Line Number | Item | Description | Unit | Quantity |
0001 | 201-01-00100 | Clearing and Grubbing | LUMP | 1 |
0002 | 202-01-00100 | Removal of Structures and Obstructions | LUMP | 1 |
0003 | 202-02-02020 | Removal of Asphalt Pavement | SQYD | 1,357.7 |
0004 | 202-02-03000 | Removal of Base – Soil Cement, Asphalt, or BCS | SQYD | 1,357.7 |
0005 | 202-02-04501 | Removal of Bridge (Concrete Slab Span on Timber Piles with Concrete Bent Caps) | LUMP | 1 |
0006 | 202-02-32120 | Removal of Pipe (Side Drain) (12" Diameter Reinforced Concrete Pipe) | LNFT | 58 |
0007 | 203-02-00100 | Drainage Excavation | CUYD | 1,811 |
0008 | 203-05-00100 | Excavation and Embankment | LUMP | 1 |
0009 | 204-03-00100 | Temporary Slope Drains | LNFT | 55 |
0010 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | EACH | 4 |
0011 | 204-06-00100 | Temporary Silt Fencing | LNFT | 990 |
0012 | 302-02-08520 | Class II Base Course (8-1/2" Thick) (Crushed Stone) | SQYD | 1,256.5 |
0013 | 401-01-00100 | Aggregate Surface Course (Net Section) | CUYD | 4.2 |
0014 | 502-01-00100 | Asphalt Concrete | TON | 271.7 |
0015 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | TON | 10.7 |
0016 | 701-05-01061 | Side Drain Pipe (24" RCP/RPVCP/CPEPDW/CMP) | LNFT | 54 |
0017 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | LNFT | 150 |
0018 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | LNFT | 100 |
0019 | 704-10-00205 | Guard Rail End Treatment, MASH, (TL-3 Tangent) | EACH | 4 |
0020 | 711-01-04020 | Riprap (55 lb, 24" Thick) | SQYD | 1,500 |
0021 | 711-04-00100 | Geotextile Fabric | SQYD | 1,500 |
0022 | 713-01-00100 | Temporary Signs and Barricades | LUMP | 1 |
0023 | 716-01-00100 | Mulch (Vegetative) | TON | 1.8 |
0024 | 717-01-00100 | Seeding | LB | 30 |
0025 | 718-01-00100 | Fertilizer | LB | 1,000 |
0026 | 727-01-00100 | Mobilization | LUMP | 1 |
0027 | 729-16-00300 | Object Marker Assembly (Type 3) | EACH | 4 |
0028 | 740-01-00100 | Construction Layout | LUMP | 1 |
0029 | 804-01-00300 | Precast Concrete Piles (16") | LNFT | 1,760 |
0030 | 804-10-00300 | Precast Concrete Indicator Piles (16") | EACH | 1 |
0031 | 804-14-00100 | Dynamic Monitoring Assistance | EACH | 7 |
0032 | 804-17-00100 | Construction Site Survey | LUMP | 1 |
0033 | 804-18-00100 | Vibration Monitoring | DAY | 10 |
0034 | 805-12-00600 | Bridge Superstructure and Substructure (28' Roadway, 75 Degree Crossing) | SQFT | 4,270 |
0035 | 805-18-00100 | Concrete Finish (Class 2 Rubbed Finish) | SQFT | 1,672 |
0036 | 805-18-00200 | Concrete Finish (Class 3 Special Finish) | SQFT | 1,672 |
0037 | 813-01-00100 | Concrete Approach Slabs (Cast-in-Place) | SQFT | 1,160 |