Line Number | Item | Description | Unit | Quantity |
0001 | 201-01-00100 | Clearing and Grubbing | LUMP | 1 |
0002 | 202-02-00050 | Removal of Debris (Bridge Substructure) | LUMP | 1 |
0003 | 202-02-04560 | Removal of Bridge Joint (Joint Armor and Concrete) | LNFT | 325 |
0004 | 202-02-04560 | Removal of Bridge Joint (Joint Sealants) | LNFT | 936 |
0005 | 202-02-04570 | Removal of Bridge Pile (Bridge "H") | EACH | 8 |
0006 | 202-02-06090 | Removal of Concrete Revetment | LUMP | 1 |
0007 | 203-01-00100 | General Excavation | CUYD | 1,532 |
0008 | 203-03-00100 | Embankment | CUYD | 787 |
0009 | 706-03-00100 | Incidental Concrete Paving (4" Thick) | SQYD | 149 |
0010 | 710-01-00100 | Flowable Fill | CUYD | 16 |
0011 | 712-01-00100 | Concrete Cast-in-Place Revetment (4" Thick) | SQYD | 1,473 |
0012 | 712-05-00100 | Cabled Articulated Concrete Block Mattress | SQYD | 1,661 |
0013 | 713-01-00100 | Temporary Signs and Barricades | LUMP | 1 |
0014 | 713-11-00100 | Portable Changeable Message Signs | EACH | 2 |
0015 | 727-01-00100 | Mobilization | LUMP | 1 |
0016 | 740-01-00100 | Construction Layout | LUMP | 1 |
0017 | 804-03-01800 | Steel Piles (24" Pipe) | LNFT | 704 |
0018 | 804-14-00100 | Dynamic Monitoring Assistance | EACH | 2 |
0019 | 807-01-00200 | Structural Metalwork (Grade 50) | LUMP | 1 |
0020 | 815-03-00200 | Joint Seal (Preformed Silicone) | LNFT | 288 |
0021 | 815-03-00300 | Joint Seal (Poured) | LNFT | 974 |
0022 | 830-01-00100 | Bridge Superstructure Repair (Bearing Repair) | EACH | 1 |
0023 | 830-07-00100 | Structural Concrete Patching | SQFT | 11 |
0024 | 830-09-00100 | Structure Jacking | LUMP | 1 |
0025 | NS-830-01100 | Bridge Deck Joint Repair (Both Sides of Joint) | LNFT | 325 |
0026 | NS-830-01200 | Carbon Fiber Reinforced Polymer Repairs | SQFT | 274 |