Proposal H.012617.6 Item Summary

Scheduled for Letting 01/08/2020  
   
I-310: I-10 TO US 90


NOTE: Items and quantities shown are provided for informational purposes only and are subject to revision.
0001202-02-06140Removal of Curbs (Concrete) LNFT21
0002202-02-14500Removal of Guard Rail LNFT10,835
0003203-05-00100Excavation and Embankment LUMP1
0004203-07-00100Borrow (Vehicular Measurement) CUYD2,930
0005401-02-00100Aggregate Surface Course (Adjusted Vehicular Measurement) CUYD24
0006502-01-00100Asphalt Concrete TON14,888.6
0007502-01-00200Asphalt Concrete, Drives, Turnouts and Miscellaneous TON1,886.3
0008502-03-00200Asphalt Concrete (4" Thick) SQYD10,832
0009509-01-00100Milling Asphalt Pavement SQYD134,573
0010509-02-00100Contractor Retained Reclaimed Asphalt Pavement CUYD-5,607
0011510-01-00200Pavement Patching (12" Minimum Thickness) SQYD354
0012510-01-00300Pavement Patching (18" Minimum Thickness) SQYD232
0013602-02-00100Cleaning and Resealing Existing Longitudinal and Transverse Pavement Joints LNFT108,597
0014602-03-00100Cleaning and Sealing Random cracks LNFT7,000
0015602-10-00100Longitudinal Shoulder Joints LNFT102,948
0016602-16-00100High Early Strength (HES) Concrete Pavement Full and Partial Depth Patching SQYD3,345
0017704-01-01020Guard Rail (Single Thrie Beam) (6'-3" post spacing) LNFT204
0018704-03-00200Blocked Out Guard Rail - 31", (6'-3" Post Spacing) LNFT8,225.9
0019704-05-00300Guard Rail Anchor Sections - 31", (Trailing End) LNFT257.4
0020704-06-00200Guard Rail Bridge Attachments (Single Thrie Beam) LNFT1,025
0021704-07-00200Guard Rail Transitions (Double Thrie Beam) LNFT750
0022704-10-00310Guard Rail End Treatment, NCHRP 350 - 31" (TL-3 Flared) EACH56
0023707-01-00300Concrete Curb (Mountable) LNFT21
0024707-04-00100Asphalt Curb LNFT432
0025713-01-00100Temporary Signs and Barricades LUMP1
0026713-02-00300Temporary Pavement Markings (8" Width) LNFT32,021
0027713-02-00500Temporary Pavement Markings (24" Width) LNFT13,206
0028713-03-01000Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) MILE73.662
0029713-03-02000Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) MILE38.542
0030713-04-01000Temporary Pavement Markings (Solid Line) (4" Width) MILE110.133
0031713-05-00300Temporary Pavement Legends & Symbols (ONLY) EACH2
0032713-08-00100Temporary Precast Concrete Barrier (Department Furnished) EACH247
0033713-10-00100Temporary Precast Concrete Barrier Movement EACH1,664
0034713-11-00100Portable Changeable Message Signs EACH8
0035717-01-00100Seeding LB335
0036718-01-00100Fertilizer LB16,737
0037724-02-00100Rumble Strips (Shoulder/Edge) MILE15.36
0038727-01-00100Mobilization LUMP1
0039729-16-00300Object Marker Assembly (Type 3) EACH59
0040731-02-00100Reflectorized Raised Pavement Markers EACH41,870
0041732-01-01080Plastic Pavement Striping (24" Width) (Thermoplastic 90 mil) LNFT7,369
0042732-01-02080Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) LNFT61
0043732-02-02000Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) MILE47.07
0044732-02-02040Plastic Pavement Striping (Solid Line) (8" Width) (Thermoplastic 90 mil) MILE1.9
0045732-02-03000Plastic Pavement Striping (Solid Line) (4" Width) (Preformed Tape) (Retroreflectivity Level I) MILE28.508
0046732-02-03040Plastic Pavement Striping (Solid Line) (8" Width) (Preformed Tape) (Retroreflectivity Level I) MILE1.511
0047732-03-04001Plastic Pav't Striping (Broken) (7" Width) (Preformed Tape) (Retroreflectivity Level I) (Black and White Contrast) MILE23.954
0048732-04-15020Plastic Pavement Legends and Symbols (ONLY) EACH2
0049732-05-00100Removal of Existing Markings MILE11.705
0050740-01-00100Construction Layout LUMP1
0051NS-500-00340Saw Cutting Asphalt Concrete Pavement INLF1,190