Line Number | Item | Description | Unit | Quantity |
0001 | 713-01-00100 | Temporary Signs and Barricades | LUMP | 1 |
0002 | 713-02-00100 | Temporary Pavement Markings (4" Width) | LNFT | 4,780 |
0003 | 713-08-00100 | Temporary Precast Concrete Barrier (Department Furnished) | EACH | 35 |
0004 | 713-10-00100 | Temporary Precast Concrete Barrier Movement | EACH | 35 |
0005 | 713-11-00100 | Portable Changeable Message Signs | EACH | 3 |
0006 | 727-01-00100 | Mobilization | LUMP | 1 |
0007 | 731-02-00100 | Reflectorized Raised Pavement Markers | EACH | 120 |
0008 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | MILE | 0.452 |
0009 | 732-05-00100 | Removal of Existing Markings | MILE | 0.452 |
0010 | 740-01-00100 | Construction Layout | LUMP | 1 |
0011 | 830-01-00100 | Bridge Superstructure Repair (Span 13W) | EACH | 1 |
0012 | 830-01-00100 | Bridge Superstructure Repair (Span 17W) | EACH | 1 |
0013 | NS-700-00810 | Impact Attenuator (Construction Zone)(Test Level 3) | EACH | 1 |
0014 | NS-700-00820 | Impact Attenuator Relocation (Construction Zone) | EACH | 1 |