Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - F.G. SULLIVAN, JR. CONTRACTOR LLC |
- 2 - BARRIERE CONSTRUCTION CO., LLC. |
- 3 - GILMORE & SON CONSTRUCTION CORP. |
|
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
201-01 |
clearing & grubbing
|
lump |
LUMP |
15,000.00 |
15,000.00 |
11,000.00 |
11,000.00 |
100,000.00 |
100,000.00 |
|
|
202-01 |
removal of structures & obstructions
|
lump |
LUMP |
1,000.00 |
1,000.00 |
20,000.00 |
20,000.00 |
100,000.00 |
100,000.00 |
|
|
202-02-D |
removal of concrete walks & drives
|
2,038   |
SQYD |
12.00 |
24,456.00 |
12.00 |
24,456.00 |
10.00 |
20,380.00 |
|
|
202-02-G |
removal of surfacing & stabilized base
|
5,293.6 |
SQYD |
12.00 |
63,523.20 |
12.00 |
63,523.20 |
15.00 |
79,404.00 |
|
|
202-02-I |
removal of traffic signal equipment
|
lump |
LUMP |
2,500.00 |
2,500.00 |
10,000.00 |
10,000.00 |
5,000.00 |
5,000.00 |
|
|
203-01 |
general excavation
|
3,127   |
CUYD |
12.00 |
37,524.00 |
15.00 |
46,905.00 |
20.00 |
62,540.00 |
|
|
203-02 |
drainage excavation
|
92   |
CUYD |
12.00 |
1,104.00 |
15.00 |
1,380.00 |
200.00 |
18,400.00 |
|
|
203-03 |
embankment
|
3,402   |
CUYD |
20.00 |
68,040.00 |
28.00 |
95,256.00 |
20.00 |
68,040.00 |
|
|
204-02 |
temporary hay or straw bales
|
654   |
EACH |
10.00 |
6,540.00 |
11.00 |
7,194.00 |
15.00 |
9,810.00 |
|
|
204-04 |
temporary sediment basins
|
2   |
EACH |
2,500.00 |
5,000.00 |
500.00 |
1,000.00 |
1,500.00 |
3,000.00 |
|
|
204-05-A |
temporary sediment check dams (hay)
|
6   |
EACH |
125.00 |
750.00 |
140.00 |
840.00 |
400.00 |
2,400.00 |
|
|
204-06 |
temporary silt fencing
|
4,881   |
LNFT |
1.50 |
7,321.50 |
1.50 |
7,321.50 |
3.00 |
14,643.00 |
|
|
302-02-E |
class ii base course (10" thick)
|
8,474.4 |
SQYD |
63.00 |
533,887.20 |
32.00 |
271,180.80 |
45.00 |
381,348.00 |
|
|
304-01 |
lime
|
120.14 |
TON |
100.00 |
12,014.00 |
210.00 |
25,229.40 |
250.00 |
30,035.00 |
|
|
304-04-D |
lime treatment (type d) (12" thick)
|
8,475   |
SQYD |
4.00 |
33,900.00 |
4.00 |
33,900.00 |
7.00 |
59,325.00 |
|
|
402-01 |
traffic maintenance aggregate (vehicular measurement)
|
400.0 |
CUYD |
60.00 |
24,000.00 |
125.00 |
50,000.00 |
65.00 |
26,000.00 |
|
|
502-01 |
superpave asphaltic concrete
|
4,028.0 |
TON |
95.00 |
382,660.00 |
125.00 |
503,500.00 |
130.00 |
523,640.00 |
|
|
502-01-A |
superpave asphaltic concrete drives, turnouts and
miscellaneous |
844.3 |
TON |
95.00 |
80,208.50 |
160.00 |
135,088.00 |
160.00 |
135,088.00 |
|
|
509-01 |
cold planing asphaltic pavement
|
1,551   |
SQYD |
15.00 |
23,265.00 |
10.00 |
15,510.00 |
15.00 |
23,265.00 |
|
|
509-02 |
contractor retained reclaimed asphaltic pavement
|
- 172   |
CUYD |
