Line Number | Item | Description | Unit | Quantity |
0001 | 201-01-00100 | Clearing and Grubbing | LUMP | 1 |
0002 | 202-01-00100 | Removal of Structures and Obstructions | LUMP | 1 |
0003 | 203-01-00100 | General Excavation EMBANKMENT SLIDES | CUYD | 10,518 |
0004 | 203-01-00100 | General Excavation SPILLWAY APPROACH CHANNEL | CUYD | 10,564 |
0005 | 203-03-00100 | Embankment HEADER EMBANKMENT SLIDE | CUYD | 16,316 |
0006 | 203-03-00100 | Embankment SPILLWAY APPROACH CHANNEL & WING WALL SCOUR HOLES | CUYD | 17,929 |
0007 | 204-05-00200 | Temporary Sediment Check Dams (Stone) | EACH | 1 |
0008 | 204-06-00100 | Temporary Silt Fencing | LNFT | 1,797 |
0009 | 602-02-00100 | Cleaning and Resealing Existing Longitudinal and Transverse Pavement Joints | LNFT | 4,711 |
0010 | 602-06-00100 | Partial Depth Patching of Jointed Concrete Pavement | SQYD | 63 |
0011 | 703-04-00100 | Nonperforated Pipe Underdrains | LNFT | 40 |
0012 | 711-02-00100 | Riprap (2 lb) | CUYD | 1,344 |
0013 | 711-02-00400 | Riprap (55 lb) | CUYD | 794 |
0014 | 711-04-00100 | Geotextile Fabric | SQYD | 8,751 |
0015 | 717-01-00100 | Seeding | LB | 115 |
0016 | 718-01-00100 | Fertilizer | LB | 1,600 |
0017 | 720-01-01000 | Erosion Control System (Slope Protection) (Type A) | SQYD | 7,035 |
0018 | 722-02-00100 | Project Site Laboratory (Equipped) | EACH | 1 |
0019 | 727-01-00100 | Mobilization | LUMP | 1 |
0020 | 740-01-00100 | Construction Layout | LUMP | 1 |
0021 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | INLF | 897 |