Line Number | Item | Description | Unit | Quantity |
0001 | 201-01-00100 | Clearing and Grubbing | LUMP | 1 |
0002 | 202-02-06100 | Removal of Concrete Walks and Drives | SQYD | 228 |
0003 | 202-02-06140 | Removal of Curbs (Concrete) | LNFT | 110 |
0004 | 202-02-12020 | Removal of Fence (Chain Link) | LNFT | 6 |
0005 | 203-05-00100 | Excavation and Embankment | LUMP | 1 |
0006 | 203-07-00100 | Borrow (Vehicular Measurement) | CUYD | 248 |
0007 | 203-08-00100 | Geotextile Fabric | SQYD | 179 |
0008 | 204-06-00100 | Temporary Silt Fencing | LNFT | 9,293 |
0009 | 705-07-04040 | 6-Foot Single Gates for Chain Link Fence (6-Foot Height) | EACH | 1 |
0010 | 706-01-00100 | Concrete Walk (4" Thick) | SQYD | 957.7 |
0011 | 706-01-00300 | Concrete Walk (6" Thick) | SQYD | 3,295.6 |
0012 | 706-02-00200 | Concrete Drive (6" Thick) | SQYD | 95.1 |
0013 | 706-04-00100 | Handicapped Curb Ramps | EACH | 18 |
0014 | 707-01-00100 | Concrete Curb | LNFT | 67 |
0015 | 711-01-03000 | Riprap (30 lb, 14" Thick) | SQYD | 165 |
0016 | 711-04-00100 | Geotextile Fabric | SQYD | 83 |
0017 | 713-01-00100 | Temporary Signs and Barricades | LUMP | 1 |
0018 | 714-01-00600 | Slab Sodding (St. Augustine) | SQYD | 2,085 |
0019 | 727-01-00100 | Mobilization | LUMP | 1 |
0020 | 729-01-00100 | Sign (Type A) | SQFT | 28 |
0021 | 729-21-00100 | U-Channel Post | EACH | 8 |
0022 | 739-01-00100 | Hydro-Seeding | ACRE | 0.96 |
0023 | 740-01-00100 | Construction Layout | LUMP | 1 |
0024 | NS-201-00001 | Tree and Stump Removal (Under 36" - 36" Diameter) | EACH | 3 |
0025 | NS-719-00005 | Gravel Bed and Filter Cloth over Tree Roots SIDEWALK WITHIN CRITICAL PROTECTION ZONE | SQYD | 167 |
0026 | NS-MSC-00080 | Detectable Warning System Retrofit for Curb Ramps | EACH | 2 |
0027 | TS-800-00300 | Handrail (METAL) | LNFT | 67 |