Proposal:H.016377.6
Parish:Caldwell
Routes:LA 126
Description:LA 126: WINN PARISH LINE - CASTOR CREEK
Type Construction:CLEARING AND GRUBBING, MILLING ASPHALT CONCRETE, PAVEMENT PATCHING, PAVEMENT WIDENING, DRAINAGE STRUCTURES, ASPHALT CONCRETE OVERLAY, REINFORCED PAVING MAT FOR ASPHALT CONCRETE OVERLAY, AND RELATED WORK.
Estimated Construction Cost:$4,285,893.53
| Rank | License | Bidder | Construction Bid |
| 1 | 12487 | Diamond B Construction Co., L.L.C. | $3,840,643.85 |
| 2 | 12312 | Gilchrist Construction Company, LLC | $4,198,722.50 |
| 3 | 05789 | D & J CONSTRUCTION CO., LLC | $6,225,603.30 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Diamond B Construction Co., L.L.C. | - 2 - Gilchrist Construction Company, LLC | - 3 - D & J CONSTRUCTION CO., LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00200 | Clearing and Grubbing (Selective) | 10 | LUMP | 78,000.00 | 78,000.00 | 135,000.00 | 135,000.00 | 200,000.00 | 200,000.00 | | 0002 | 202-02-06040 | Removal of Concrete Box Headwall 13' Length (4) and 6' Length (3) | 7 | EACH | 5,000.00 | 35,000.00 | 2,800.00 | 19,600.00 | 5,000.00 | 35,000.00 | | 0003 | 202-02-14500 | Removal of Guard Rail | 120 | LNFT | 14.00 | 1,680.00 | 14.00 | 1,680.00 | 40.00 | 4,800.00 | | 0004 | 202-02-32100 | Removal of Pipe (Cross Drain) 24" RCP, 30" RCP, 36" RCP | 119 | LNFT | 25.00 | 2,975.00 | 70.00 | 8,330.00 | 60.00 | 7,140.00 | | 0005 | 203-07-00100 | Borrow (Vehicular Measurement) | 36 | CUYD | 35.00 | 1,260.00 | 60.00 | 2,160.00 | 40.00 | 1,440.00 | | 0006 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 1,755 | CUYD | 114.00 | 200,070.00 | 80.00 | 140,400.00 | 95.00 | 166,725.00 | | 0007 | 502-01-00100 | Asphalt Concrete | 9,512.6 | TON | 150.00 | 1,426,890.00 | 160.00 | 1,522,016.00 | 215.00 | 2,045,209.00 | | 0008 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 476.9 | TON | 300.00 | 143,070.00 | 320.00 | 152,608.00 | 300.00 | 143,070.00 | | 0009 | 509-01-00100 | Milling Asphalt Pavement | 84,457 | SQYD | 3.15 | 266,039.55 | 3.50 | 295,599.50 | 5.00 | 422,285.00 | | 0010 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -1,235 | CUYD | 1.00 | -1,235.00 | 1.00 | -1,235.00 | 1.00 | -1,235.00 | | 0012 | 510-02-00100 | Pavement Widening 12" THICKNESS | 1,006.5 | SQYD | 290.00 | 291,885.00 | 160.00 | 161,040.00 | 280.00 | 281,820.00 | | 0013 | 602-10-00100 | Longitudinal Shoulder Joints | 2,279 | LNFT | 9.00 | 20,511.00 | 9.00 | 20,511.00 | 10.00 | 22,790.00 | | 0014 | 701-01-01004 | Cross Drain Pipe (24" RCP/RPVCP) | 88 | LNFT | 350.00 | 30,800.00 | 280.00 | 24,640.00 | 600.00 | 52,800.00 | | 0015 | 701-10-01060 | Reinforced Concrete Pipe (Extension) (24") | 16 | LNFT | 350.00 | 5,600.00 | 320.00 | 5,120.00 | 500.00 | 8,000.00 | | 0016 | 701-10-01080 | Reinforced Concrete Pipe (Extension) (30") | 16 | LNFT | 400.00 | 6,400.00 | 355.00 | 5,680.00 | 550.00 | 8,800.00 | | 0017 | 701-10-01100 | Reinforced Concrete Pipe (Extension) (36") | 16 | LNFT | 450.00 | 7,200.00 | 405.00 | 6,480.00 | 650.00 | 10,400.00 | | 0018 | 701-15-00100 | Concrete Collar | 6 | EACH | 2,250.00 | 13,500.00 | 3,200.00 | 19,200.00 | 1,800.00 | 10,800.00 | | 0019 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 87.5 | LNFT | 36.00 | 3,150.00 | 39.00 | 3,412.50 | 45.00 | 3,937.50 | | 0020 | 704-06-00200 | Guard Rail Bridge Attachments (Single Thrie Beam) | 25 | LNFT | 85.00 | 2,125.00 | 91.00 | 2,275.00 | 175.00 | 4,375.00 | | 0021 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 50 | LNFT | 135.00 | 6,750.00 | 146.00 | 7,300.00 | 115.00 | 5,750.00 | | 0022 | 704-10-00205 | Guard Rail End Treatment, MASH, (TL-3 Tangent) | 2 | EACH | 4,150.00 | 8,300.00 | 4,300.00 | 8,600.00 | 5,000.00 | 10,000.00 | | 0023 | 707-04-00100 | Asphalt Concrete Curb | 27 | LNFT | 95.00 | 2,565.00 | 146.00 | 3,942.00 | 100.00 | 2,700.00 | | 0024 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 50,000.00 | 50,000.00 | 49,000.00 | 49,000.00 | 300,000.00 | 300,000.00 | | 0025 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 7.242 | MILE | 150.00 | 1,086.30 | 200.00 | 1,448.40 | 300.00 | 2,172.60 | | 0026 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 1.012 | MILE | 600.00 | 607.20 | 700.00 | 708.40 | 800.00 | 809.60 | | 0027 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 27.834 | MILE | 900.00 | 25,050.60 | 900.00 | 25,050.60 | 900.00 | 25,050.60 | | 0028 | 726-01-00100 | Bedding Material | 66.5 | CUYD | 185.00 | 12,302.50 | 230.00 | 15,295.00 | 200.00 | 13,300.00 | | 0029 | 727-01-00100 | Mobilization | 1 | LUMP | 179,000.00 | 179,000.00 | 400,000.00 | 400,000.00 | 600,000.00 | 600,000.00 | | 0030 | 729-16-00200 | Object Marker Assembly (Type 2) | 22 | EACH | 115.00 | 2,530.00 | 120.00 | 2,640.00 | 130.00 | 2,860.00 | | 0031 | 729-16-00300 | Object Marker Assembly (Type 3) | 2 | EACH | 135.00 | 270.00 | 140.00 | 280.00 | 160.00 | 320.00 | | 0032 | 731-02-00100 | Reflectorized Raised Pavement Markers | 1,780 | EACH | 5.00 | 8,900.00 | 5.00 | 8,900.00 | 8.00 | 14,240.00 | | 0033 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 27.834 | MILE | 4,800.00 | 133,603.20 | 4,900.00 | 136,386.60 | 6,500.00 | 180,921.00 | | 0034 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 1.012 | MILE | 1,100.00 | 1,113.20 | 1,300.00 | 1,315.60 | 3,000.00 | 3,036.00 | | 0035 | 732-03-02010 | Plastic Pavement Striping (Dotted Line)(4" W)(2' L)(Thermo 90 mil) | 0.139 | MILE | 8,000.00 | 1,112.00 | 7,500.00 | 1,042.50 | 10,000.00 | 1,390.00 | | 0036 | 732-05-00100 | Removal of Existing Markings | 0.047 | MILE | 9,000.00 | 423.00 | 10,000.00 | 470.00 | 20,000.00 | 940.00 | | 0037 | 735-01-00100 | Mailboxes | 17 | EACH | 35.00 | 595.00 | 50.00 | 850.00 | 30.00 | 510.00 | | 0038 | 735-02-00100 | Mailbox Supports (Single) | 11 | EACH | 275.00 | 3,025.00 | 250.00 | 2,750.00 | 300.00 | 3,300.00 | | 0039 | 735-03-00100 | Mailbox Supports (Double) | 3 | EACH | 350.00 | 1,050.00 | 300.00 | 900.00 | 400.00 | 1,200.00 | | 0040 | 739-01-00100 | Hydro-Seeding | 0.29 | ACRE | 5,250.00 | 1,522.50 | 10,500.00 | 3,045.00 | 6,000.00 | 1,740.00 | | 0041 | 740-01-00100 | Construction Layout | 1 | LUMP | 12,000.00 | 12,000.00 | 20,000.00 | 20,000.00 | 100,000.00 | 100,000.00 | | 0042 | 805-16-00200 | Reinforced Concrete Box Culverts (Extension) (5' x 4') | 48 | LNFT | 1,850.00 | 88,800.00 | 2,800.00 | 134,400.00 | 1,000.00 | 48,000.00 | | 0043 | 805-16-02700 | Reinforced Concrete Box Culverts (Extension) 3'x4' | 18 | LNFT | 1,500.00 | 27,000.00 | 2,800.00 | 50,400.00 | 1,000.00 | 18,000.00 | | 0044 | NS-502-04200 | Reinforced Paving Mat for Asphalt Concrete Overlay | 84,457 | SQYD | 3.90 | 329,382.30 | 4.80 | 405,393.60 | 9.00 | 760,113.00 | | 0045 | NS-502-04210 | Asphalt Tack Coat | 20,274 | GAL | 5.75 | 116,575.50 | 4.70 | 95,287.80 | 11.00 | 223,014.00 | | 0046 | 510-01-00300 | Pavement Patching (18" Minimum Thickness) | 1,328 | SQYD | 220.00 | 292,160.00 | 225.00 | 298,800.00 | 360.00 | 478,080.00 | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 3,840,643.85 | | 4,198,722.50 | | 6,225,603.30 |
|