0.01 |
- 1.72 |
5.00 |
- 860.00 |
1.00 |
- 172.00 |
|
|
510-01-A |
pavement patching (6" minimum thickness)
|
221   |
SQYD |
100.00 |
22,100.00 |
80.00 |
17,680.00 |
85.00 |
18,785.00 |
|
|
510-01-B |
pavement patching (12" minimum thickness)
|
66   |
SQYD |
250.00 |
16,500.00 |
160.00 |
10,560.00 |
225.00 |
14,850.00 |
|
|
701-03-F |
storm drain pipe (15" rcp/pcp)
|
1,608   |
LNFT |
71.00 |
114,168.00 |
80.00 |
128,640.00 |
100.00 |
160,800.00 |
|
|
701-03-G |
storm drain pipe (18" rcp/pcp)
|
1,330   |
LNFT |
84.00 |
111,720.00 |
100.00 |
133,000.00 |
125.00 |
166,250.00 |
|
|
701-03-I |
storm drain pipe (24" rcp/pcp)
|
994   |
LNFT |
100.00 |
99,400.00 |
110.00 |
109,340.00 |
110.00 |
109,340.00 |
|
|
701-03-S |
storm drain pipe (72" rcp/pcp)
|
22   |
LNFT |
615.00 |
13,530.00 |
750.00 |
16,500.00 |
500.00 |
11,000.00 |
|
|
701-04-A |
storm drain pipe arch (15" equiv. rcpa)
|
64   |
LNFT |
112.00 |
7,168.00 |
120.00 |
7,680.00 |
200.00 |
12,800.00 |
|
|
701-04-B |
storm drain pipe arch (18" equiv. rcpa)
|
178   |
LNFT |
100.00 |
17,800.00 |
130.00 |
23,140.00 |
150.00 |
26,700.00 |
|
|
701-04-D |
storm drain pipe arch (24" equiv. rcpa)
|
200   |
LNFT |
114.00 |
22,800.00 |
140.00 |
28,000.00 |
150.00 |
30,000.00 |
|
|
701-04-E |
storm drain pipe arch (30" equiv. rcpa)
|
1,000   |
LNFT |
131.00 |
131,000.00 |
160.00 |
160,000.00 |
200.00 |
200,000.00 |
|
|
701-04-F |
storm drain pipe arch (36" equiv. rcpa)
|
1,200   |
LNFT |
174.00 |
208,800.00 |
200.00 |
240,000.00 |
300.00 |
360,000.00 |
|
|
701-04-G |
storm drain pipe arch (42" equiv. rcpa)
|
50   |
LNFT |
195.00 |
9,750.00 |
220.00 |
11,000.00 |
500.00 |
25,000.00 |
|
|
701-05-G |
storm drain pipe (18" rcp/rpvcp)
|
40   |
LNFT |
84.00 |
3,360.00 |
90.00 |
3,600.00 |
100.00 |
4,000.00 |
|
|
701-07-C |
yard drain pipe (8"pvc)
|
216   |
LNFT |
25.00 |
5,400.00 |
30.00 |
6,480.00 |
40.00 |
8,640.00 |
|
|
701-07-D |
yard drain pipe (10"pvc)
|
4   |
LNFT |
41.00 |
164.00 |
45.00 |
180.00 |
250.00 |
1,000.00 |
|
|
702-02-A |
manholes (mh-06)
|
6   |
EACH |
3,150.00 |
18,900.00 |
3,500.00 |
21,000.00 |
4,000.00 |
24,000.00 |
|
|
702-03-A |
catch basins (cb-01)
|
19   |
EACH |
2,700.00 |
51,300.00 |
3,000.00 |
57,000.00 |
2,000.00 |
38,000.00 |
|
|
702-03-B |
catch basins (cb-02)
|
8   |
EACH |
6,000.00 |
48,000.00 |
6,500.00 |
52,000.00 |
2,500.00 |
20,000.00 |
|
|
702-03-C |
catch basins (cb-06)
|
36   |
EACH |
3,900.00 |
140,400.00 |
4,500.00 |
162,000.00 |
3,500.00 |
126,000.00 |
|
|
702-03-D |
catch basins (cb-07)
|
4   |
EACH |
4,600.00 |
18,400.00 |
5,000.00 |
20,000.00 |
3,500.00 |
14,000.00 |
|
|
702-03-F |
catch basins (cb-08)
|
4   |
EACH |
7,900.00 |
31,600.00 |
