Proposal:H.016988.6
Parish:Lafourche
Routes:LA 308
Description:LA 308: DRAINAGE CANAL NEAR MCCLOUD RD
Type Construction:CLEARING AND GRUBBING, REMOVAL OF PRECAST CONCRETE SLAB SPAN BRIDGE, GRADING, SUBGRADE TREATMENT, CLASS II BASE COURSE, ASPHALT CONCRETE PAVEMENT, PAVEMENT PATCHING, PRECAST CONCRETE PILES, CONCRETE SLAB SPAN BRIDGE, AND RELATED WORK.
Estimated Construction Cost:$5,525,968.82
Maximum Number of Days Allowed for Construction:220
Calculated Daily User Cost:$20,000.00
| Rank | License | Bidder | Construction Bid | Bidder's Proposed Contract Time | Total Bid |
| 1 | 34567 | James Construction Group LLC | $5,132,237.10 | 213.00 | $9,392,237.10 |
| 2 | 39462 | JB JAMES CONSTRUCTION LLC | $6,071,048.60 | 220.00 | $10,471,048.60 |
| 3 | 44187 | RNGD Construction LLC | $7,496,620.68 | 220.00 | $11,896,620.68 |
| 4 | 00009 | Coastal Contractors, LLC | $8,782,241.40 | 220.00 | $13,182,241.40 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - James Construction Group LLC | - 2 - JB JAMES CONSTRUCTION LLC | - 3 - RNGD Construction LLC | - 4 - Coastal Contractors, LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 2.57 | LUMP | 150,000.00 | 150,000.00 | 300,000.00 | 300,000.00 | 100,000.00 | 100,000.00 | 200,000.00 | 200,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 50,000.00 | 50,000.00 | 15,000.00 | 15,000.00 | 500.00 | 500.00 | 90,000.00 | 90,000.00 | | 0003 | 202-02-03030 | Removal of Pavement Structure | 5,675.1 | SQYD | 17.00 | 96,476.70 | 18.00 | 102,151.80 | 12.00 | 68,101.20 | 35.00 | 198,628.50 | | 0004 | 202-02-04501 | Removal of Bridge Recall No. 001100, 114'x28.6', Lightweight Concrete Precast Slab Units | 3,261 | LUMP | 100,000.00 | 100,000.00 | 300,000.00 | 300,000.00 | 500,000.00 | 500,000.00 | 350,000.00 | 350,000.00 | | 0005 | 203-01-00100 | General Excavation | 3,363 | CUYD | 22.00 | 73,986.00 | 50.00 | 168,150.00 | 40.00 | 134,520.00 | 53.00 | 178,239.00 | | 0006 | 203-02-00100 | Drainage Excavation | 919 | CUYD | 30.00 | 27,570.00 | 40.00 | 36,760.00 | 40.00 | 36,760.00 | 91.00 | 83,629.00 | | 0008 | 203-11-00100 | Settlement Plate Installation and Monitoring | 5 | EACH | 2,500.00 | 12,500.00 | 3,000.00 | 15,000.00 | 40,000.00 | 200,000.00 | 5,500.00 | 27,500.00 | | 0009 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 3 | EACH | 175.00 | 525.00 | 160.00 | 480.00 | 300.00 | 900.00 | 263.00 | 789.00 | | 0010 | 204-06-00100 | Temporary Silt Fencing | 3,620 | LNFT | 2.50 | 9,050.00 | 8.00 | 28,960.00 | 6.00 | 21,720.00 | 4.00 | 14,480.00 | | 0013 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 134 | CUYD | 200.00 | 26,800.00 | 200.00 | 26,800.00 | 200.00 | 26,800.00 | 350.00 | 46,900.00 | | 0014 | 402-01-00101 | Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 2.7 | CUYD | 650.00 | 1,755.00 | 600.00 | 