Bid Tabulations for the Letting of 3/20/2025 in District 61 - Baton Rouge/Tom Drive

Proposal:4400031077a
Parish:East Baton Rouge, Pointe Coupee
Description:DIST 61 NORTH: TREE REMOVAL
Type Construction:
Estimated Construction Cost:$176,413.92
Rank License BidderConstruction Bid
167594Traffic Commander, LLC$220,000.00
246747Triumph Construction, LLC$226,998.00
374077TLP Construction Co. LLC$240,000.00
4C0013Walls Tree Service, LLC$248,475.00
5C0010Southern Style Services LLC$499,750.00


Line
Number
Item NumberItem DescriptionQuantityUnit of
Measure
- 1 -
Traffic Commander, LLC
- 2 -
Triumph Construction, LLC
- 3 -
TLP Construction Co. LLC
- 4 -
Walls Tree Service, LLC
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
0001201-01-00100Clearing and Grubbing 13.09  LUMP50,000.0050,000.0061,610.0061,610.00125,000.00125,000.00101,000.00101,000.00
0002713-01-00100Temporary Signs and Barricades 1     LUMP50,000.0050,000.0033,760.0033,760.0030,000.0030,000.0015,500.0015,500.00
0003727-01-00100Mobilization 1     LUMP35,000.0035,000.0056,950.0056,950.0030,000.0030,000.0020,000.0020,000.00
0004740-01-00100Construction Layout 1     LUMP25,000.0025,000.0010,240.0010,240.0010,500.0010,500.0014,000.0014,000.00
0005NS-201-00001Tree and Stump Removal (<= 36" Diameter) TREE REMOVAL ONLY, STUMPS SHALL BE LEFT NO HIGHER THAN 4” ABOVE GROUND3     EACH5,000.0015,000.004,506.0013,518.002,500.007,500.004,125.0012,375.00
0006NS-201-00002Tree and Stump Removal (Over 36" - 48" Diameter) TREE REMOVAL ONLY, STUMPS SHALL BE LEFT NO HIGHER THAN 4” ABOVE GROUND2     EACH10,000.0020,000.006,440.0012,880.003,500.007,000.005,300.0010,600.00
0007NS-719-00002Tree Trimming 1     LUMP25,000.0025,000.0038,040.0038,040.0030,000.0030,000.0075,000.0075,000.00
             
  CONTRACTOR TOTAL   220,000.00 226,998.00 240,000.00 248,475.00



Line
Number
Item NumberItem DescriptionQuantityUnit of
Measure
- 5 -
Southern Style Services LLC
Unit PriceTotal
Amount
0001201-01-00100Clearing and Grubbing 13.09  LUMP275,000.00275,000.00
0002713-01-00100Temporary Signs and Barricades 1     LUMP50,000.0050,000.00
0003727-01-00100Mobilization 1     LUMP75,000.0075,000.00
0004740-01-00100Construction Layout 1     LUMP25,000.0025,000.00
0005NS-201-00001Tree and Stump Removal (<= 36" Diameter) TREE REMOVAL ONLY, STUMPS SHALL BE LEFT NO HIGHER THAN 4” ABOVE GROUND3     EACH3,750.0011,250.00
0006NS-201-00002Tree and Stump Removal (Over 36" - 48" Diameter) TREE REMOVAL ONLY, STUMPS SHALL BE LEFT NO HIGHER THAN 4” ABOVE GROUND2     EACH4,250.008,500.00
0007NS-719-00002Tree Trimming 1     LUMP55,000.0055,000.00
       
  CONTRACTOR TOTAL   499,750.00