Line Number | Item | Description | Unit | Quantity |
0001 | 201-01-00100 | Clearing and Grubbing | LUMP | 1 |
0002 | 202-02-14500 | Removal of Guard Rail | LNFT | 3,414 |
0003 | 202-02-38300 | Removal of Sign and U-Channel Post | EACH | 24 |
0004 | 203-07-00100 | Borrow (Vehicular Measurement) | CUYD | 630 |
0005 | 204-06-00100 | Temporary Silt Fencing | LNFT | 1,000 |
0006 | 501-03-00100 | Thin Asphalt Concrete (OGFC) | TON | 14,206 |
0007 | 502-01-00100 | Asphalt Concrete | TON | 41,896.6 |
0008 | 509-01-00100 | Milling Asphalt Pavement | SQYD | 379,193 |
0009 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | CUYD | -21,065 |
0010 | 510-01-00300 | Pavement Patching (18" Minimum Thickness) | SQYD | 191 |
0011 | 704-03-00200 | Blocked Out Guard Rail – 31”, (6’-3” Post Spacing) | LNFT | 2,773.9 |
0012 | 704-05-00300 | Guard Rail Anchor Sections – 31”, (Trailing End) | LNFT | 80 |
0013 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | LNFT | 150 |
0014 | 704-10-00310 | Guard Rail End Treatment, NCHRP 350 - 31" (TL-3 Flared) | EACH | 14 |
0015 | 706-03-00300 | Incidental Concrete Paving (6" Thick) | SQYD | 2,140 |
0016 | 707-01-00100 | Concrete Curb | LNFT | 81 |
0017 | 713-01-00100 | Temporary Signs and Barricades | LUMP | 1 |
0018 | 713-02-00300 | Temporary Pavement Markings (8" Width) | LNFT | 2,716 |
0019 | 713-02-00500 | Temporary Pavement Markings (24" Width) | LNFT | 1,358 |
0020 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | MILE | 0.116 |
0021 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | MILE | 46.14 |
0022 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | MILE | 92.28 |
0023 | 716-01-00100 | Mulch (Vegetative) | TON | 37.3 |
0024 | 717-01-00100 | Seeding | LB | 256 |
0025 | 718-01-00100 | Fertilizer | LB | 8,608 |
0026 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | MILE | 30.76 |
0027 | 727-01-00100 | Mobilization | LUMP | 1 |
0028 | 729-16-00300 | Object Marker Assembly (Type 3) | EACH | 24 |
0029 | 731-02-00100 | Reflectorized Raised Pavement Markers | EACH | 5,650 |
0030 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | LNFT | 2,716 |
0031 | 732-01-01080 | Plastic Pavement Striping (24" Width) (Thermoplastic 90 mil) | LNFT | 1,358 |
0032 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | MILE | 30.76 |
0033 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | MILE | 15.38 |
0034 | 732-03-02030 | Plastic Pavement Striping (Dotted Line)(8" W)(2' L)(Thermo 90 mil) | MILE | 0.116 |
0035 | 732-03-02101 | Plastic Pavement Striping (Broken Line) (4" W) (Preformed Tape Retroreflectivity I or Thermo 90 mil)(Black Contrast) | MILE | 0.094 |
0036 | 732-05-00100 | Removal of Existing Markings CONCRETE BRIDGE DECK | MILE | 0.094 |
0037 | 740-01-00100 | Construction Layout | LUMP | 1 |
0038 | NS-713-00009 | Portable Changeable Message Sign (with communications) | EACH | 6 |