Proposal:4400032974
Parish:Ascension, Iberville
Description:AREA C: DRAINAGE STRUCTURE REPLACEMENTS
Type Construction:
Estimated Construction Cost:$348,516.00
| Rank | License | Bidder | Construction Bid |
| 1 | 68424 | Procivil, LLC | $329,907.00 |
| 2 | 48896 | Command Construction Industries LLC | $424,271.50 |
| 3 | 28190 | Buck Town Contractors & Co. | $546,474.00 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Procivil, LLC | - 2 - Command Construction Industries LLC | - 3 - Buck Town Contractors & Co. | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 17,500.00 | 17,500.00 | 25,000.00 | 25,000.00 | 14,000.00 | 14,000.00 | | 0002 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 3,500.00 | 3,500.00 | 1.00 | 1.00 | 6,400.00 | 6,400.00 | | 0003 | 204-06-00100 | Temporary Silt Fencing | 300 | LNFT | 1.00 | 300.00 | 5.00 | 1,500.00 | 1.00 | 300.00 | | 0004 | 402-01-00101 | Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 17.7 | CUYD | 100.00 | 1,770.00 | 100.00 | 1,770.00 | 100.00 | 1,770.00 | | 0005 | 402-02-00101 | Traffic Maintenance Surfacing (Hard) | 99 | SQYD | 200.00 | 19,800.00 | 50.00 | 4,950.00 | 600.00 | 59,400.00 | | 0006 | 510-01-00100 | Pavement Patching (6" Minimum Thickness) | 105 | SQYD | 200.00 | 21,000.00 | 200.00 | 21,000.00 | 580.00 | 60,900.00 | | 0007 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 99 | SQYD | 225.00 | 22,275.00 | 250.00 | 24,750.00 | 580.00 | 57,420.00 | | 0008 | 701-01-01007 | Cross Drain Pipe (24" RCP/RPVCP/CPEPDW/CPPPDW) RCP, RPVCP, OR CPPPDW ONLY | 90 | LNFT | 250.00 | 22,500.00 | 400.00 | 36,000.00 | 430.00 | 38,700.00 | | 0009 | 701-01-01121 | Cross Drain Pipe (60" RCP/CPPPDW/CPPPTW) | 132 | LNFT | 650.00 | 85,800.00 | 650.00 | 85,800.00 | 850.00 | 112,200.00 | | 0010 | 701-03-01044 | Storm Drain Pipe (24" RCP/RPVCP/CPPPDW) | 10 | LNFT | 175.00 | 1,750.00 | 300.00 | 3,000.00 | 240.00 | 2,400.00 | | 0011 | 701-05-01068 | Side Drain Pipe (24" RCP/RPVCP/CPEPDW/CPPPDW) | 10 | LNFT | 175.00 | 1,750.00 | 300.00 | 3,000.00 | 240.00 | 2,400.00 | | 0012 | 701-05-02045 | Side Drain Pipe (Erosion) (18" RPVCP/CPEPDW/CPPPDW) | 20 | LNFT | 100.00 | 2,000.00 | 150.00 | 3,000.00 | 140.00 | 2,800.00 | | 0013 | 701-05-02105 | Side Drain Pipe (Erosion) (36" RPVCP/CPEPDW/CPPPDW/CPPPTW) | 20 | LNFT | 225.00 | 4,500.00 | 200.00 | 4,000.00 | 400.00 | 8,000.00 | | 0014 | 701-14-00100 | Cleaning Existing Pipes LA 22 (C.S. 266-01) - Clear Existing 36" Storm Drain | 50 | LNFT | 50.00 | 2,500.00 | 40.00 | 2,000.00 | 115.00 | 5,750.00 | | 0015 | 701-15-00100 | Concrete Collar | 3 | EACH | 1,500.00 | 4,500.00 | 1,000.00 | 3,000.00 | 1,150.00 | 3,450.00 | | 0016 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 150 | LNFT | 1.00 | 150.00 | 0.01 | 1.50 | 12.00 | 1,800.00 | | 0017 | 702-02-00100 | Manholes (MH-06) | 3 | EACH | 6,000.00 | 18,000.00 | 10,000.00 | 30,000.00 | 5,830.00 | 17,490.00 | | 0018 | 702-03-00100 | Catch Basins (CB-01) | 1 | EACH | 5,000.00 | 5,000.00 | 7,500.00 | 7,500.00 | 5,100.00 | 5,100.00 | | 0019 | 702-03-00200 | Catch Basins (CB-02) | 1 | EACH | 6,000.00 | 6,000.00 | 7,500.00 | 7,500.00 | 5,300.00 | 5,300.00 | | 0020 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 30,000.00 | 30,000.00 | 50,000.00 | 50,000.00 | 45,000.00 | 45,000.00 | | 0021 | 726-01-00100 | Bedding Material | 43 | CUYD | 150.00 | 6,450.00 | 125.00 | 5,375.00 | 190.00 | 8,170.00 | | 0022 | 727-01-00100 | Mobilization | 1 | LUMP | 30,000.00 | 30,000.00 | 50,000.00 | 50,000.00 | 55,000.00 | 55,000.00 | | 0023 | 729-16-00200 | Object Marker Assembly (Type 2) | 8 | EACH | 50.00 | 400.00 | 150.00 | 1,200.00 | 150.00 | 1,200.00 | | 0024 | 731-02-00100 | Reflectorized Raised Pavement Markers | 5 | EACH | 150.00 | 750.00 | 100.00 | 500.00 | 50.00 | 250.00 | | 0025 | 732-01-01000 | Plastic Pavement Striping (4" Width) (Thermoplastic 90 mil) | 300 | LNFT | 25.00 | 7,500.00 | 50.00 | 15,000.00 | 13.50 | 4,050.00 | | 0026 | 739-01-00100 | Hydro-Seeding | 0.5 | ACRE | 7,500.00 | 3,750.00 | 9,000.00 | 4,500.00 | 8,200.00 | 4,100.00 | | 0027 | 740-01-00100 | Construction Layout | 1 | LUMP | 1,500.00 | 1,500.00 | 25,000.00 | 25,000.00 | 6,200.00 | 6,200.00 | | 0028 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 1,962 | INLF | 1.00 | 1,962.00 | 2.00 | 3,924.00 | 2.00 | 3,924.00 | | 0029 | NS-713-00009 | Portable Changeable Message Sign (with communications) | 2 | EACH | 3,500.00 | 7,000.00 | 2,500.00 | 5,000.00 | 6,500.00 | 13,000.00 | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 329,907.00 | | 424,271.50 | | 546,474.00 |
|