9,000.00 |
36,000.00 |
5,000.00 |
20,000.00 |
|
|
702-03-H |
catch basins (cb-05)
|
20   |
EACH |
1,000.00 |
20,000.00 |
1,000.00 |
20,000.00 |
1,500.00 |
30,000.00 |
|
|
702-03-J |
catch basins (cb-04)
|
2   |
EACH |
2,200.00 |
4,400.00 |
2,500.00 |
5,000.00 |
2,500.00 |
5,000.00 |
|
|
702-03-K |
catch basins (cb-opntop)
|
5   |
EACH |
3,400.00 |
17,000.00 |
3,500.00 |
17,500.00 |
3,000.00 |
15,000.00 |
|
|
702-04-A |
adjusting manholes
|
1   |
EACH |
2,150.00 |
2,150.00 |
2,500.00 |
2,500.00 |
2,000.00 |
2,000.00 |
|
|
706-01-A |
concrete walk (4" thick)
|
1,000.8 |
SQYD |
65.00 |
65,052.00 |
35.00 |
35,028.00 |
60.00 |
60,048.00 |
|
|
706-02-C |
concrete drive (6" thick)
|
1,403.1 |
SQYD |
75.00 |
105,232.50 |
50.00 |
70,155.00 |
73.00 |
102,426.30 |
|
|
706-03-C |
incidental concrete paving (6" thick)
|
49.4 |
SQYD |
85.00 |
4,199.00 |
50.00 |
2,470.00 |
200.00 |
9,880.00 |
|
|
707-01 |
concrete curb
|
371.0 |
LNFT |
25.00 |
9,275.00 |
15.00 |
5,565.00 |
45.00 |
16,695.00 |
|
|
707-03 |
combination concrete curb & gutter
|
4,746.0 |
LNFT |
40.00 |
189,840.00 |
20.00 |
94,920.00 |
50.00 |
237,300.00 |
|
|
708-01 |
right-of-way monument
|
55   |
EACH |
235.00 |
12,925.00 |
150.00 |
8,250.00 |
300.00 |
16,500.00 |
|
|
711-01-C |
riprap (30 lb, 18" thick)
|
74   |
SQYD |
69.00 |
5,106.00 |
75.00 |
5,550.00 |
450.00 |
33,300.00 |
|
|
713-01 |
temporary signs & barricades
|
lump |
LUMP |
125,000.00 |
125,000.00 |
250,000.00 |
250,000.00 |
150,000.00 |
150,000.00 |
|
|
713-02-A |
temporary pavement markings (4" width)
|
2,466   |
LNFT |
0.65 |
1,602.90 |
0.60 |
1,479.60 |
1.00 |
2,466.00 |
|
|
713-03-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
0.936 |
MILE |
1,000.00 |
936.00 |
100.00 |
93.60 |
1,000.00 |
936.00 |
|
|
713-05-D |
temporary pavement legends & symbols (rr crossing)
|
1   |
EACH |
75.00 |
75.00 |
50.00 |
50.00 |
100.00 |
100.00 |
|
|
722-02 |
project site laboratory (equipped)
|
1   |
EACH |
10,000.00 |
10,000.00 |
30,000.00 |
30,000.00 |
100,000.00 |
100,000.00 |
|
|
725-01 |
temporary detour roads
|
1,207.3 |
SQYD |
65.00 |
78,474.50 |
50.00 |
60,365.00 |
75.00 |
90,547.50 |
|
|
726-01 |
bedding material
|
766.3 |
CUYD |
82.00 |
62,836.60 |
80.00 |
61,304.00 |
75.00 |
57,472.50 |
|
|
727-01 |
mobilization
|
lump |
LUMP |
140,000.00 |
140,000.00 |
400,000.00 |
400,000.00 |
250,000.00 |
250,000.00 |
|
|
729-01 |
sign (type a)
|
204.5 |
SQFT |
20.00 |
4,090.00 |
20.00 |
4,090.00 |
50.00 |
10,225.00 |
|
|
729-19-A |
dead end road installations(type a)
|
1   |
EACH |
1,200.00 |
1,200.00 |
1,500.00 |
1,500.00 |
2,500.00 |
2,500.00 |
|
|
729-21 |
u-channel post
|
3   |
EACH |
60.00 |
180.00 |
