Line Number | Item | Description | Unit | Quantity |
0001 | 201-01-00100 | Clearing and Grubbing | LUMP | 1 |
0002 | 202-01-00100 | Removal of Structures and Obstructions | LUMP | 1 |
0003 | 202-02-02020 | Removal of Asphalt Pavement | SQYD | 179.1 |
0004 | 202-02-03000 | Removal of Base – Soil Cement, Asphalt, or BCS | SQYD | 179.1 |
0005 | 202-02-04501 | Removal of Bridge Removal of Bridge Structure No. 080530530921201 (STA. 103+27.82 : 18' x 98' TTRES) | LUMP | 1 |
0006 | 203-01-00100 | General Excavation | CUYD | 247 |
0007 | 203-02-00100 | Drainage Excavation | CUYD | 427 |
0008 | 203-03-00100 | Embankment | CUYD | 186 |
0009 | 203-04-00300 | Nonplastic Embankment (Stone) | CUYD | 15 |
0010 | 204-02-00100 | Temporary Hay Bales | EACH | 48 |
0011 | 204-06-00100 | Temporary Silt Fencing | LNFT | 1,298 |
0012 | 302-02-12060 | Class II Base Course (12" Thick) (Crushed Stone, Recycled Portland Cement Concrete, Blended Calcium Sulfate) | SQYD | 316 |
0013 | 304-01-00100 | Lime | TON | 4 |
0014 | 304-05-00100 | Lime Treatment (Type E) | SQYD | 316 |
0015 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | CUYD | 194 |
0016 | 402-03-00100 | Non-Mainline Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | CUYD | 65 |
0017 | 502-01-00100 | Asphalt Concrete | TON | 36.9 |
0018 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | TON | 23.9 |
0019 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | LNFT | 193.8 |
0020 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | LNFT | 100 |
0021 | 704-10-00120 | Guard Rail End Treatment, MASH, (TL-3 Flared) | EACH | 4 |
0022 | 711-01-04000 | Riprap (55 lb, 18" Thick) | SQYD | 738 |
0023 | 711-04-00100 | Geotextile Fabric | SQYD | 738 |
0024 | 713-01-00100 | Temporary Signs and Barricades | LUMP | 1 |
0025 | 727-01-00100 | Mobilization | LUMP | 1 |
0026 | 729-01-00102 | Sign (Type A)(Furnish and Install) | SQFT | 18.8 |
0027 | 729-16-00300 | Object Marker Assembly (Type 3) | EACH | 4 |
0028 | 729-22-00100 | Square Tubing Post with 2-1/4" Anchor | EACH | 3 |
0029 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | LNFT | 19 |
0030 | 739-01-00100 | Hydro-Seeding | ACRE | 0.26 |
0031 | 740-01-00100 | Construction Layout | LUMP | 1 |
0032 | 804-01-00300 | Precast Concrete Piles (16") | LNFT | 3,040 |
0033 | 804-17-00100 | Construction Site Survey | LUMP | 1 |
0034 | 804-18-00100 | Vibration Monitoring | DAY | 16 |
0035 | 805-12-00600 | Bridge Superstructure and Substructure (28' Roadway, 75 Degree Crossing) | SQFT | 3,920 |
0036 | 805-18-00100 | Concrete Finish (Class 2 Rubbed Finish) | SQFT | 1,672 |
0037 | 805-18-00200 | Concrete Finish (Class 3 Special Finish) | SQFT | 1,672 |
0038 | 810-01-00100 | Concrete Bridge Railing (Standard) | LNFT | 80 |
0039 | 810-01-00200 | Concrete Bridge Railing (Slotted) | LNFT | 200 |
0040 | 813-01-00100 | Concrete Approach Slabs (Cast-in-Place) | SQFT | 1,240 |
0041 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | INLF | 1,737 |