Line Number | Item | Description | Unit | Quantity |
0001 | 201-01-00100 | Clearing and Grubbing (Including removal of trees) | LUMP | 1 |
0002 | 202-02-00010 | Removal of Bridge (Sta. 10+50; 23.3' Wide x 58' Long; Timber) | EACH | 1 |
0003 | 202-02-00010 | Removal of Bridge (Station 40+51; 22.7' Wide x 58' Long, Timber) | EACH | 1 |
0004 | 202-02-12000 | Removal of Fence (30 Lin Ft. of 5' wood rail fence and 230 Lin Ft. of 4-strand barbed wire fence) | LNFT | 260 |
0005 | 203-05-00100 | Excavation and Embankment | LUMP | 1 |
0006 | 204-02-00100 | Temporary Hay Bales | EACH | 33 |
0007 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | EACH | 11 |
0008 | 204-06-00100 | Temporary Silt Fencing | LNFT | 1,362 |
0009 | 302-01-00300 | Class II Base Course (Crushed Stone) | CUYD | 336.7 |
0010 | 502-01-00100 | Asphalt Concrete | TON | 268.8 |
0011 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | TON | 4.6 |
0012 | 701-12-01120 | Corrugated Metal Pipe (Extension) (42") | LNFT | 12 |
0013 | 704-03-00200 | Blocked Out Guard Rail – 31”, (6’-3” Post Spacing) | LNFT | 100 |
0014 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | LNFT | 200 |
0015 | 704-10-00100 | Guard Rail End Treatment (Flared) | EACH | 8 |
0016 | 705-09-00100 | Rebuilt Fence (includes 40 Lin Ft. of steel pipe (3-rail fence) & 170 Lin Ft. of 4-strand barbed wire fence) | LNFT | 210 |
0017 | 711-01-04000 | Riprap (55 lb, 18" Thick) | SQYD | 840 |
0018 | 711-04-00100 | Geotextile Fabric | SQYD | 840 |
0019 | 713-01-00100 | Temporary Signs and Barricades | LUMP | 1 |
0020 | 716-01-00100 | Mulch (Vegetative) | TON | 2 |
0021 | 717-01-00100 | Seeding | LB | 48 |
0022 | 718-01-00100 | Fertilizer | LB | 1,023 |
0023 | 727-01-00100 | Mobilization | LUMP | 1 |
0024 | 729-16-00300 | Object Marker Assembly (Type 3) | EACH | 8 |
0025 | 735-01-00100 | Mailboxes | EACH | 1 |
0026 | 735-02-00100 | Mailbox Supports (Single) | EACH | 1 |
0027 | 740-01-00100 | Construction Layout | LUMP | 1 |
0028 | 804-01-00300 | Precast Concrete Piles (16") | LNFT | 2,312 |
0029 | 804-17-00100 | Construction Site Survey | LUMP | 1 |
0030 | 804-18-00100 | Vibration Monitoring | DAY | 44 |
0031 | 805-12-00100 | Bridge Superstructure and Substructure (24' Roadway, 90 Degree Crossing) (Cast-In-Place) | SQFT | 2,400 |
0032 | 805-12-00500 | Bridge Superstructure and Substructure (28' Roadway, 90 Degree Crossing) (Cast-In-Place) | SQFT | 2,240 |
0033 | 805-18-00100 | Concrete Finish (Class 2 Rubbed Finish) | SQFT | 1,059.3 |
0034 | 805-18-00200 | Concrete Finish (Class 3 Special Finish) | SQFT | 1,059.3 |
0035 | 813-01-00100 | Concrete Approach Slabs (Cast-in-Place) (24' Clear Roadway, 90 Degree Crossing, w/o Asphalt)(10' Length) | SQFT | 500 |
0036 | 813-01-00100 | Concrete Approach Slabs (Cast-in-Place) (28' Clear Roadway; 90 Degree Crossing, w/o Asphalt, 10' Length) | SQFT | 580 |
0037 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement (3 1/2" Depth) | INLF | 84 |
0038 | NS-MSC-00120 | Drainage Structure (WATER GATE ASSEMBLY) | EACH | 1 |