Line Number | Item | Description | Unit | Quantity |
0001 | 202-02-00020 | Removal of Aggregate Surface Course (2" Thick) | SQYD | 550 |
0002 | 202-02-38500 | Removal of Surfacing and Stabilized Base | SQYD | 27.8 |
0003 | 204-06-00100 | Temporary Silt Fencing | LNFT | 16,401 |
0004 | 204-07-00100 | Temporary Stone Construction Entrance | EACH | 2 |
0005 | 302-01-00100 | Class II Base Course | CUYD | 1,770 |
0006 | 306-02-00100 | Scarifying and Compacting Roadbed (6" Thick) | SQYD | 8,732 |
0007 | 502-01-00100 | Asphalt Concrete (Level A) | TON | 2,380.5 |
0008 | 705-06-00300 | Chain Link Fence (6-Foot Height) | LNFT | 900 |
0009 | 706-03-00300 | Incidental Concrete Paving (6" Thick) | SQYD | 82.1 |
0010 | 713-01-00100 | Temporary Signs and Barricades | LUMP | 1 |
0011 | 714-01-00100 | Slab Sodding (Bermuda Grass) | SQYD | 510 |
0012 | 718-01-00100 | Fertilizer | LB | 75 |
0013 | 727-01-00100 | Mobilization | LUMP | 1 |
0014 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | LNFT | 24 |
0015 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) (Yellow) | MILE | 1.541 |
0016 | 739-01-00100 | Hydro-Seeding | ACRE | 0.5 |
0017 | 740-01-00100 | Construction Layout | LUMP | 1 |
0018 | NS-300-00060 | Geogrid | SQYD | 6,986 |
0019 | NS-ENH-02000 | Benches (Park) (Furnished and Installed) | EACH | 2 |
0020 | NS-ENH-02040 | Bike Racks (Furnished and Installed) | EACH | 2 |
0021 | NS-ENH-08000 | Handrails (Furnished and Installed) | LNFT | 670 |
0022 | NS-ENH-20020 | Trash Receptacle (Furnished and Installed) | EACH | 2 |