Line Number | Item | Description | Unit | Quantity |
0001 | 202-02-03000 | Removal of Base – Soil Cement, Asphalt, or BCS | SQYD | 1,353 |
0002 | 202-03-38000 | Relocation of Sign . | EACH | 9 |
0003 | 203-05-00100 | Excavation and Embankment | LUMP | 1 |
0004 | 204-02-00100 | Temporary Hay Bales | EACH | 20 |
0005 | 204-06-00100 | Temporary Silt Fencing | LNFT | 1,130 |
0006 | 304-01-00100 | Lime | TON | 23.93 |
0007 | 304-05-00100 | Lime Treatment (Type E) | SQYD | 1,688 |
0008 | 401-01-00100 | Aggregate Surface Course (Net Section) | CUYD | 9.3 |
0009 | 502-03-00600 | Asphalt Concrete (12" Thick) | SQYD | 1,688 |
0010 | 509-01-00100 | Milling Asphalt Pavement | SQYD | 1,353 |
0011 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | CUYD | -240 |
0012 | 601-01-00700 | Portland Cement Concrete Pavement (11" Thick) | SQYD | 1,688 |
0013 | 602-02-00100 | Cleaning and Resealing Existing Longitudinal and Transverse Pavement Joints | LNFT | 420 |
0014 | 602-16-00100 | High Early Strength (HES) Concrete Pavement Full and Partial Depth Patching | SQYD | 200 |
0015 | 713-01-00100 | Temporary Signs and Barricades | LUMP | 1 |
0016 | 713-02-00100 | Temporary Pavement Markings (4" Width) | LNFT | 2,968 |
0017 | 713-02-00500 | Temporary Pavement Markings (24" Width) | LNFT | 400 |
0018 | 713-06-00100 | Temporary Reflectorized Raised Pavement Markers | EACH | 171 |
0019 | 713-07-00100 | Temporary Precast Concrete Barrier (Contractor Furnished) | EACH | 75 |
0020 | 713-11-00100 | Portable Changeable Message Signs | EACH | 2 |
0021 | 727-01-00100 | Mobilization | LUMP | 1 |
0022 | 731-02-00100 | Reflectorized Raised Pavement Markers | EACH | 171 |
0023 | 732-01-01000 | Plastic Pavement Striping (4" Width) (Thermoplastic 90 mil) | LNFT | 2,045 |
0024 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | LNFT | 923 |
0025 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | LNFT | 400 |
0026 | 732-03-02040 | Plastic Pavement Striping (Dotted Line)(8" W)(3' L)(Thermo 90 mil) | MILE | 0.14 |
0027 | 732-05-00100 | Removal of Existing Markings | MILE | 0.702 |
0028 | 739-01-00100 | Hydro-Seeding | ACRE | 0.25 |
0029 | 740-01-00100 | Construction Layout | LUMP | 1 |
0030 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | INLF | 18,486 |