Line Number | Item | Description | Unit | Quantity |
0001 | 202-02-00050 | Removal of INTERMEDIATE BENT BEARINGS, BASE PLATES & ANCHOR BOLTS, BOTH APPROACHES (LEAD COATED) | LUMP | 1 |
0002 | 202-02-00050 | Removal of MACHINERY PLATFORM STRUCTURAL ACCESS LADDER (LEAD COATED) | LUMP | 1 |
0003 | 202-02-00050 | Removal of MACHINERY PLATFORM STRUCTURAL STEEL & HANDRAILING (LEAD COATED) | LUMP | 1 |
0004 | 202-02-00050 | Removal of MARINE NAVIGATION NOTICE SIGNS & MOUNTING HARDWARE | LUMP | 1 |
0005 | 202-02-10000 | Removal of Existing Steel Grid Deck (LEAD COATED) | LUMP | 1 |
0006 | 711-01-03000 | Riprap (30 lb, 14" Thick) | SQYD | 320 |
0007 | 713-01-00100 | Temporary Signs and Barricades | LUMP | 1 |
0008 | 722-01-00100 | Project Site Laboratory | EACH | 1 |
0009 | 727-01-00100 | Mobilization | LUMP | 1 |
0010 | 729-06-00102 | Sign (Overhead Mounted)(Furnish and Install) | SQFT | 80 |
0011 | 731-02-00100 | Reflectorized Raised Pavement Markers | EACH | 11 |
0012 | 732-01-01000 | Plastic Pavement Striping (4" Width) (Thermoplastic 90 mil) | LNFT | 868 |
0013 | 732-05-00100 | Removal of Existing Markings | MILE | 0.041 |
0014 | 737-03-00100 | Painted Traffic Striping (Solid Line) (4" Width) | LNFT | 266 |
0015 | 740-01-00100 | Construction Layout | LUMP | 1 |
0016 | 807-03-00100 | Structural Metalwork (Access System) | LUMP | 1 |
0017 | 808-01-00300 | Steel Grid Flooring LIFT SPAN – GF01 REGULAR | SQFT | 1,553 |
0018 | 810-04-00100 | Hand Railing MACHINERY TOWER PLATFORM | LNFT | 300 |
0019 | 810-04-00100 | Hand Railing PIER MODIFICATION | LNFT | 112.67 |
0020 | 811-01-00100 | Cleaning and Painting ALL STRUCTURAL STEEL – MAIN SPAN & APPROACHES | LUMP | 1 |
0021 | 811-03-00100 | Navigation Clearance Gauge (Painted) | EACH | 2 |
0022 | 814-02-00100 | Elastomeric Bearing Pads (Reinforced) | SFIN | 78.06 |
0023 | 815-03-00300 | Joint Seal (Poured) | LNFT | 48 |
0024 | 820-02-00100 | Temporary Operation & Maintenance of Movable Span | DAY | 300 |
0025 | 822-09-00100 | Electrical System | LUMP | 1 |
0026 | 822-11-00100 | Removal and Disposal of Electrical Equipment | LUMP | 1 |
0027 | 830-01-00100 | Bridge Superstructure Repair [APPROACH SPAN BEARINGS] | EACH | 72 |
0028 | 830-01-00100 | Bridge Superstructure Repair [BRIDGE RAILING] | EACH | 2 |
0029 | 830-01-00100 | Bridge Superstructure Repair [COUNTERWEIGHT CLEANING & SEALING] | EACH | 2 |
0030 | 830-01-00100 | Bridge Superstructure Repair [LIFT GIRDER SHOE PLATES & SOLE PLATES] | EACH | 4 |
0031 | 830-01-00100 | Bridge Superstructure Repair [TOWER DRIVE MACHINERY DECK PLATE] | EACH | 1 |
0032 | 830-01-00100 | Bridge Superstructure Repair [TOWER DRIVE MACHINERY DECK SUPPORTS] | EACH | 1 |
0033 | 830-02-00100 | Bridge Substructure Repair [CLEANING ALL EXISTING CONCRETE SURFACES] | EACH | 1 |
0034 | 830-02-00100 | Bridge Substructure Repair [PIER MODIFICATION] | EACH | 2 |
0035 | 830-07-00100 | Structural Concrete Patching | SQFT | 10 |
0036 | 830-11-00100 | Bolt-Rivet Replacement (Structural Steel) | EACH | 300 |
0037 | NS-830-00900 | Epoxy-Urethane Overlay | SQFT | 5,142 |
0038 | TS-821-02100 | Vertical Lift Bridge Machinery | LUMP | 1 |
0039 | TS-821-06010 | Movable Bridge Traffic Barrier | LUMP | 1 |
0040 | TS-821-06200 | Coating of Existing Movable Bridge Machinery | LUMP | 1 |
0041 | TS-823-01200 | Bridge Operator's House Renovation | LUMP | 1 |