Proposal H.012527.6 Item Summary

Scheduled for Letting 06/09/2021  
   
LOCAL ROAD SAFETY UPGRADES (W FELICIANA)


NOTE: Items and quantities shown are provided for informational purposes only and are subject to revision.
0001202-02-06140Removal of Curbs (Concrete) LNFT68
0002202-02-14500Removal of Guard Rail LNFT2,625
0003202-02-38240Removal of Signs and Supports EACH403
0004203-05-00100Excavation and Embankment LUMP1
0005204-06-00100Temporary Silt Fencing LNFT5,655
0006701-05-01064Side Drain Pipe (24" RCP/RPVCP/CPEPDW) LNFT60
0007702-08-00100Side Drain Safety End (Type 1) EACH1
0008704-01-01020Guard Rail (Single Thrie Beam) (6'-3" post spacing) LNFT860
0009704-03-00200Blocked Out Guard Rail - 31", (6'-3" Post Spacing) LNFT1,468.9
0010704-07-00200Guard Rail Transitions (Double Thrie Beam) LNFT500
0011704-10-00105Guard Rail End Treatment (Flared, 12' - 6" Length) EACH6
0012704-10-00120Guard Rail End Treatment, MASH, (TL-3 Flared) EACH3
0013704-10-00205Guard Rail End Treatment, MASH, (TL-3 Tangent) EACH37
0014707-01-00100Concrete Curb LNFT154
0015713-01-00100Temporary Signs and Barricades LUMP1
0016717-01-00100Seeding LB60
0017718-01-00100Fertilizer LB2,000
0018720-01-02000Erosion Control System, Flexible (Channel Liner) (Type C) SQYD1,408
0019726-01-00100Bedding Material CUYD5.6
0020727-01-00100Mobilization LUMP1
0021729-01-00100Sign (Type A) SQFT3,863.3
0022729-16-00300Object Marker Assembly (Type 3) EACH210
0023729-19-00300Dead End Road Installations (Type C) EACH3
0024729-22-00200Square Tubing Post with 2-1/4" Omni-Directional Anchor EACH623
0025731-02-00100Reflectorized Raised Pavement Markers EACH12,462
0026732-01-01000Plastic Pavement Striping (4" Width) (Thermoplastic 90 mil) LNFT120
0027732-01-02080Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) LNFT499
0028732-02-02000Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) MILE96.004
0029732-04-25020Plastic Pavement Legends and Symbols (Yield Line) EACH1
0030732-05-00100Removal of Existing Markings MILE47.202
0031740-01-00100Construction Layout LUMP1