Line Number | Item | Description | Unit | Quantity |
0001 | 201-01-00100 | Clearing and Grubbing | LUMP | 1 |
0002 | 202-01-00100 | Removal of Structures and Obstructions | LUMP | 1 |
0003 | 202-02-02020 | Removal of Asphalt Pavement | SQYD | 1,467.2 |
0004 | 202-02-03000 | Removal of Base – Soil Cement, Asphalt, or BCS | SQYD | 1,467.2 |
0005 | 202-02-04501 | Removal of Bridge BRIDGE (STA. 100+00, 21.9' WIDE X 72.2' LONG TIMBER BRIDGE) | LUMP | 1 |
0006 | 202-02-04501 | Removal of Bridge BRIDGE (STA. 200+01, 20.8' WIDE X 52.0' LONG TIMBER BRIDGE) | LUMP | 1 |
0007 | 203-02-00100 | Drainage Excavation | CUYD | 1,603 |
0008 | 203-05-00100 | Excavation and Embankment | LUMP | 1 |
0009 | 204-02-00100 | Temporary Hay Bales | EACH | 16 |
0010 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | EACH | 6 |
0011 | 204-06-00100 | Temporary Silt Fencing | LNFT | 2,890 |
0012 | 302-01-00300 | Class II Base Course (Crushed Stone) | CUYD | 662.9 |
0013 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | CUYD | 2 |
0014 | 502-01-00100 | Asphalt Concrete | TON | 557.3 |
0015 | 701-05-01045 | Side Drain Pipe (18" RCP/RPVCP/CPEPDW) | LNFT | 202 |
0016 | 701-05-02041 | Side Drain Pipe (Erosion) (18" RPVCP/CPEPDW/CMP) | LNFT | 712 |
0017 | 702-03-00100 | Catch Basins (CB-01) | EACH | 2 |
0018 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | LNFT | 100 |
0019 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | LNFT | 275 |
0020 | 704-10-00200 | Guard Rail End Treatment (Tangent) | EACH | 3 |
0021 | 704-10-00205 | Guard Rail End Treatment, MASH, (TL-3 Tangent) | EACH | 4 |
0022 | 704-10-00310 | Guard Rail End Treatment, NCHRP 350 - 31" (TL-3 Flared) | EACH | 4 |
0023 | 705-01-00100 | Barbed Wire Fence | LNFT | 254 |
0024 | 705-06-00100 | Chain Link Fence (4-Foot Height) | LNFT | 14 |
0025 | 711-01-04000 | Riprap (55 lb, 18" Thick) | SQYD | 1,829 |
0026 | 711-04-00100 | Geotextile Fabric | SQYD | 1,829 |
0027 | 713-01-00100 | Temporary Signs and Barricades | LUMP | 1 |
0028 | 716-01-00100 | Mulch (Vegetative) | TON | 1.3 |
0029 | 717-01-00100 | Seeding | LB | 29 |
0030 | 718-01-00100 | Fertilizer | LB | 655 |
0031 | 726-01-00100 | Bedding Material | CUYD | 6.6 |
0032 | 727-01-00100 | Mobilization | LUMP | 1 |
0033 | 729-16-00300 | Object Marker Assembly (Type 3) | EACH | 12 |
0034 | 740-01-00100 | Construction Layout | LUMP | 1 |
0035 | 804-01-00300 | Precast Concrete Piles (16") | LNFT | 3,908 |
0036 | 804-17-00100 | Construction Site Survey | LUMP | 1 |
0037 | 804-18-00100 | Vibration Monitoring | DAY | 60 |
0038 | 805-12-00100 | Bridge Superstructure and Substructure (24' Roadway, 90 Degree Crossing) | SQFT | 4,320 |
0039 | 805-12-00500 | Bridge Superstructure and Substructure (28' Roadway, 90 Degree Crossing) | SQFT | 1,680 |
0040 | 805-18-00100 | Concrete Finish (Class 2 Rubbed Finish) | SQFT | 2,889 |
0041 | 805-18-00200 | Concrete Finish (Class 3 Special Finish) | SQFT | 2,889 |
0042 | 813-01-00100 | Concrete Approach Slabs (Cast-in-Place) (24' CLR. RDWY., 90 DEG. CROSSING) WITHOUT ASPHALT (TAPERED BARRIER-ONE SIDE) | SQFT | 256.96 |
0043 | 813-01-00100 | Concrete Approach Slabs (Cast-in-Place) (24' CLR. RDWY., 90 DEGREE CROSSING) WITHOUT ASPHALT | SQFT | 748.44 |
0044 | 813-01-00100 | Concrete Approach Slabs (Cast-in-Place) (28' CLR. RDWY., 90 DEGREE CROSSING) WITHOUT ASPHALT | SQFT | 578.79 |