Proposal H.013903.6 Item Summary

Scheduled for Letting 09/11/2019  
   
I-55 & I-12: DIST. WIDE OGFC SPOT REPAIR


NOTE: Items and quantities shown are provided for informational purposes only and are subject to revision.
0001501-03-00100Thin Asphalt Concrete (OGFC) TON927.5
0002509-02-00100Contractor Retained Reclaimed Asphalt Pavement CUYD-493
0003510-01-00250Pavement Patching (14 inch Minimum Thickness) SQYD25
0004713-01-00100Temporary Signs and Barricades LUMP1
0005713-03-01000Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) MILE3.36
0006713-03-02000Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) MILE3.36
0007713-04-01000Temporary Pavement Markings (Solid Line) (4" Width) MILE6.72
0008727-01-00100Mobilization LUMP1
0009731-02-00100Reflectorized Raised Pavement Markers EACH1,777
0010732-01-01040Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) LNFT100
0011732-02-02000Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) MILE3.36
0012732-03-02000Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) MILE1.68
0013732-03-02030Plastic Pavement Striping (Dotted Line)(8" W)(2' L)(Thermo 90 mil) MILE0.02
0014740-01-00100Construction Layout LUMP1
0015NS-509-00001Micro-Milling Asphaltic Pavement SQYD17,666
0016NS-713-00009Portable Changeable Message Sign (with communications) EACH6