Line Number | Item | Description | Unit | Quantity |
0001 | 202-02-00010 | Removal of Brick Mailboxes | EACH | 3 |
0002 | 202-02-00020 | Removal of BRICK DRIVEWAY | SQYD | 9 |
0003 | 202-02-02000 | Removal of Asphalt Drives | SQYD | 73 |
0004 | 202-02-06140 | Removal of Curbs (Concrete) | LNFT | 162 |
0005 | 202-02-12000 | Removal of Fence | LNFT | 200 |
0006 | 202-02-14500 | Removal of Guard Rail | LNFT | 936 |
0007 | 202-02-32120 | Removal of Pipe (Side Drain) 18" TO 36" STEEL AND CORRUGATED METAL PIPES | LNFT | 58 |
0008 | 202-02-38200 | Removal of Signs | EACH | 26 |
0009 | 203-01-00100 | General Excavation | CUYD | 111 |
0010 | 203-07-00100 | Borrow (Vehicular Measurement) | CUYD | 2,700 |
0011 | 203-10-00100 | Cleaning Existing Ditches | LNFT | 695 |
0012 | 204-06-00100 | Temporary Silt Fencing | LNFT | 200 |
0013 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | CUYD | 588.6 |
0014 | 502-01-00100 | Asphalt Concrete | TON | 11,560 |
0015 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | TON | 702.5 |
0016 | 509-01-00100 | Milling Asphalt Pavement | SQYD | 106,636 |
0017 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | CUYD | -4,443 |
0018 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | SQYD | 926 |
0019 | 510-01-00400 | Pavement Patching (24" Minimum Thickness) | SQYD | 213 |
0020 | 701-06-00020 | Side Drain Pipe Arch (18" Equiv. RCPA) | LNFT | 24 |
0021 | 701-06-00040 | Side Drain Pipe Arch (24" Equiv. RCPA) | LNFT | 48 |
0022 | 701-10-01040 | Reinforced Concrete Pipe (Extension) (18") | LNFT | 8 |
0023 | 701-14-00100 | Cleaning Existing Pipes | LNFT | 1,014 |
0024 | 701-15-00100 | Concrete Collar | EACH | 1 |
0025 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | LNFT | 506.3 |
0026 | 704-06-00200 | Guard Rail Bridge Attachments (Single Thrie Beam) | LNFT | 25 |
0027 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | LNFT | 100 |
0028 | 704-10-00205 | Guard Rail End Treatment, MASH, (TL-3 Tangent) | EACH | 1 |
0029 | 704-10-00310 | Guard Rail End Treatment, NCHRP 350 - 31" (TL-3 Flared) | EACH | 3 |
0030 | 707-01-00100 | Concrete Curb | LNFT | 145 |
0031 | 711-02-00400 | Riprap (55 lb) | CUYD | 36 |
0032 | 712-02-00100 | Sacked Concrete Revetment | SQYD | 5 |
0033 | 713-01-00100 | Temporary Signs and Barricades | LUMP | 1 |
0034 | 713-02-00300 | Temporary Pavement Markings (8" Width) | LNFT | 840 |
0035 | 713-02-00500 | Temporary Pavement Markings (24" Width) | LNFT | 200 |
0036 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | MILE | 4.338 |
0037 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | MILE | 4.338 |
0038 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | MILE | 42.204 |
0039 | 713-05-00190 | Temporary Pavement Legends & Symbols (Arrow - Straight) | EACH | 2 |
0040 | 713-05-00230 | Temporary Pavement Legends & Symbols (Arrow - Right Turn) | EACH | 4 |
0041 | 713-05-00300 | Temporary Pavement Legends & Symbols (ONLY) | EACH | 2 |
0042 | 717-01-00100 | Seeding | LB | 115 |
0043 | 718-01-00100 | Fertilizer | LB | 383 |
0044 | 726-01-00100 | Bedding Material | CUYD | 16.6 |
0045 | 727-01-00100 | Mobilization | LUMP | 1 |
0046 | 729-16-00300 | Object Marker Assembly (Type 3) | EACH | 30 |
0047 | 731-02-00100 | Reflectorized Raised Pavement Markers | EACH | 1,941 |
0048 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | LNFT | 145 |
0049 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | LNFT | 100 |
0050 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | MILE | 21.102 |
0051 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | MILE | 2.169 |
0052 | 732-03-02030 | Plastic Pavement Striping (Dotted Line)(8" W)(2' L)(Thermo 90 mil) | MILE | 0.052 |
0053 | 732-04-01020 | Plastic Pavement Legends and Symbols (Arrow - Straight) | EACH | 1 |
0054 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | EACH | 2 |
0055 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | EACH | 1 |
0056 | 735-01-00100 | Mailboxes | EACH | 191 |
0057 | 735-02-00100 | Mailbox Supports (Single) | EACH | 149 |
0058 | 735-03-00100 | Mailbox Supports (Double) | EACH | 21 |
0059 | 740-01-00100 | Construction Layout | LUMP | 1 |
0060 | NS-500-00220 | Sawing and Sealing Longitudinal Joints in Asphalt Concrete Overlay | LNFT | 787 |
0061 | NS-500-00240 | Sawing and Sealing Transverse Joints in Asphalt Concrete Overlay | LNFT | 699 |
0062 | NS-500-00260 | Sawcuts in Asphalt Concrete Lifts | LNFT | 1,486 |
0063 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | INLF | 6,632 |
0064 | NS-702-00001 | Cleaning Existing Catch Basin | EACH | 1 |
0065 | NS-719-00002 | Tree Trimming | LUMP | 1 |