1,620.00 | 1,000.00 | 2,700.00 | 400.00 | 1,080.00 | | 0015 | 502-01-00100 | Asphalt Concrete | 2,303.4 | TON | 160.00 | 368,544.00 | 167.00 | 384,667.80 | 175.00 | 403,095.00 | 260.00 | 598,884.00 | | 0016 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 377.3 | TON | 265.00 | 99,984.50 | 225.00 | 84,892.50 | 300.00 | 113,190.00 | 430.00 | 162,239.00 | | 0017 | 510-01-00001 | Pavement Patching 10.5" Minimum Thickness | 76 | SQYD | 155.00 | 11,780.00 | 315.00 | 23,940.00 | 300.00 | 22,800.00 | 315.00 | 23,940.00 | | 0018 | 511-01-00100 | Saw Cutting Asphalt Concrete Pavement | 556 | INLF | 1.00 | 556.00 | 1.00 | 556.00 | 1.00 | 556.00 | 1.00 | 556.00 | | 0019 | 511-03-00100 | Sawing and Sealing Transverse Joints in Asphalt Concrete Overlay | 180 | LNFT | 33.00 | 5,940.00 | 33.00 | 5,940.00 | 40.00 | 7,200.00 | 25.00 | 4,500.00 | | 0020 | 511-04-00100 | Sawcuts in Asphalt Concrete Lifts | 300 | LNFT | 4.50 | 1,350.00 | 4.50 | 1,350.00 | 25.00 | 7,500.00 | 2.00 | 600.00 | | 0021 | 701-05-02046 | Side Drain Pipe (Erosion) (18" RPVCP) | 200 | LNFT | 90.00 | 18,000.00 | 150.00 | 30,000.00 | 150.00 | 30,000.00 | 180.00 | 36,000.00 | | 0022 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 50 | LNFT | 5.00 | 250.00 | 1.00 | 50.00 | 0.01 | 0.50 | 150.00 | 7,500.00 | | 0023 | 702-08-00100 | Side Drain Safety End (Type 1) | 1 | EACH | 6,500.00 | 6,500.00 | 8,000.00 | 8,000.00 | 7,500.00 | 7,500.00 | 8,100.00 | 8,100.00 | | 0024 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 362.5 | LNFT | 20.00 | 7,250.00 | 20.00 | 7,250.00 | 25.00 | 9,062.50 | 25.00 | 9,062.50 | | 0025 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 100 | LNFT | 85.00 | 8,500.00 | 85.00 | 8,500.00 | 100.00 | 10,000.00 | 110.00 | 11,000.00 | | 0026 | 704-10-00310 | Guard Rail End Treatment, NCHRP 350 - 31" (TL-3 Flared) | 4 | EACH | 3,500.00 | 14,000.00 | 3,500.00 | 14,000.00 | 4,500.00 | 18,000.00 | 3,800.00 | 15,200.00 | | 0027 | 708-01-00100 | Right-of-Way Monument | 14 | EACH | 650.00 | 9,100.00 | 650.00 | 9,100.00 | 650.00 | 9,100.00 | 1,000.00 | 14,000.00 | | 0028 | 708-02-00100 | Right-of-Way Monument Witness Post | 14 | EACH | 200.00 | 2,800.00 | 200.00 | 2,800.00 | 500.00 | 7,000.00 | 325.00 | 4,550.00 | | 0029 | 711-01-04000 | Riprap (55 lb, 18" Thick) | 358 | SQYD | 230.00 | 82,340.00 | 160.00 | 57,280.00 | 125.00 | 44,750.00 | 158.00 | 56,564.00 | | 0030 | 711-04-00100 | Geotextile Fabric | 358 | SQYD | 2.50 | 895.00 | 4.00 | 1,432.00 | 1.00 | 358.00 | 8.00 | 2,864.00 | | 0031 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 20,000.00 | 20,000.00 | 60,000.00 | 60,000.00 | 125,000.00 | 125,000.00 | 65,000.00 | 65,000.00 | | 0032 | 713-03-02020 | Temporary Pavement Markings (Broken Line) (4" W) (10' L) (Type 1 Removable) | 0.204 | MILE | 4,000.00 | 816.00 | 4,000.00 | 816.00 | 4,500.00 | 918.00 | 6,000.00 | 1,224.00 | | 0033 | 713-04-01020 | Temporary Pavement Markings (Solid Line) (4"Width) (Type 1 Removable) | 1.287 | MILE | 12,500.00 | 16,087.50 | 12,000.00 | 15,444.00 | 15,000.00 | 19,305.00 | 13,000.00 | 16,731.00 | | 0034 | 713-06-00100 | Temporary Reflectorized Raised Pavement Markers | 74 | EACH | 8.00 | 592.00 | 8.00 | 592.00 | 9.00 | 666.00 | 12.00 | 888.00 | | 0035 | 713-11-00100 | Portable Changeable Message Signs | 3 | EACH | 20,000.00 | 60,000.00 | 12,000.00 | 36,000.00 | 40,000.00 | 120,000.00 | 25,000.00 | 75,000.00 | | 0036 | 720-01-01000 | Erosion Control System (Slope Protection) (Type A) | 404 | SQYD | 3.00 | 1,212.00 | 1.50 | 606.00 | 2.00 | 808.00 | 2.00 | 808.00 | | 0037 | 724-01-00100 | Rumble Strips (Centerline) | 0.327 | MILE | 300.00 | 98.10 | 300.00 | 98.10 | 325.00 | 106.28 | 7,000.00 | 2,289.00 | | 0038 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 0.656 | MILE | 300.00 | 196.80 | 300.00 | 196.80 | 325.00 | 213.20 | 6,700.00 | 4,395.20 | | 0039 | 727-01-00100 | Mobilization | 1 | LUMP | 513,000.00 | 513,000.00 | 600,000.00 | 600,000.00 | 740,000.00 | 740,000.00 | 873,000.00 | 873,000.00 | | 0040 | 729-01-00100 | Sign (Type A) | 13.5 | SQFT | 25.00 | 337.50 | 25.00 | 337.50 | 30.00 | 405.00 | 30.00 | 405.00 | | 0041 | 729-01-00200 | Mounting of Sign (Type A) | 4 | EACH | 25.00 | 100.00 | 25.00 | 100.00 | 30.00 | 120.00 | 30.00 | 120.00 | | 0042 | 729-16-00300 | Object Marker Assembly (Type 3) | 4 | EACH | 100.00 | 400.00 | 100.00 | 400.00 | 125.00 | 500.00 | 125.00 | 500.00 | | 0043 | 729-22-00100 | Perforated Square Tubing Post with 2-1/4" Anchor | 2 | EACH | 150.00 | 300.00 | 150.00 | 300.00 | 175.00 | 350.00 | 200.00 | 400.00 | | 0044 | 731-01-00100 | Nonreflectorized Raised Pavement Markers | 618 | EACH | 15.00 | 9,270.00 | 15.00 | 9,270.00 | 17.00 | 10,506.00 | 20.00 | 12,360.00 | | 0045 | 731-02-00100 | Reflectorized Raised Pavement Markers | 74 | EACH | 8.00 | 592.00 | 8.00 | 592.00 | 10.00 | 740.00 | 15.00 | 1,110.00 | | 0046 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 1.287 | MILE | 6,000.00 | 7,722.00 | 6,000.00 | 7,722.00 | 7,000.00 | 9,009.00 | 8,000.00 | 10,296.00 | | 0047 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 0.204 | MILE | 1,500.00 | 306.00 | 1,500.00 | 306.00 | 1,750.00 | 357.00 | 2,000.00 | 408.00 | | 0048 | 739-01-00100 | Hydro-Seeding | 1.71 | ACRE | 2,800.00 | 4,788.00 | 3,200.00 | 5,472.00 | 4,000.00 | 6,840.00 | 4,000.00 | 6,840.00 | | 0049 | 740-01-00100 | Construction Layout | 1 | LUMP | 60,000.00 | 60,000.00 | 60,000.00 | 60,000.00 | 150,000.00 | 150,000.00 | 100,000.00 | 100,000.00 | | 0050 | 804-01-00600 | Precast Concrete Piles (24") | 3,900 | LNFT | 205.00 | 799,500.00 | 300.00 | 1,170,000.00 | 371.00 | 1,446,900.00 | 438.00 | 1,708,200.00 | | 0051 | 804-14-00100 | Dynamic Monitoring Assistance | 10 | EACH | 2,250.00 | 22,500.00 | 1,000.00 | 10,000.00 | 20,000.00 | 200,000.00 | 4,100.00 | 41,000.00 | | 0052 | 804-17-00100 | Construction Site Survey | 1 | LUMP | 13,464.00 | 13,464.00 | 30,000.00 | 30,000.00 | 25,000.00 | 25,000.00 | 20,000.00 | 20,000.00 | | 0053 | 805-01-00100 | Class A1 Concrete (Slab Span) | 238.64 | CUYD | 2,300.00 | 548,872.00 | 2,000.00 | 477,280.00 | 2,250.00 | 536,940.00 | 3,500.00 | 835,240.00 | | 0054 | 805-01-00300 | Class A1 Concrete (Bent Cap) | 86.76 | CUYD | 4,000.00 | 347,040.00 | 3,000.00 | 260,280.00 | 2,900.00 | 251,604.00 | 5,000.00 | 433,800.00 | | 0055 | 805-18-00100 | Concrete Finish (Class 2 Rubbed Finish) | 2,151 | SQFT | 2.00 | 4,302.00 | 2.10 | 4,517.10 | 2.00 | 4,302.00 | 4.00 | 8,604.00 | | 0056 | 805-18-00200 | Concrete Finish (Class 3 Special Finish) | 2,151 | SQFT | 4.00 | 8,604.00 | 4.00 | 8,604.00 | 3.00 | 6,453.00 | 5.00 | 10,755.00 | | 0057 | 806-01-00100 | Deformed Reinforcing Steel | 67,360 | LB | 2.00 | 134,720.00 | 1.90 | 127,984.00 | 2.00 | 134,720.00 | 2.00 | 134,720.00 | | 0058 | 810-01-00120 | Concrete Bridge Railing (36 inch Height) | 320 | LNFT | 230.00 | 73,600.00 | 290.00 | 92,800.00 | 200.00 | 64,000.00 | 250.00 | 80,000.00 | | 0059 | 813-01-00100 | Concrete Approach Slabs (Cast-in-Place) | 2,400 | SQFT | 115.00 | 276,000.00 | 130.00 | 312,000.00 | 125.00 | 300,000.00 | 125.00 | 300,000.00 | | 0060 | 814-01-00100 | Elastomeric Bearing Pads (Non-Reinforced) | 192 | SFIN | 110.00 | 21,120.00 | 145.00 | 27,840.00 | 150.00 | 28,800.00 | 115.00 | 22,080.00 | | 0061 | 815-03-00300 | Joint Seal (Poured) | 270 | LNFT | 23.00 | 6,210.00 | 27.00 | 7,290.00 | 25.00 | 6,750.00 | 30.00 | 8,100.00 | | 0062 | 203-04-00200 | Nonplastic Embankment (Sand) | 5,946 | CUYD | 90.00 | 535,140.00 | 80.00 | 475,680.00 | 125.00 | 743,250.00 | 138.00 | 820,548.00 | | 0063 | 203-08-00100 | Geotextile Fabric | 12,752 | SQYD | 2.00 | 25,504.00 | 3.00 | 38,256.00 | 2.00 | 25,504.00 | 8.00 | 102,016.00 | | 0064 | 302-02-12070 | Class II Base Course (12" Thick) (Crushed Stone or Recycled Portland Cement Concrete) | 5,836.2 | SQYD | 55.00 | 320,991.00 | 75.00 | 437,715.00 | 55.00 | 320,991.00 | 116.00 | 676,999.20 | | 0065 | 703-03-00100 | Perforated Pipe Underdrains | 170 | LNFT | 30.00 | 5,100.00 | 44.00 | 7,480.00 | 60.00 | 10,200.00 | 40.00 | 6,800.00 | | 0066 | 703-04-00100 | Nonperforated Pipe Underdrains | 85 | LNFT | 30.00 | 2,550.00 | 44.00 | 3,740.00 | 50.00 | 4,250.00 | 40.00 | 3,400.00 | | 0067 | NS-203-00014 | Wick Drains | 209,500 | LNFT | 0.50 | 104,750.00 | 0.70 | 146,650.00 | 2.00 | 419,000.00 | 1.20 | 251,400.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 5,132,237.10 | | 6,071,048.60 | | 7,496,620.68 | | 8,782,241.40 |
|