0004202-02-32100Removal of Pipe (Cross Drain) (30" Equiv. x CMPA)48     LNFT24.501,176.0040.001,920.00
0005202-02-32120Removal of Pipe (Side Drain) (18" - 48" PP/CMP)297     LNFT20.506,088.5040.0011,880.00
0006203-07-00100Borrow (Vehicular Measurement) 500     CUYD26.0013,000.0030.0015,000.00
0007204-05-00100Temporary Sediment Check Dams (Hay) 68     EACH150.0010,200.00130.008,840.00
0008303-01-00200In-Place Cement Stabilized Base Course (8-1/2" Thick) 51,353     SQYD6.80349,200.408.50436,500.50
0009305-01-03020Subgrade Layer (10" Thick) (Treated) 51,353     SQYD10.40534,071.2011.75603,397.75
0010401-02-00100Aggregate Surface Course (Adjusted Vehicular Measurement) 1,153     CUYD35.0040,355.0030.0034,590.00
0011402-01-00100Mainline Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) 50     CUYD33.001,650.00100.005,000.00
0012402-03-00100Non-Mainline Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) 100     CUYD31.253,125.0040.004,000.00
0013502-01-00100Asphalt Concrete 13,917.8   TON79.201,102,289.7685.001,183,013.00
0014502-01-00200Asphalt Concrete, Drives, Turnouts and Miscellaneous 2,294.4   TON108.25248,368.8085.00195,024.00
0015507-01-00100Asphalt Material (CRS-2P Emulsion) 33,405     GAL3.25108,566.253.00100,215.00
0016507-02-00200Aggregate (S2) 49,125     SQYD1.4571,231.251.3566,318.75
0017507-02-00300Aggregate (S3) 49,125     SQYD1.2058,950.001.1556,493.75
0018509-01-00100Milling Asphalt Pavement 42,677     SQYD1.5064,015.502.0587,487.85
0019509-02-00100Contractor Retained Reclaimed Asphalt Pavement -1,777     CUYD0.10-177.700.01-17.77
0020510-01-00250Pavement Patching (14 inch Minimum Thickness) 359     SQYD101.5036,438.50140.0050,260.00
0021701-01-01041Cross Drain Pipe (36" RCP) 52     LNFT230.0011,960.00600.0031,200.00
0022701-02-01020Cross Drain Pipe Arch (30" Equiv. RCPA) 48     LNFT220.0010,560.00575.0027,600.00
0023701-05-02062Side Drain Pipe (Erosion) (24" RPVCP/CMP) 42     LNFT81.753,433.50300.0012,600.00
0024701-05-02141Side Drain Pipe (Erosion) (48" RPVCP/CPEPDW/CMP) 220     LNFT168.0036,960.00235.0051,700.00
0025701-17-00100Trench Excavation Safety Protection (Depth >5 feet) 362     LNFT9.503,439.0035.0012,670.00
0026704-01-01000Guard Rail (Single Thrie Beam) (3'-1 1/2" post spacing) 300     LNFT55.5016,650.0060.0018,000.00
0027704-01-01020Guard Rail (Single Thrie Beam) (6'-3" post spacing) 412.5   LNFT195.5080,643.75140.0057,750.00
0028704-03-00200Blocked Out Guard Rail - 31", (6'-3" Post Spacing) 281.3   LNFT23.506,610.5530.008,439.00
0029704-10-00205Guard Rail End Treatment, MASH, (TL-3 Tangent) 12     EACH3,497.0041,964.004,000.0048,000.00
0030706-02-00200Concrete Drive (6" Thick) 245.4   SQYD65.0015,951.00255.0062,577.00
0031713-01-00100Temporary Signs and Barricades 1     LUMP22,427.7522,427.7525,000.0025,000.00
0032713-02-00500Temporary Pavement Markings (24" Width) 24     LNFT0.5513.200.010.24
0033713-03-01000Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) 10.609 MILE650.006,895.85550.005,834.95
0034713-03-02000Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) 10.572 MILE499.505,280.711.0010.57
0035713-04-01000Temporary Pavement Markings (Solid Line) (4" Width) 21.978 MILE832.5018,296.691.0021.98
0036713-06-00200Temporary Reflectorized Raised Pavement Markers (Tabs) 1,867     EACH2.805,227.602.654,947.55
0037722-02-00100Project Site Laboratory (Equipped) 1     EACH6,300.006,300.006,000.006,000.00
0038724-02-00100Rumble Strips (Shoulder/Edge) 7.072 MILE770.505,448.981,100.007,779.20
0039726-01-00100Bedding Material 11.1   CUYD75.00832.50200.002,220.00
0040727-01-00100Mobilization 1     LUMP158,585.00158,585.00250,000.00250,000.00
0041729-16-00200Object Marker Assembly (Type 2) 34     EACH100.003,400.0065.002,210.00
0042729-16-00300Object Marker Assembly (Type 3) 18     EACH105.501,899.00110.001,980.00
0043731-02-00100Reflectorized Raised Pavement Markers 487     EACH7.253,530.756.753,287.25
0044732-01-02080Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) 24     LNFT27.75666.0030.00720.00
0045732-02-02000Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) 7.326 MILE4,220.0030,915.724,000.0029,304.00
0046732-03-02000Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) 3.524 MILE834.002,939.02800.002,819.20
0047735-01-00100Mailboxes 114     EACH2.25256.5010.001,140.00
0048735-02-00100Mailbox Supports (Single) 114     EACH166.5018,981.00150.0017,100.00
0049739-01-00100Hydro-Seeding 0.082 ACRE31,335.002,569.4735,000.002,870.00
0050740-01-00100Construction Layout 1     LUMP9,900.009,900.001,000.001,000.00
0051NS-500-00240Sawing and Sealing Transverse Joints in Asphalt Concrete Overlay 610     LNFT6.503,965.004.002,440.00
0052NS-500-00260Sawcuts in Asphalt Concrete Lifts 610     LNFT4.002,440.002.251,372.50
         
  CONTRACTOR TOTAL   3,207,851.75 3,582,481.27