Line Number | Item | Description | Unit | Quantity |
0001 | 201-01-00100 | Clearing and Grubbing | LUMP | 1 |
0002 | 202-01-00100 | Removal of Structures and Obstructions | LUMP | 1 |
0003 | 202-02-32100 | Removal of Pipe (Cross Drain) 2 - 72" X 37' CMP | LNFT | 74 |
0004 | 203-05-00100 | Excavation and Embankment | LUMP | 1 |
0005 | 204-02-00100 | Temporary Hay or Straw Bales | EACH | 10 |
0006 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | EACH | 5 |
0007 | 204-06-00100 | Temporary Silt Fencing | LNFT | 959 |
0008 | 302-01-00700 | Class II Base Course (Stone) | CUYD | 181.2 |
0009 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | CUYD | 18 |
0010 | 502-01-00100 | Superpave Asphaltic Concrete | TON | 143.8 |
0011 | 701-05-02080 | Side Drain Pipe (Erosion) (30" PP/CMP) | LNFT | 110 |
0012 | 704-03-00100 | Blocked Out Guard Rail | LNFT | 50 |
0013 | 704-08-00200 | Guard Rail Transitions (Double Thrie Beam) | LNFT | 100 |
0014 | 704-11-00105 | Guard Rail End Treatment (Flared, 12' - 6" Length) | EACH | 4 |
0015 | 711-01-04000 | Riprap (55 lb, 18" Thick) | SQYD | 432 |
0016 | 711-04-00100 | Geotextile Fabric | SQYD | 432 |
0017 | 713-01-00100 | Temporary Signs and Barricades | LUMP | 1 |
0018 | 716-01-00100 | Mulch (Vegetative) | TON | 0.5 |
0019 | 717-01-00100 | Seeding | LB | 11 |
0020 | 718-01-00100 | Fertilizer | LB | 240 |
0021 | 727-01-00100 | Mobilization | LUMP | 1 |
0022 | 729-16-00300 | Object Marker Assembly (Type 3) | EACH | 4 |
0023 | 740-01-00100 | Construction Layout | LUMP | 1 |
0024 | 804-01-00200 | Precast Concrete Piles (14") | LNFT | 944 |
0025 | 804-12-00100 | Loading Permanent Piles | EACH | 1 |
0026 | 805-10-01300 | Bridge Superstructure and Substructure (24' Clear Roadway; 90 Degree Crossing) | SPAN | 3 |
0027 | NS-800-00040 | Concrete Approach Slabs (24' CLEAR ROADWAY, 90 DEG. CROSSING) (W/O ASPHALT) | EACH | 2 |