Proposal H.010596.6-R1 Item Summary

Scheduled for Letting 12/12/2018  
   
PETERSON ROAD BRIDGES


NOTE: Items and quantities shown are provided for informational purposes only and are subject to revision.
0001201-01-00100Clearing and Grubbing LUMP1
0002202-01-00100Removal of Structures and Obstructions LUMP1
0003202-02-00010Removal of Bridge (Sta. 100+00, 18.3' x 62' Timber Bridge)EACH1
0004202-02-00010Removal of Bridge (Sta. 19+01.68, 18.8' x 58' Timber Bridge with Metal Railings)EACH1
0005202-02-00010Removal of Bridge (Sta. 200+00, 18.3' x 96' Timber Bridge with Steel Girders)EACH1
0006203-05-00100Excavation and Embankment LUMP1
0007203-07-00100Borrow (Vehicular Measurement) CUYD172
0008204-02-00100Temporary Hay Bales EACH30
0009204-03-00100Temporary Slope Drains LNFT64
0010204-05-00100Temporary Sediment Check Dams (Hay) EACH10
0011204-06-00100Temporary Silt Fencing LNFT1,817
0012302-01-00300Class II Base Course (Crushed Stone) CUYD718.4
0013401-02-00100Aggregate Surface Course (Adjusted Vehicular Measurement) CUYD3
0014502-01-00100Asphalt Concrete TON569.1
0015701-05-01045Side Drain Pipe (18" RCP/RPVCP/CPEPDW) LNFT20
0016701-05-02061Side Drain Pipe (Erosion) (24" RPVCP/CPEPDW/CMP) LNFT105
0017701-05-02101Side Drain Pipe (Erosion) (36" RPVCP/CPEPDW/CMP) LNFT105
0018702-08-00100Side Drain Safety End (Type 1) EACH3
0019702-08-00200Side Drain Safety End (Type 2) EACH1
0020704-03-00200Blocked Out Guard Rail – 31”, (6’-3” Post Spacing) LNFT150
0021704-07-00200Guard Rail Transitions (Double Thrie Beam) LNFT300
0022704-10-00105Guard Rail End Treatment (Flared, 12' - 6" Length) EACH4
0023704-10-00310Guard Rail End Treatment, NCHRP 350 - 31" (TL-3 Flared) EACH8
0024705-01-00100Barbed Wire Fence LNFT1,021
0025711-01-04000Riprap (55 lb, 18" Thick) SQYD2,865
0026711-01-04020Riprap (55 lb, 24" Thick) SQYD228
0027711-04-00100Geotextile Fabric SQYD3,093
0028713-01-00100Temporary Signs and Barricades LUMP1
0029716-01-00100Mulch (Vegetative) TON3
0030717-01-00100Seeding LB51
0031718-01-00100Fertilizer LB1,526
0032727-01-00100Mobilization LUMP1
0033729-16-00300Object Marker Assembly (Type 3) EACH16
0034740-01-00100Construction Layout LUMP1
0035804-01-00300Precast Concrete Piles (16") LNFT2,328
0036804-01-00600Precast Concrete Piles (24") LNFT1,080
0037804-17-00100Construction Site Survey LUMP1
0038804-18-00100Vibration Monitoring DAY64
0039805-01-00200Class A1 Concrete (Deck) CUYD117.56
0040805-01-00300Class A1 Concrete (Bent Cap) CUYD45.94
0041805-08-00100Precast-Prestressed Concrete Girders (Type Quad Beam) LNFT789.6
0042805-12-00100Bridge Superstructure and Substructure (24' Roadway, 90 Degree Crossing) (Cast-In-Place)SQFT1,440
0043805-12-00100Bridge Superstructure and Substructure (24' Roadway, 90 Degree Crossing) (Curved, Cast-In-Place)SQFT3,360
0044805-18-00100Concrete Finish (Class 2 Rubbed Finish) SQFT4,169.8
0045805-18-00200Concrete Finish (Class 3 Special Finish) SQFT4,169.8
0046806-01-00100Deformed Reinforcing Steel LB35,820
0047807-04-00100Structural Metalwork Grade 50, Anchor Bolts & HardwareLUMP1
0048810-01-00200Concrete Bridge Railing (Slotted) LNFT320
0049813-01-00100Concrete Approach Slabs (Cast-in-Place) (24' CLEAR RDWY., 90 DEGREE CROSSING, WITHOUT ASPHALT) (10' LONG)SQFT498.96
0050813-01-00100Concrete Approach Slabs (Cast-in-Place) (CURVED CAST-IN-PLACE) (24' CLEAR RDWY., 90 DEGREE CROSSING, WITHOUT ASPHALT) (10' LONG)SQFT997.92
0051814-01-00100Elastomeric Bearing Pads (Non-Reinforced) SFIN10
0052814-02-00100Elastomeric Bearing Pads (Reinforced) SFIN41.3
0053815-02-00200Sealed Expansion Joint (End Dams and Preformed Silicone Seal) LNFT120