110.00 |
330.00 |
200.00 |
600.00 |
|
|
730-08 |
electrical service point (existing pole)
|
3   |
EACH |
1,200.00 |
3,600.00 |
1,500.00 |
4,500.00 |
1,500.00 |
4,500.00 |
|
|
731-02 |
reflectorized raised pavement markers
|
1,365   |
EACH |
6.00 |
8,190.00 |
6.00 |
8,190.00 |
6.00 |
8,190.00 |
|
|
732-01-A |
plastic pavement striping (4" width)
|
10,894.0 |
LNFT |
0.50 |
5,447.00 |
0.50 |
5,447.00 |
1.00 |
10,894.00 |
|
|
732-01-C |
plastic pavement striping (8" width)
|
844.0 |
LNFT |
1.00 |
844.00 |
1.00 |
844.00 |
1.00 |
844.00 |
|
|
732-01-D |
plastic pavement striping (12" width)
|
295.0 |
LNFT |
1.50 |
442.50 |
2.00 |
590.00 |
2.00 |
590.00 |
|
|
732-01-E |
plastic pavement striping (24" width)
|
737.0 |
LNFT |
5.00 |
3,685.00 |
5.00 |
3,685.00 |
5.00 |
3,685.00 |
|
|
732-04-A |
plastic pavement legends and symbols (arrow)
|
13   |
EACH |
250.00 |
3,250.00 |
250.00 |
3,250.00 |
300.00 |
3,900.00 |
|
|
732-04-B |
plastic pavement legends and symbols (double arrow)
|
2   |
EACH |
250.00 |
500.00 |
300.00 |
600.00 |
500.00 |
1,000.00 |
|
|
732-04-C |
plastic pavement legends and symbols (only)
|
11   |
EACH |
200.00 |
2,200.00 |
250.00 |
2,750.00 |
250.00 |
2,750.00 |
|
|
732-04-D |
plastic pavement legends and symbols (rr crossing)
|
1   |
EACH |
500.00 |
500.00 |
500.00 |
500.00 |
1,000.00 |
1,000.00 |
|
|
735-01 |
mailboxes
|
25   |
EACH |
5.00 |
125.00 |
5.00 |
125.00 |
100.00 |
2,500.00 |
|
|
735-02 |
mailbox supports (single)
|
25   |
EACH |
135.00 |
3,375.00 |
100.00 |
2,500.00 |
200.00 |
5,000.00 |
|
|
736-01 |
trenching and backfilling
|
1,770   |
LNFT |
4.00 |
7,080.00 |
5.00 |
8,850.00 |
7.00 |
12,390.00 |
|
|
736-03-B |
jacked or bored coduit (3" hdpe)
|
675   |
LNFT |
25.00 |
16,875.00 |
30.00 |
20,250.00 |
35.00 |
23,625.00 |
|
|
736-04-A |
signal support (30'strain pole)
|
4   |
EACH |
8,300.00 |
33,200.00 |
10,000.00 |
40,000.00 |
9,000.00 |
36,000.00 |
|
|
736-04-B |
signal support (15'mast arm pole)
|
1   |
EACH |
8,000.00 |
8,000.00 |
10,000.00 |
10,000.00 |
8,000.00 |
8,000.00 |
|
|
736-04-C |
signal support (25'mast arm pole)
|
1   |
EACH |
8,500.00 |
8,500.00 |
10,000.00 |
10,000.00 |
9,000.00 |
9,000.00 |
|
|
736-04-D |
signal support (30'mast arm pole)
|
1   |
EACH |
9,000.00 |
9,000.00 |
10,000.00 |
10,000.00 |
8,500.00 |
8,500.00 |
|
|
736-04-E |
signal support (35'mast arm pole)
|
2   |
EACH |
10,000.00 |
20,000.00 |
10,000.00 |
20,000.00 |
9,500.00 |
19,000.00 |
|
|
736-04-F |
signal support (45'mast arm pole)
|
2   |
EACH |
11,000.00 |
22,000.00 |
10,000.00 |
20,000.00 |
12,000.00 |
24,000.00 |
|
|
736-05-B |
signal head (3-section, 12" led)(r,y,g)
|
18   |
EACH |
1,000.00 |
18,000.00 |
