Line Number | Item | Description | Unit | Quantity |
0001 | 202-02-02020 | Removal of Asphalt Pavement | SQYD | 825 |
0002 | 202-02-32500 | Removal of Portland Cement Concrete Pavement | SQYD | 139 |
0003 | 203-07-00100 | Borrow (Vehicular Measurement) | CUYD | 1,178 |
0004 | 204-02-00100 | Temporary Hay Bales | EACH | 860 |
0005 | 204-06-00100 | Temporary Silt Fencing | LNFT | 23,750 |
0006 | 713-01-00100 | Temporary Signs and Barricades | LUMP | 1 |
0007 | 720-01-01000 | Erosion Control System (Slope Protection) (Type A) | SQYD | 7,200 |
0008 | 721-01-00100 | Mowing | CYCL | 5 |
0009 | 727-01-00100 | Mobilization | LUMP | 1 |
0010 | 739-01-00100 | Hydro-Seeding | ACRE | 16.36 |
0011 | 740-01-00100 | Construction Layout | LUMP | 1 |
0012 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | INLF | 713,795 |
0013 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | INLF | 2,550 |
0014 | NS-704-00001 | High Tension Cable Barrier | LNFT | 139,156 |
0015 | NS-704-00002 | Cable Barrier Gated End Terminal | EACH | 72 |
0016 | NS-704-00003 | Concrete Strip | SQYD | 132,061 |
0017 | NS-713-00009 | Portable Changeable Message Sign (with communications) | EACH | 6 |