Line Number | Item | Description | Unit | Quantity |
0001 | 201-01-00100 | Clearing and Grubbing | LUMP | 1 |
0002 | 202-01-00100 | Removal of Structures and Obstructions | LUMP | 1 |
0003 | 202-02-32100 | Removal of Pipe (Cross Drain) (CROSS DRAIN)(STA 15+00 - 2-96" X 45' STEEL RAILCAR CULVERTS) | LNFT | 90 |
0004 | 202-02-32100 | Removal of Pipe (Cross Drain) (CROSS DRAIN)(STA 35+00 - 2-96" X 45' STEEL RAILCAR CULVERTS) | LNFT | 90 |
0005 | 202-02-32120 | Removal of Pipe (Side Drain) (18" CMP) | LNFT | 50 |
0006 | 203-05-00100 | Excavation and Embankment | LUMP | 1 |
0007 | 204-02-00100 | Temporary Hay Bales | EACH | 17 |
0008 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | EACH | 9 |
0009 | 204-06-00100 | Temporary Silt Fencing | LNFT | 2,525 |
0010 | 302-01-00300 | Class II Base Course (Crushed Stone) | CUYD | 534.8 |
0011 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | CUYD | 16 |
0012 | 502-01-00100 | Asphalt Concrete | TON | 443.4 |
0013 | 701-05-02041 | Side Drain Pipe (Erosion) (18" RPVCP/CPEPDW/CMP) | LNFT | 400 |
0014 | 701-05-02061 | Side Drain Pipe (Erosion) (24" RPVCP/CPEPDW/CMP) | LNFT | 105 |
0015 | 702-08-00100 | Side Drain Safety End (Type 1) | EACH | 1 |
0016 | 704-03-00200 | Blocked Out Guard Rail – 31”, (6’-3” Post Spacing) | LNFT | 225 |
0017 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | LNFT | 200 |
0018 | 704-10-00105 | Guard Rail End Treatment (Flared, 12' - 6" Length) | EACH | 4 |
0019 | 704-10-00250 | Guard Rail End Treatment (Tangent)[Test Level 2] | EACH | 4 |
0020 | 711-01-03000 | Riprap (30 lb, 14" Thick) | SQYD | 815 |
0021 | 711-04-00100 | Geotextile Fabric | SQYD | 815 |
0022 | 713-01-00100 | Temporary Signs and Barricades | LUMP | 1 |
0023 | 716-01-00100 | Mulch (Vegetative) | TON | 0.9 |
0024 | 717-01-00100 | Seeding | LB | 20 |
0025 | 718-01-00100 | Fertilizer | LB | 430 |
0026 | 720-01-01020 | Erosion Control System (Slope Protection) (Type B) | SQYD | 200 |
0027 | 727-01-00100 | Mobilization | LUMP | 1 |
0028 | 729-16-00300 | Object Marker Assembly (Type 3) | EACH | 8 |
0029 | 735-01-00100 | Mailboxes | EACH | 1 |
0030 | 735-02-00100 | Mailbox Supports (Single) | EACH | 1 |
0031 | 740-01-00100 | Construction Layout | LUMP | 1 |
0032 | 804-01-00200 | Precast Concrete Piles (14") | LNFT | 2,372 |
0033 | 804-17-00100 | Construction Site Survey | LUMP | 1 |
0034 | 804-18-00100 | Vibration Monitoring | DAY | 16 |
0035 | 805-12-00900 | Bridge Superstructure and Substructure (24 ft. CLR RDWY.; 75 DEGREE CROSSING, C.I.P.) | SQFT | 1,920 |
0036 | 805-12-00900 | Bridge Superstructure and Substructure (28' CLR. RDWY, 75 DEGREE CROSSING, C.I.P.) | SQFT | 1,680 |
0037 | 805-18-00100 | Concrete Finish (Class 2 Rubbed Finish) | SQFT | 1,694.64 |
0038 | 805-18-00200 | Concrete Finish (Class 3 Special Finish) | SQFT | 1,694.64 |
0039 | 813-01-00100 | Concrete Approach Slabs (Cast-in-Place) | SQFT | 500 |
0040 | 813-01-00100 | Concrete Approach Slabs (Cast-in-Place) (CAST-IN-PLACE)(28 FT. CLR. RDWY,; 75 DEGREE CROSSING, CURVED; W/O ASPHALT) | SQFT | 580 |