0001 | 202-01-00100 | Removal of Structures and Obstructions | LUMP | 1 |
0002 | 202-02-06100 | Removal of Concrete Walks and Drives | SQYD | 369 |
0003 | 202-02-32100 | Removal of Pipe (Cross Drain) (24" - 84" CMPA) | LNFT | 289 |
0004 | 203-07-00100 | Borrow (Vehicular Measurement) | CUYD | 200 |
0005 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | EACH | 24 |
0006 | 303-01-00200 | In-Place Cement Stabilized Base Course (8-1/2" Thick) | SQYD | 26,540 |
0007 | 303-02-00100 | Removal of Existing Patches | SQYD | 2,100 |
0008 | 309-01-12000 | In-Place Cement Treated Subgrade (12" Thick) | SQYD | 26,203 |
0009 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | CUYD | 602 |
0010 | 402-01-00100 | Mainline Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | CUYD | 25 |
0011 | 402-02-00100 | Mainline Traffic Maintenance Surfacing (Hard) | SQYD | 55 |
0012 | 402-03-00100 | Non-Mainline Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | CUYD | 50 |
0013 | 502-01-00100 | Asphalt Concrete | TON | 7,111.3 |
0014 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | TON | 829.4 |
0015 | 507-01-00100 | Asphalt Material (CRS-2P Emulsion) | GAL | 17,105 |
0016 | 507-02-00200 | Aggregate (S2) | SQYD | 25,155 |
0017 | 507-02-00300 | Aggregate (S3) | SQYD | 25,155 |
0018 | 509-01-00100 | Milling Asphalt Pavement | SQYD | 22,064 |
0019 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | CUYD | -1,793 |
0020 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | SQYD | 111 |
0021 | 701-02-01000 | Cross Drain Pipe Arch (24" Equiv. RCPA) | LNFT | 198 |
0022 | 701-02-01060 | Cross Drain Pipe Arch (42" Equiv. RCPA) | LNFT | 54 |
0023 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | LNFT | 300 |
0024 | 706-02-00200 | Concrete Drive (6" Thick) | SQYD | 369.89 |
0025 | 713-01-00100 | Temporary Signs and Barricades | LUMP | 1 |
0026 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | MILE | 3.596 |
0027 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | MILE | 3.317 |
0028 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | MILE | 8.591 |
0029 | 713-06-00200 | Temporary Reflectorized Raised Pavement Markers (Tabs) | EACH | 950 |
0030 | 722-02-00100 | Project Site Laboratory (Equipped) | EACH | 1 |
0031 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | MILE | 3.596 |
0032 | 726-01-00100 | Bedding Material | CUYD | 35.6 |
0033 | 727-01-00100 | Mobilization | LUMP | 1 |
0034 | 729-16-00200 | Object Marker Assembly (Type 2) | EACH | 12 |
0035 | 729-16-00300 | Object Marker Assembly (Type 3) | EACH | 4 |
0036 | 731-02-00100 | Reflectorized Raised Pavement Markers | EACH | 269 |
0037 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | LNFT | 15 |
0038 | 732-01-05000 | Plastic Pavement Striping (Dotted Line)(4" W)(2' L)(Thermo 125 mil) | LNFT | 280 |
0039 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | MILE | 4.295 |
0040 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | MILE | 1.659 |
0041 | 732-05-00100 | Removal of Existing Markings | MILE | 0.053 |
0042 | 735-01-00100 | Mailboxes | EACH | 34 |
0043 | 735-02-00100 | Mailbox Supports (Single) | EACH | 35 |
0044 | 740-01-00100 | Construction Layout | LUMP | 1 |
0045 | 805-15-00700 | Reinforced Concrete Box Culverts (Precast) (6' x 5') | LNFT | 48 |
0046 | 805-17-00100 | Reinforced Concrete Box Culvert Headwall (6' x 5' RCB) | EACH | 2 |
0047 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | INLF | 1,374 |