Line Number | Item | Description | Unit | Quantity |
0001 | 203-07-00100 | Borrow (Vehicular Measurement) | CUYD | 100 |
0002 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | CUYD | 15 |
0003 | 502-01-00100 | Asphalt Concrete | TON | 523.9 |
0004 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | TON | 100.6 |
0005 | 509-01-00100 | Milling Asphalt Pavement | SQYD | 4,698 |
0006 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | CUYD | -195 |
0007 | 713-01-00100 | Temporary Signs and Barricades | LUMP | 1 |
0008 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | MILE | 0.792 |
0009 | 717-01-00100 | Seeding | LB | 7 |
0010 | 718-01-00100 | Fertilizer | LB | 224 |
0011 | 727-01-00100 | Mobilization | LUMP | 1 |
0012 | 732-01-02060 | Plastic Pavement Striping (12" Width) (Thermoplastic 125 mil) | LNFT | 9 |
0013 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | MILE | 0.792 |
0014 | 732-04-18000 | Plastic Pavement Legends and Symbols (RR Crossing) | EACH | 1 |
0015 | 740-01-00100 | Construction Layout | LUMP | 1 |
0016 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | INLF | 1,026 |
0017 | NS-719-00002 | Tree Trimming | LUMP | 1 |