Line Number | Item | Description | Unit | Quantity |
0001 | 202-02-38500 | Removal of Surfacing and Stabilized Base | SQYD | 44.4 |
0002 | 203-01-00100 | General Excavation | CUYD | 207.4 |
0003 | 203-07-00100 | Borrow (Vehicular Measurement) | CUYD | 75 |
0004 | 302-01-00100 | Class II Base Course Stone or Recycled PCCP | CUYD | 83.6 |
0005 | 502-01-00100 | Asphalt Concrete | TON | 226.8 |
0006 | 509-01-00100 | Milling Asphalt Pavement | SQYD | 878 |
0007 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | CUYD | -29.5 |
0008 | 704-03-00200 | Blocked Out Guard Rail – 31”, (6’-3” Post Spacing) | LNFT | 125 |
0009 | 704-06-00100 | Guardrail Bridge Attachments | LNFT | 100 |
0010 | 704-10-00205 | Guard Rail End Treatment, MASH, (TL-3 Tangent) | EACH | 4 |
0011 | 710-01-00100 | Flowable Fill | CUYD | 178 |
0012 | 716-01-00100 | Mulch (Vegetative) | TON | 0.263 |
0013 | 717-01-00100 | Seeding | LB | 4.5 |
0014 | 718-01-00100 | Fertilizer | LB | 150 |
0015 | 727-01-00100 | Mobilization | LUMP | 1 |
0016 | 729-16-00300 | Object Marker Assembly (Type 3) | EACH | 4 |
0017 | 732-01-01000 | Plastic Pavement Striping (4" Width) (Thermoplastic 90 mil) | LNFT | 3,042 |
0018 | 740-01-00100 | Construction Layout | LUMP | 1 |