Line Number | Item | Description | Unit | Quantity |
0001 | 202-02-00050 | Removal of SPAN TEMPORARY SUPPORT SYSTEM | LUMP | 1 |
0002 | 202-02-04540 | Removal of Bridge Component PARTIAL SLAB SPAN AND BARRIER/CURB REMOVAL | EACH | 1 |
0003 | 713-01-00100 | Temporary Signs and Barricades | LUMP | 1 |
0004 | 713-08-00100 | Temporary Precast Concrete Barrier (Department Furnished) | EACH | 16 |
0005 | 727-01-00100 | Mobilization | LUMP | 1 |
0006 | 731-02-00100 | Reflectorized Raised Pavement Markers | EACH | 4 |
0007 | 732-01-01000 | Plastic Pavement Striping (4" Width) (Thermoplastic 90 mil) | LNFT | 21 |
0008 | 740-01-00100 | Construction Layout | LUMP | 1 |
0009 | 814-01-00100 | Elastomeric Bearing Pads (Non-Reinforced) | SFIN | 1 |
0010 | 815-03-00300 | Joint Seal (Poured) | LNFT | 11 |
0011 | 830-01-00100 | Bridge Superstructure Repair SLAB SPAN PRECAST ELEMENTS AND HES CONCRETE | EACH | 1 |
0012 | 830-07-00100 | Structural Concrete Patching | SQFT | 85 |
0013 | NS-700-00810 | Impact Attenuator (Construction Zone)(Test Level 3) | EACH | 1 |
0014 | NS-713-00009 | Portable Changeable Message Sign (with communications) | EACH | 1 |
0015 | NS-830-00100 | Concrete Bridge Railing Repair and Rehabilitation | LNFT | 20 |