NOTE: Items and quantities shown are provided for informational purposes only and are subject to revision.
0001202-02-02020Removal of Asphalt Pavement SQYD527
0002202-02-03010Removal of Base – Recycled PCC or Stone SQYD1,925.1
0003202-02-14500Removal of Guard Rail LNFT804.2
0004203-07-00100Borrow (Vehicular Measurement) CUYD815
0005204-05-00100Temporary Sediment Check Dams (Hay) EACH48
0006302-02-08510Class II Base Course (8-1/2" Thick) (Soil Cement) SQYD1,993
0007303-01-00200In-Place Cement Stabilized Base Course (8-1/2" Thick) SQYD39,027
0008303-02-00100Removal of Existing Patches SQYD1,500
0009304-01-00100Lime TON162
0010304-03-00300Lime Treatment (Type C) (10" Thick) SQYD12,306
0011401-02-00100Aggregate Surface Course (Adjusted Vehicular Measurement) CUYD1,374
0012402-01-00100Mainline Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) CUYD63
0013402-03-00100Non-Mainline Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) CUYD30
0014502-01-00100Asphalt Concrete TON8,696.6
0015502-01-00200Asphalt Concrete, Drives, Turnouts and Miscellaneous TON359.7
0016507-01-00100Asphalt Material (CRS-2P Emulsion) GAL26,238
0017507-02-00200Aggregate (S2) SQYD38,586
0018507-02-00300Aggregate (S3) SQYD38,586
0019509-01-00100Milling Asphalt Pavement SQYD33,149
0020509-02-00100Contractor Retained Reclaimed Asphalt Pavement CUYD-1,482
0021510-01-00200Pavement Patching (12" Minimum Thickness) SQYD224
0022704-01-01020Guard Rail (Single Thrie Beam) (6'-3" post spacing) LNFT650
0023704-03-00200Blocked Out Guard Rail - 31", (6'-3" Post Spacing) LNFT87.5
0024704-10-00205Guard Rail End Treatment, MASH, (TL-3 Tangent) EACH6
0025704-10-00310Guard Rail End Treatment, NCHRP 350 - 31" (TL-3 Flared) EACH2
0026713-01-00100Temporary Signs and Barricades LUMP1
0027713-02-00500Temporary Pavement Markings (24" Width) LNFT72
0028713-03-01000Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) MILE5.484
0029713-03-02000Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) MILE5.394
0030713-04-01000Temporary Pavement Markings (Solid Line) (4" Width) MILE13.914
0031713-06-00200Temporary Reflectorized Raised Pavement Markers (Tabs) EACH1,450
0032722-02-00100Project Site Laboratory (Equipped) EACH1
0033724-02-00100Rumble Strips (Shoulder/Edge) MILE5.574
0034727-01-00100Mobilization LUMP1
0035729-16-00200Object Marker Assembly (Type 2) EACH20
0036729-16-00300Object Marker Assembly (Type 3) EACH12
0037731-02-00100Reflectorized Raised Pavement Markers EACH552
0038732-01-02080Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) LNFT72
0039732-02-02000Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) MILE7.139
0040732-03-02000Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) MILE2.697
0041732-05-00100Removal of Existing Markings MILE0.045
0042735-01-00100Mailboxes EACH4
0043735-02-00100Mailbox Supports (Single) EACH4
0044740-01-00100Construction Layout LUMP1