1,000.00 |
18,000.00 |
900.00 |
16,200.00 |
|
|
736-05-C |
signal head (5-section, 12" led)(r,l.t.y,y,l.t.g,g)
|
5   |
EACH |
1,300.00 |
6,500.00 |
1,500.00 |
7,500.00 |
1,200.00 |
6,000.00 |
|
|
736-05-D |
signal head (5-section, 12" led)(r,r.t.y,y,r.t.g,g)
|
4   |
EACH |
1,300.00 |
5,200.00 |
1,500.00 |
6,000.00 |
1,200.00 |
4,800.00 |
|
|
736-06 |
signal service
|
3   |
EACH |
3,500.00 |
10,500.00 |
1,000.00 |
3,000.00 |
1,200.00 |
3,600.00 |
|
|
736-08 |
signal controller (new base)
|
3   |
EACH |
25,000.00 |
75,000.00 |
25,000.00 |
75,000.00 |
23,500.00 |
70,500.00 |
|
|
736-09 |
loop detector
|
305   |
LNFT |
11.00 |
3,355.00 |
10.00 |
3,050.00 |
12.00 |
3,660.00 |
|
|
736-10-A |
underground junction box (type e)
|
7   |
EACH |
400.00 |
2,800.00 |
350.00 |
2,450.00 |
400.00 |
2,800.00 |
|
|
736-10-B |
underground junction box (type f)
|
12   |
EACH |
400.00 |
4,800.00 |
400.00 |
4,800.00 |
400.00 |
4,800.00 |
|
|
736-10-C |
underground junction box (type h)
|
3   |
EACH |
900.00 |
2,700.00 |
1,000.00 |
3,000.00 |
1,000.00 |
3,000.00 |
|
|
736-11-A |
conduit (2" hdpe)
|
1,338   |
LNFT |
6.00 |
8,028.00 |
6.00 |
8,028.00 |
7.00 |
9,366.00 |
|
|
736-11-B |
conduit (3" hdpe)
|
50   |
LNFT |
7.00 |
350.00 |
6.00 |
300.00 |
10.00 |
500.00 |
|
|
736-12-A |
conductor (2c shielded) loop lead-in
|
2,240   |
LNFT |
2.00 |
4,480.00 |
1.50 |
3,360.00 |
2.00 |
4,480.00 |
|
|
736-12-B |
conductor (2c)railroad preemption
|
260   |
LNFT |
2.00 |
520.00 |
1.50 |
390.00 |
3.00 |
780.00 |
|
|
736-12-C |
conductor (3c)controller power
|
410   |
LNFT |
5.00 |
2,050.00 |
5.00 |
2,050.00 |
6.00 |
2,460.00 |
|
|
736-12-D |
conductor (6c)signal
|
965   |
LNFT |
2.00 |
1,930.00 |
2.00 |
1,930.00 |
2.50 |
2,412.50 |
|
|
736-12-E |
conductor(10c)signal
|
1,780   |
LNFT |
2.50 |
4,450.00 |
2.00 |
3,560.00 |
3.00 |
5,340.00 |
|
|
736-12-F |
conductor (6 pair interconnect)
|
170   |
LNFT |
4.00 |
680.00 |
4.00 |
680.00 |
4.00 |
680.00 |
|
|
739-01 |
hydro-seeding
|
2.20 |
ACRE |
1,400.00 |
3,080.00 |
1,500.00 |
3,300.00 |
2,500.00 |
5,500.00 |
|
|
740-01 |
construction layout
|
lump |
LUMP |
73,600.00 |
73,600.00 |
200,000.00 |
200,000.00 |
75,000.00 |
75,000.00 |
|
|
S-001 |
saw cutting
|
811   |
LNFT |
10.00 |
8,110.00 |
10.00 |
8,110.00 |
25.00 |
20,275.00 |
|
|
S-002 |
video detector device & connection
|
9   |
EACH |
7,000.00 |
63,000.00 |
8,000.00 |
72,000.00 |
7,000.00 |
63,000.00 |
|
|
S-003 |
video detection system
|
3   |
EACH |
4,500.00 |
13,500.00 |
5,000.00 |
15,000.00 |
4,500.00 |
13,500.00 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| CONTRACTOR TOTAL |
|
|
|
3,743,972.68 |
|
4,255,963.10 |
|
4,750,328.80 |
|
|
|