Line Number | Item | Description | Unit | Quantity |
0001 | 202-01-00100 | Removal of Structures and Obstructions | LUMP | 1 |
0002 | 202-02-06090 | Removal of Concrete Revetment | LUMP | 1 |
0003 | 202-02-32120 | Removal of Pipe (Side Drain) 24" CMP | LNFT | 16 |
0004 | 202-02-38500 | Removal of Surfacing and Stabilized Base | SQYD | 55 |
0005 | 203-05-00100 | Excavation and Embankment | LUMP | 1 |
0006 | 203-07-00100 | Borrow (Vehicular Measurement) | CUYD | 1,875 |
0007 | 204-02-00100 | Temporary Hay Bales | EACH | 150 |
0008 | 204-06-00100 | Temporary Silt Fencing | LNFT | 1,200 |
0009 | 510-01-00102 | Pavement Patching (8" Minimum Thickness) | SQYD | 55 |
0010 | 601-04-00100 | Portland Cement Concrete Pavement Coring | EACH | 16 |
0011 | 710-01-00100 | Flowable Fill | CUYD | 45 |
0012 | 711-01-04000 | Riprap (55 lb, 18" Thick) | SQYD | 1,454 |
0013 | 711-01-05000 | Riprap (130 lb, 24" Thick) | SQYD | 502 |
0014 | 711-04-00100 | Geotextile Fabric | SQYD | 1,956 |
0015 | 713-01-00100 | Temporary Signs and Barricades | LUMP | 1 |
0016 | 713-11-00100 | Portable Changeable Message Signs | EACH | 2 |
0017 | 716-01-00100 | Mulch (Vegetative) | TON | 1.394 |
0018 | 717-01-00100 | Seeding | LB | 41.5 |
0019 | 718-01-00100 | Fertilizer | LB | 697 |
0020 | 720-01-01000 | Erosion Control System (Slope Protection) (Type A) | SQYD | 200 |
0021 | 727-01-00100 | Mobilization | LUMP | 1 |
0022 | 740-01-00100 | Construction Layout | LUMP | 1 |