Proposal:4400033358
Parish:East Baton Rouge
Description:AREA A: DRAINAGE STRUCTURE REPLACEMENT
Type Construction:
Estimated Construction Cost:$378,904.00
| Rank | License | Bidder | Construction Bid |
| 1 | 68237 | GULF STATES SERVICES, LLC | $415,505.00 |
| 2 | 74077 | TLP Construction Co. LLC | $600,920.00 |
| 3 | 68424 | Procivil, LLC | $657,340.00 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - GULF STATES SERVICES, LLC | - 2 - TLP Construction Co. LLC | - 3 - Procivil, LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 12,000.00 | 12,000.00 | 20,000.00 | 20,000.00 | 25,000.00 | 25,000.00 | | 0002 | 202-02-06100 | Removal of Concrete Walks and Drives CONCRETE WALK REMOVAL | 8.8 | SQYD | 175.00 | 1,540.00 | 100.00 | 880.00 | 100.00 | 880.00 | | 0003 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 3,300.00 | 3,300.00 | 20,000.00 | 20,000.00 | 10,000.00 | 10,000.00 | | 0004 | 204-06-00100 | Temporary Silt Fencing | 300 | LNFT | 1.00 | 300.00 | 12.00 | 3,600.00 | 10.00 | 3,000.00 | | 0005 | 402-02-00101 | Traffic Maintenance Surfacing (Hard) | 200 | SQYD | 155.00 | 31,000.00 | 150.00 | 30,000.00 | 100.00 | 20,000.00 | | 0006 | 510-01-00100 | Pavement Patching (6" Minimum Thickness) | 40 | SQYD | 210.00 | 8,400.00 | 300.00 | 12,000.00 | 200.00 | 8,000.00 | | 0007 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 160 | SQYD | 210.00 | 33,600.00 | 375.00 | 60,000.00 | 250.00 | 40,000.00 | | 0008 | 511-01-00100 | Saw Cutting Asphalt Concrete Pavement | 1,440 | INLF | 2.75 | 3,960.00 | 2.75 | 3,960.00 | 5.00 | 7,200.00 | | 0009 | 701-01-01007 | Cross Drain Pipe (24" RCP/RPVCP/CPEPDW/CPPPDW) RCP, RPVCP, OR CPPPDW ONLY | 140 | LNFT | 250.00 | 35,000.00 | 300.00 | 42,000.00 | 300.00 | 42,000.00 | | 0010 | 701-01-01045 | Cross Drain Pipe (36" RCP/RPVCP/CPEPDW/CPPPDW/CPPPTW) RCP, RPVCP, OR CPPPDW ONLY | 88 | LNFT | 350.00 | 30,800.00 | 425.00 | 37,400.00 | 500.00 | 44,000.00 | | 0011 | 701-01-01121 | Cross Drain Pipe (60" RCP/CPPPDW/CPPPTW) CPPPDW ONLY | 120 | LNFT | 465.00 | 55,800.00 | 700.00 | 84,000.00 | 900.00 | 108,000.00 | | 0012 | 701-03-01044 | Storm Drain Pipe (24" RCP/RPVCP/CPPPDW) RPVCP OR CPPPDW ONLY | 30 | LNFT | 250.00 | 7,500.00 | 300.00 | 9,000.00 | 300.00 | 9,000.00 | | 0013 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 30 | LNFT | 1.00 | 30.00 | 375.00 | 11,250.00 | 100.00 | 3,000.00 | | 0014 | 702-03-00010 | Catch Basins CB-14 | 1 | EACH | 16,000.00 | 16,000.00 | 28,000.00 | 28,000.00 | 15,000.00 | 15,000.00 | | 0015 | 702-03-00500 | Catch Basins (CB-06) | 1 | EACH | 9,000.00 | 9,000.00 | 15,000.00 | 15,000.00 | 10,000.00 | 10,000.00 | | 0016 | 702-03-00600 | Catch Basins (CB-07) | 1 | EACH | 12,000.00 | 12,000.00 | 17,500.00 | 17,500.00 | 12,000.00 | 12,000.00 | | 0017 | 702-03-00700 | Catch Basins (CB-08) | 2 | EACH | 12,000.00 | 24,000.00 | 23,500.00 | 47,000.00 | 15,000.00 | 30,000.00 | | 0018 | 706-01-00100 | Concrete Walk (4" Thick) | 8.8 | SQYD | 275.00 | 2,420.00 | 350.00 | 3,080.00 | 200.00 | 1,760.00 | | 0019 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 45,000.00 | 45,000.00 | 50,000.00 | 50,000.00 | 125,000.00 | 125,000.00 | | 0020 | 726-01-00100 | Bedding Material | 55 | CUYD | 1.00 | 55.00 | 350.00 | 19,250.00 | 150.00 | 8,250.00 | | 0021 | 727-01-00100 | Mobilization | 1 | LUMP | 75,000.00 | 75,000.00 | 50,000.00 | 50,000.00 | 70,000.00 | 70,000.00 | | 0022 | 729-16-00200 | Object Marker Assembly (Type 2) | 10 | EACH | 150.00 | 1,500.00 | 200.00 | 2,000.00 | 75.00 | 750.00 | | 0023 | 731-02-00100 | Reflectorized Raised Pavement Markers | 5 | EACH | 100.00 | 500.00 | 20.00 | 100.00 | 100.00 | 500.00 | | 0024 | 732-01-01000 | Plastic Pavement Striping (4" Width) (Thermoplastic 90 mil) | 300 | LNFT | 5.00 | 1,500.00 | 18.00 | 5,400.00 | 5.00 | 1,500.00 | | 0025 | 739-01-00100 | Hydro-Seeding | 0.5 | ACRE | 100.00 | 50.00 | 7,000.00 | 3,500.00 | 5,000.00 | 2,500.00 | | 0026 | 740-01-00100 | Construction Layout | 1 | LUMP | 5,000.00 | 5,000.00 | 25,000.00 | 25,000.00 | 10,000.00 | 10,000.00 | | 0027 | NS-713-00009 | Portable Changeable Message Sign (with communications) | 2 | EACH | 125.00 | 250.00 | 500.00 | 1,000.00 | 25,000.00 | 50,000.00 | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 415,505.00 | | 600,920.00 | | 657,340.00 |
|