Line Number | Item | Description | Unit | Quantity |
0001 | 202-02-00020 | Removal of Concrete Flume | SQYD | 5 |
0002 | 202-02-02000 | Removal of Asphalt Drives | SQYD | 867 |
0003 | 202-02-02020 | Removal of Asphalt Pavement | SQYD | 1,888.9 |
0004 | 202-02-06100 | Removal of Concrete Walks and Drives | SQYD | 1,018 |
0005 | 202-02-06140 | Removal of Curbs (Concrete) | LNFT | 576.4 |
0006 | 202-02-26300 | Removal of Median / Island | SQYD | 24 |
0007 | 202-02-32120 | Removal of Pipe (Side Drain) (18") | LNFT | 717 |
0008 | 202-03-38000 | Relocation of Sign (Type A) | EACH | 26 |
0009 | 202-03-38000 | Relocation of Sign (Type D) | EACH | 1 |
0010 | 203-01-00100 | General Excavation | CUYD | 3,047 |
0011 | 203-03-00100 | Embankment | CUYD | 509 |
0012 | 203-10-00100 | Cleaning Existing Ditches | LNFT | 300 |
0013 | 204-02-00100 | Temporary Hay Bales | EACH | 50 |
0014 | 204-06-00100 | Temporary Silt Fencing | LNFT | 10,820 |
0015 | 305-01-02020 | Subgrade Layer (8" Thick) (Treated) | SQYD | 4,879 |
0016 | 402-01-00100 | Mainline Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | CUYD | 750 |
0017 | 502-01-00100 | Asphalt Concrete | TON | 3,813.1 |
0018 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | TON | 50.5 |
0019 | 509-01-00100 | Milling Asphalt Pavement | SQYD | 8,774 |
0020 | 701-03-01020 | Storm Drain Pipe (18" RCP/PP) | LNFT | 460 |
0021 | 701-03-01040 | Storm Drain Pipe (24" RCP/PP) | LNFT | 12 |
0022 | 701-05-01040 | Side Drain Pipe (18" RCP/PP/CMP) | LNFT | 321 |
0023 | 701-05-01060 | Side Drain Pipe (24" RCP/PP/CMP) | LNFT | 140 |
0024 | 701-15-00100 | Concrete Collar | EACH | 2 |
0025 | 702-03-00100 | Catch Basins (CB-01) | EACH | 4 |
0026 | 702-03-00500 | Catch Basins (CB-06) | EACH | 3 |
0027 | 702-04-00100 | Adjusting Manholes | EACH | 4 |
0028 | 702-08-00100 | Side Drain Safety End (Type 1) | EACH | 30 |
0029 | 706-01-00100 | Concrete Walk (4" Thick) | SQYD | 37.9 |
0030 | 706-02-00200 | Concrete Drive (6" Thick) | SQYD | 1,351.9 |
0031 | 706-03-00300 | Incidental Concrete Paving (6" Thick) | SQYD | 130.2 |
0032 | 707-03-00100 | Combination Concrete Curb and Gutter | LNFT | 1,202 |
0033 | 713-01-00100 | Temporary Signs and Barricades | LUMP | 1 |
0034 | 713-02-00300 | Temporary Pavement Markings (8" Width) | LNFT | 650 |
0035 | 713-02-00500 | Temporary Pavement Markings (24" Width) | LNFT | 140 |
0036 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | MILE | 2.563 |
0037 | 726-01-00100 | Bedding Material | CUYD | 192 |
0038 | 727-01-00100 | Mobilization | LUMP | 1 |
0039 | 731-02-00100 | Reflectorized Raised Pavement Markers | EACH | 280 |
0040 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | LNFT | 650 |
0041 | 732-01-01080 | Plastic Pavement Striping (24" Width) (Thermoplastic 90 mil) | LNFT | 693 |
0042 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | MILE | 2.563 |
0043 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | EACH | 3 |
0044 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | EACH | 4 |
0045 | 740-01-00100 | Construction Layout | LUMP | 1 |
0046 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | INLF | 9,021.5 |
0047 | 201-01-00100 | Clearing and Grubbing | LUMP | 1 |