Line Number | Item | Description | Unit | Quantity |
0001 | 201-01-00100 | Clearing and Grubbing | LUMP | 1 |
0002 | 202-01-00100 | Removal of Structures and Obstructions | LUMP | 1 |
0003 | 202-02-02020 | Removal of Asphalt Pavement | SQYD | 1,954.6 |
0004 | 202-02-04501 | Removal of Bridge (TIMBER BRIDGE) | LUMP | 1 |
0005 | 203-02-00100 | Drainage Excavation | CUYD | 267 |
0006 | 203-05-00100 | Excavation and Embankment | LUMP | 1 |
0007 | 204-03-00100 | Temporary Slope Drains | LNFT | 30 |
0008 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | EACH | 4 |
0009 | 204-06-00100 | Temporary Silt Fencing | LNFT | 2,205 |
0010 | 302-01-00300 | Class II Base Course (Crushed Stone) | CUYD | 523.6 |
0011 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | CUYD | 90 |
0012 | 402-01-00100 | Mainline Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | CUYD | 150 |
0013 | 502-01-00100 | Asphalt Concrete | TON | 433.8 |
0014 | 701-02-02001 | Cross Drain Pipe Arch (24" Equiv. RCPA or 24" Equiv. CMPA) | LNFT | 66 |
0015 | 701-05-01042 | Side Drain Pipe (18" RCP/RPVCP/CPEPDW/CMP) | LNFT | 64 |
0016 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | LNFT | 50 |
0017 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | LNFT | 100 |
0018 | 704-10-00310 | Guard Rail End Treatment, NCHRP 350 - 31" (TL-3 Flared) | EACH | 4 |
0019 | 711-01-04000 | Riprap (55 lb, 18" Thick) | SQYD | 1,257 |
0020 | 711-04-00100 | Geotextile Fabric | SQYD | 1,257 |
0021 | 713-01-00100 | Temporary Signs and Barricades | LUMP | 1 |
0022 | 716-01-00100 | Mulch (Vegetative) | TON | 1.8 |
0023 | 717-01-00100 | Seeding | LB | 40 |
0024 | 718-01-00100 | Fertilizer | LB | 881 |
0025 | 726-01-00100 | Bedding Material | CUYD | 14.1 |
0026 | 727-01-00100 | Mobilization | LUMP | 1 |
0027 | 729-16-00300 | Object Marker Assembly (Type 3) | EACH | 4 |
0028 | 735-01-00100 | Mailboxes | EACH | 2 |
0029 | 735-03-00100 | Mailbox Supports (Double) | EACH | 1 |
0030 | 740-01-00100 | Construction Layout | LUMP | 1 |
0031 | 804-01-00300 | Precast Concrete Piles (16") | LNFT | 1,960 |
0032 | 804-17-00100 | Construction Site Survey | LUMP | 1 |
0033 | 804-18-00100 | Vibration Monitoring | DAY | 14 |
0034 | 805-12-00600 | Bridge Superstructure and Substructure (28' Roadway, 75 Degree Crossing) (CAST-IN-PLACE, CURVED) | SQFT | 3,360 |
0035 | 805-18-00100 | Concrete Finish (Class 2 Rubbed Finish) | SQFT | 1,442 |
0036 | 805-18-00200 | Concrete Finish (Class 3 Special Finish) | SQFT | 1,442 |
0037 | 813-01-00100 | Concrete Approach Slabs (Cast-in-Place) | SQFT | 1,158.66 |
0038 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | INLF | 262 |