NOTE: Items and quantities shown are provided for informational purposes only and are subject to revision.
Line Number | Item | Description | Unit | Quantity |
0001 | 202-01-00100 | Removal of Structures and Obstructions | LUMP | 1 |
0002 | 202-02-40000 | Removal of Timber Piles Include removal of twenty (20) piles to be included in total bid cost. | LNFT | 240 |
0003 | 727-01-00100 | Mobilization | LUMP | 1 |
0004 | 804-02-00200 | Treated Timber Piles (Coastal Treatment) | LNFT | 240 |
0005 | 811-01-00100 | Cleaning and Painting Clean and paint existing steel connections at portals and pavilions as shown on plans. Paint color by Architect. | LUMP | 1 |
0006 | NS-ENH-08000 | Handrails As per plans and specification. | LNFT | 1,900 |
0007 | NS-ENH-23021 | Walks (Wooden) As per plans and specification | LUMP | 1 |