Line Number | Item | Description | Unit | Quantity |
0001 | 203-07-00100 | Borrow (Vehicular Measurement) | CUYD | 55 |
0002 | 502-01-00100 | Asphalt Concrete | TON | 722.8 |
0003 | 509-01-00100 | Milling Asphalt Pavement | SQYD | 5,235.5 |
0004 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | CUYD | -290.86 |
0005 | 510-01-00260 | Pavement Patching (16 inch Minimum Thickness) | SQYD | 699 |
0006 | 713-01-00100 | Temporary Signs and Barricades | LUMP | 1 |
0007 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | MILE | 1.32 |
0008 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | MILE | 1.32 |
0009 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | MILE | 2.64 |
0010 | 717-01-00100 | Seeding | LB | 10 |
0011 | 718-01-00100 | Fertilizer | LB | 200 |
0012 | 727-01-00100 | Mobilization | LUMP | 1 |
0013 | 731-02-00100 | Reflectorized Raised Pavement Markers | EACH | 88 |
0014 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | MILE | 1.32 |
0015 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | MILE | 0.66 |
0016 | 740-01-00100 | Construction Layout | LUMP | 1 |
0017 | 203-07-00100 | Borrow (Vehicular Measurement) | CUYD | 18 |
0018 | 502-01-00100 | Asphalt Concrete | TON | 308.7 |
0019 | 509-01-00100 | Milling Asphalt Pavement | SQYD | 2,533.3 |
0020 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | CUYD | -140.74 |
0021 | 713-01-00100 | Temporary Signs and Barricades | LUMP | 1 |
0022 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | MILE | 0.44 |
0023 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | MILE | 0.44 |
0024 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | MILE | 0.88 |
0025 | 717-01-00100 | Seeding | LB | 3 |
0026 | 718-01-00100 | Fertilizer | LB | 70 |
0027 | 727-01-00100 | Mobilization | LUMP | 1 |
0028 | 731-02-00100 | Reflectorized Raised Pavement Markers | EACH | 30 |
0029 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | MILE | 0.44 |
0030 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | MILE | 0.22 |
0031 | 740-01-00100 | Construction Layout | LUMP | 1 |
0032 | 203-07-00100 | Borrow (Vehicular Measurement) | CUYD | 30 |
0033 | 502-01-00100 | Asphalt Concrete | TON | 495.5 |
0034 | 509-01-00100 | Milling Asphalt Pavement | SQYD | 4,095.5 |
0035 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | CUYD | -227.53 |
0036 | 713-01-00100 | Temporary Signs and Barricades | LUMP | 1 |
0037 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | MILE | 0.72 |
0038 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | MILE | 0.72 |
0039 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | MILE | 1.44 |
0040 | 717-01-00100 | Seeding | LB | 5 |
0041 | 718-01-00100 | Fertilizer | LB | 110 |
0042 | 727-01-00100 | Mobilization | LUMP | 1 |
0043 | 731-02-00100 | Reflectorized Raised Pavement Markers | EACH | 48 |
0044 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | MILE | 0.72 |
0045 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | MILE | 0.36 |
0046 | 740-01-00100 | Construction Layout | LUMP | 1 |