Bid Tabulations for the Letting of 8/8/2017 in District 58 - Chase

Proposal:H.972256.6
Parish:Franklin
Routes:US425
Description:WATERLINE REPLACEMENT: DISTRICT 58 HQ
Type Construction:WATERLINE REPLACEMENT
Estimated Construction Cost:$384,682.00
Rank License BidderConstruction Bid
139512Bihm Construction Company Inc.$330,139.29
254928Womack And Sons Constr. Group Inc$402,068.40
335057Camo Construction Co. Inc.$515,524.00
403683DON M. BARRON CONTRACTOR INC$545,095.00


Line
Number
Item NumberItem DescriptionQuantityUnit of
Measure
- 1 -
Bihm Construction Company Inc.
- 2 -
Womack And Sons Constr. Group Inc
- 3 -
Camo Construction Co. Inc.
- 4 -
DON M. BARRON CONTRACTOR INC
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
0001741-01-01060Water Main (4" PVC) (4" PE)60     LNFT26.971,618.2030.501,830.0041.002,460.0055.003,300.00
0002741-01-01080Water Main (6" PVC) (6" PE)14,308     LNFT18.20260,405.6024.55351,261.4033.00472,164.0033.75482,895.00
0003741-02-00200Gate Valve (4") 1     EACH838.78838.782,000.002,000.001,250.001,250.003,600.003,600.00
0004741-03-00300Tapping Sleeve and Valve Assembly (6") station1     EACH2,375.682,375.683,500.003,500.003,300.003,300.004,600.004,600.00
0005741-10-00100Adjusting Water Service Lines 50     LNFT120.006,000.0050.002,500.0062.003,100.0068.003,400.00
0006741-18-00001Valve Box 1     EACH37,052.0537,052.0525,306.0025,306.0019,750.0019,750.0030,600.0030,600.00
0007821-06-00200Facility Mechanical Systems (Plumbing Systems) 1     LUMP21,848.9821,848.9815,671.0015,671.0013,500.0013,500.0016,700.0016,700.00
             
  CONTRACTOR TOTAL   330,139.29 402,068.40 515,524.00 545,095.00