Proposal:H.016681.6
Parish:Lincoln, Ouachita, Union
Routes:LA 33, LA 34, US 165, US 80
Description:D05 SA ENHANCED PAVEMENT MARKINGS PH 1
Type Construction:STRIPING, PAVEMENT MARKINGS, AND RELATED WORK.
Estimated Construction Cost:$2,590,853.09
| Rank | License | Bidder | Construction Bid |
| 1 | 24518 | HIGHWAY GRAPHICS LLC | $1,885,127.40 |
| 2 | 06799 | Pavement Markings, LLC | $4,797,688.22 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - HIGHWAY GRAPHICS LLC | - 2 - Pavement Markings, LLC | | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 45,000.00 | 45,000.00 | 150,000.00 | 150,000.00 | | 0002 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 0.15 | MILE | 1.00 | 0.15 | 100.00 | 15.00 | | 0003 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 3.138 | MILE | 1,500.00 | 4,707.00 | 100.00 | 313.80 | | 0004 | 727-01-00100 | Mobilization | 1 | LUMP | 45,000.00 | 45,000.00 | 500,000.00 | 500,000.00 | | 0005 | 731-01-00100 | Nonreflectorized Raised Pavement Markers | 20 | EACH | 35.00 | 700.00 | 20.00 | 400.00 | | 0006 | 731-02-00100 | Reflectorized Raised Pavement Markers | 3,736 | EACH | 8.00 | 29,888.00 | 10.00 | 37,360.00 | | 0007 | 732-01-01060 | Plastic Pavement Striping (12" Width) (Thermoplastic 90 mil) | 85 | LNFT | 25.00 | 2,125.00 | 14.00 | 1,190.00 | | 0008 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 2,114.69 | LNFT | 25.00 | 52,867.25 | 18.00 | 38,064.42 | | 0009 | 732-01-03060 | Plastic Pavement Striping (12" Width) (Preformed Tape) (DOTD Intersection Grade) | 4,119 | LNFT | 25.00 | 102,975.00 | 14.00 | 57,666.00 | | 0010 | 732-01-03080 | Plastic Pavement Striping (24" Width) (Preformed Tape) (DOTD Intersection Grade) | 188 | LNFT | 45.00 | 8,460.00 | 28.00 | 5,264.00 | | 0011 | 732-02-02020 | Plastic Pavement Striping (Solid Line) (6" Width) (Thermoplastic 90 mil) | 20.398 | MILE | 7,500.00 | 152,985.00 | 30,000.00 | 611,940.00 | | 0012 | 732-02-03020 | Plastic Pavement Striping (Solid Line) (6" Width) (Preformed Tape) (Retroreflectivity Level I) | 46.131 | MILE | 22,000.00 | 1,014,882.00 | 60,000.00 | 2,767,860.00 | | 0013 | 732-03-02020 | Plastic Pavement Striping (Broken Line) (6" Width) (Thermoplastic 90 mil) | 6.014 | MILE | 3,500.00 | 21,049.00 | 10,000.00 | 60,140.00 | | 0014 | 732-03-03020 | Plastic Pavement Striping (Broken Line) (6" Width) (Preformed Tape) (Retroreflectivity Level I) | 15.994 | MILE | 6,000.00 | 95,964.00 | 20,000.00 | 319,880.00 | | 0015 | 732-03-03035 | Plastic Pavement Striping (Dotted Line) (12" Width)(2' Length)(Preformed Tape) (Retroreflectivity Level I) | 1.149 | MILE | 35,000.00 | 40,215.00 | 15,000.00 | 17,235.00 | | 0016 | 732-03-04021 | Plastic Pav't Striping (Broken) (9" Width) (Pref Tape) (Retroreflectivity Level I) (Black and White Contrast) | 3.332 | MILE | 20,000.00 | 66,640.00 | 35,000.00 | 116,620.00 | | 0017 | 732-04-01040 | Plastic Pavement Legends and Symbols (Arrow - Double) | 4 | EACH | 500.00 | 2,000.00 | 300.00 | 1,200.00 | | 0018 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 54 | EACH | 450.00 | 24,300.00 | 300.00 | 16,200.00 | | 0019 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 22 | EACH | 450.00 | 9,900.00 | 300.00 | 6,600.00 | | 0020 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 31 | EACH | 650.00 | 20,150.00 | 300.00 | 9,300.00 | | 0021 | 732-04-18000 | Plastic Pavement Legends and Symbols (RR Crossing) | 8 | EACH | 1,500.00 | 12,000.00 | 500.00 | 4,000.00 | | 0022 | 732-05-00100 | Removal of Existing Markings | 3.288 | MILE | 15,000.00 | 49,320.00 | 5,000.00 | 16,440.00 | | 0023 | 740-01-00100 | Construction Layout | 1 | LUMP | 45,000.00 | 45,000.00 | 5,000.00 | 5,000.00 | | 0024 | NS-713-00009 | Portable Changeable Message Sign (with communications) | 12 | EACH | 2,000.00 | 24,000.00 | 2,500.00 | 30,000.00 | | 0025 | NS-732-00003 | Debris Removal and Sweeping | 1 | LUMP | 15,000.00 | 15,000.00 | 25,000.00 | 25,000.00 | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 1,885,127.40 | | 4,797,688.22 |
|