Proposal H.011921.6 Item Summary

Scheduled for Letting 03/11/2020  
   
HWY 41 SPUR BRIDGE OVER GUM CREEK
2/18/2020 - Added to the letting of March 11, 2020


NOTE: Items and quantities shown are provided for informational purposes only and are subject to revision.
0001201-01-00100Clearing and Grubbing LUMP1
0002202-01-00100Removal of Structures and Obstructions LUMP1
0003202-02-02020Removal of Asphalt Pavement SQYD1,357.7
0004202-02-03000Removal of Base – Soil Cement, Asphalt, or BCS SQYD1,357.7
0005202-02-04501Removal of Bridge (Concrete Slab Span on Timber Piles with Concrete Bent Caps)LUMP1
0006202-02-32120Removal of Pipe (Side Drain) (12" Diameter Reinforced Concrete Pipe)LNFT58
0007203-02-00100Drainage Excavation CUYD1,811
0008203-05-00100Excavation and Embankment LUMP1
0009204-03-00100Temporary Slope Drains LNFT55
0010204-05-00100Temporary Sediment Check Dams (Hay) EACH4
0011204-06-00100Temporary Silt Fencing LNFT990
0012302-02-08520Class II Base Course (8-1/2" Thick) (Crushed Stone) SQYD1,256.5
0013401-01-00100Aggregate Surface Course (Net Section) CUYD4.2
0014502-01-00100Asphalt Concrete TON271.7
0015502-01-00200Asphalt Concrete, Drives, Turnouts and Miscellaneous TON10.7
0016701-05-01061Side Drain Pipe (24" RCP/RPVCP/CPEPDW/CMP) LNFT54
0017704-03-00200Blocked Out Guard Rail - 31", (6'-3" Post Spacing) LNFT150
0018704-07-00200Guard Rail Transitions (Double Thrie Beam) LNFT100
0019704-10-00205Guard Rail End Treatment, MASH, (TL-3 Tangent) EACH4
0020711-01-04020Riprap (55 lb, 24" Thick) SQYD1,500
0021711-04-00100Geotextile Fabric SQYD1,500
0022713-01-00100Temporary Signs and Barricades LUMP1
0023716-01-00100Mulch (Vegetative) TON1.8
0024717-01-00100Seeding LB30
0025718-01-00100Fertilizer LB1,000
0026727-01-00100Mobilization LUMP1
0027729-16-00300Object Marker Assembly (Type 3) EACH4
0028740-01-00100Construction Layout LUMP1
0029804-01-00300Precast Concrete Piles (16") LNFT1,760
0030804-10-00300Precast Concrete Indicator Piles (16") EACH1
0031804-14-00100Dynamic Monitoring Assistance EACH7
0032804-17-00100Construction Site Survey LUMP1
0033804-18-00100Vibration Monitoring DAY10
0034805-12-00600Bridge Superstructure and Substructure (28' Roadway, 75 Degree Crossing) SQFT4,270
0035805-18-00100Concrete Finish (Class 2 Rubbed Finish) SQFT1,672
0036805-18-00200Concrete Finish (Class 3 Special Finish) SQFT1,672
0037813-01-00100Concrete Approach Slabs (Cast-in-Place) SQFT1,160