| Rank | License | Bidder | Construction Bid |
| 1 | 52306 | SIEMA CONSTRUCTION, LLC | $2,453,110.25 |
| 2 | 12487 | Diamond B Construction Co., L.L.C. | $2,599,437.50 |
| 3 | 40312 | GRAY CONSTRUCTION CORP. | $2,619,332.62 |
| 4 | 01516 | Elevate Heavy Civil Construction, LLC | $2,623,000.00 |
| 5 | 28190 | Buck Town Contractors & Co. | $2,917,651.20 |
| 6 | 00044 | Guinn Construction, LLC | $2,960,380.80 |
| 7 | 00009 | Coastal Contractors, LLC | $3,148,051.85 |
| 8 | 39462 | JB JAMES CONSTRUCTION LLC | $3,247,867.80 |
| 9 | 48896 | Command Construction Industries LLC | $3,341,558.75 |
| 10 | 12312 | Gilchrist Construction Company, LLC | $3,350,231.55 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - SIEMA CONSTRUCTION, LLC | - 2 - Diamond B Construction Co., L.L.C. | - 3 - GRAY CONSTRUCTION CORP. | - 4 - Elevate Heavy Civil Construction, LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 16,600.00 | 16,600.00 | 45,000.00 | 45,000.00 | 70,000.00 | 70,000.00 | 50,000.00 | 50,000.00 | | 0002 | 202-02-00010 | Removal of Removal of Mailboxes | 1 | EACH | 170.00 | 170.00 | 750.00 | 750.00 | 39.00 | 39.00 | 100.00 | 100.00 | | 0003 | 202-02-03030 | Removal of Pavement Structure | 1,870.1 | SQYD | 15.00 | 28,051.50 | 9.00 | 16,830.90 | 16.00 | 29,921.60 | 12.00 | 22,441.20 | | 0004 | 202-02-04501 | Removal of Bridge Bridge Str. No. 611730411905721 (27.4' Wide x 76' Long LWPCSS) | 1 | LUMP | 20,000.00 | 20,000.00 | 40,000.00 | 40,000.00 | 56,000.00 | 56,000.00 | 50,000.00 | 50,000.00 | | 0005 | 202-02-04501 | Removal of Bridge Bridge Str. No. 617730411905951 (31' Wide x 78' Long COPCSS) | 1 | LUMP | 24,000.00 | 24,000.00 | 40,000.00 | 40,000.00 | 56,000.00 | 56,000.00 | 50,000.00 | 50,000.00 | | 0006 | 202-02-06100 | Removal of Concrete Walks and Drives | 30 | SQYD | 25.00 | 750.00 | 175.00 | 5,250.00 | 30.00 | 900.00 | 88.00 | 2,640.00 | | 0007 | 202-02-32120 | Removal of Pipe (Side Drain) (Side Drain)(24" CMP, 24" CPP, 30" CPP) | 63 | LNFT | 48.00 | 3,024.00 | 25.00 | 1,575.00 | 22.00 | 1,386.00 | 30.00 | 1,890.00 | | 0008 | 203-02-00100 | Drainage Excavation | 853 | CUYD | 37.00 | 31,561.00 | 25.00 | 21,325.00 | 35.00 | 29,855.00 | 24.00 | 20,472.00 | | 0009 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 43,000.00 | 43,000.00 | 40,000.00 | 40,000.00 | 52,000.00 | 52,000.00 | 44,000.00 | 44,000.00 | | 0010 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 8 | EACH | 166.00 | 1,328.00 | 175.00 | 1,400.00 | 140.00 | 1,120.00 | 175.00 | 1,400.00 | | 0011 | 204-06-00100 | Temporary Silt Fencing | 2,115 | LNFT | 3.00 | 6,345.00 | 2.50 | 5,287.50 | 2.60 | 5,499.00 | 2.59 | 5,477.85 | | 0012 | 302-02-08520 | Class II Base Course (8-1/2" Thick) (Crushed Stone) | 2,639.1 | SQYD | 42.00 | 110,842.20 | 72.00 | 190,015.20 | 55.00 | 145,150.50 | 52.00 | 137,233.20 | | 0013 | 302-03-00100 | Base Drain Outlet | 8 | EACH | 1,046.00 | 8,368.00 | 750.00 | 6,000.00 | 361.00 | 2,888.00 | 550.00 | 4,400.00 | | 0014 | 304-01-00100 | Lime | 35.28 | TON | 340.00 | 11,995.20 | 395.00 | 13,935.60 | 417.20 | 14,718.82 | 200.00 | 7,056.00 | | 0015 | 304-05-00100 | Lime Treatment (Type E) | 2,639 | SQYD | 6.00 | 15,834.00 | 3.55 | 9,368.45 | 9.00 | 23,751.00 | 5.00 | 13,195.00 | | 0016 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 14 | CUYD | 208.00 | 2,912.00 | 255.00 | 3,570.00 | 315.00 | 4,410.00 | 331.00 | 4,634.00 | | 0017 | 402-01-00101 | Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 100 | CUYD | 101.00 | 10,100.00 | 35.00 | 3,500.00 | 150.00 | 15,000.00 | 100.00 | 10,000.00 | | 0018 | 502-01-00100 | Asphalt Concrete | 383.2 | TON | 175.00 | 67,060.00 | 200.00 | 76,640.00 | 200.00 | 76,640.00 | 200.00 | 76,640.00 | | 0019 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 173 | TON | 175.00 | 30,275.00 | 200.00 | 34,600.00 | 200.00 | 34,600.00 | 200.00 | 34,600.00 | | 0020 | 511-01-00100 | Saw Cutting Asphalt Concrete Pavement | 405 | INLF | 4.00 | 1,620.00 | 5.00 | 2,025.00 | 2.50 | 1,012.50 | 2.00 | 810.00 | | 0021 | 701-05-01066 | Side Drain Pipe (24" RCP) | 36 | LNFT | 149.00 | 5,364.00 | 235.00 | 8,460.00 | 175.00 | 6,300.00 | 150.00 | 5,400.00 | | 0022 | 701-05-01088 | Side Drain Pipe (30" RCP) | 24 | LNFT | 193.00 | 4,632.00 | 355.00 | 8,520.00 | 201.00 | 4,824.00 | 190.00 | 4,560.00 | | 0023 | 702-08-00100 | Side Drain Safety End (Type 1) | 4 | EACH | 4,500.00 | 18,000.00 | 4,000.00 | 16,000.00 | 4,395.00 | 17,580.00 | 5,500.00 | 22,000.00 | | 0024 | 702-08-00200 | Side Drain Safety End (Type 2) | 2 | EACH | 6,080.00 | 12,160.00 | 6,900.00 | 13,800.00 | 5,617.00 | 11,234.00 | 7,500.00 | 15,000.00 | | 0025 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 131.25 | LNFT | 39.00 | 5,118.75 | 33.00 | 4,331.25 | 20.00 | 2,625.00 | 33.00 | 4,331.25 | | 0026 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 200 | LNFT | 165.00 | 33,000.00 | 115.00 | 23,000.00 | 80.00 | 16,000.00 | 115.00 | 23,000.00 | | 0027 | 704-10-00205 | Guard Rail End Treatment, MASH, (TL-3 Tangent) | 8 | EACH | 3,700.00 | 29,600.00 | 3,400.00 | 27,200.00 | 3,250.00 | 26,000.00 | 3,400.00 | 27,200.00 | | 0028 | 706-02-00200 | Concrete Drive (6" Thick) | 19 | SQYD | 220.00 | 4,180.00 | 475.00 | 9,025.00 | 155.00 | 2,945.00 | 120.00 | 2,280.00 | | 0029 | 711-01-04000 | Riprap (55 lb, 18" Thick) | 1,129 | SQYD | 72.00 | 81,288.00 | 115.00 | 129,835.00 | 107.00 | 120,803.00 | 75.00 | 84,675.00 | | 0030 | 711-04-00100 | Geotextile Fabric | 1,129 | SQYD | 4.00 | 4,516.00 | 1.00 | 1,129.00 | 4.00 | 4,516.00 | 5.00 | 5,645.00 | | 0031 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 45,000.00 | 45,000.00 | 94,000.00 | 94,000.00 | 39,000.00 | 39,000.00 | 53,000.00 | 53,000.00 | | 0032 | 726-01-00100 | Bedding Material | 2 | CUYD | 1,000.00 | 2,000.00 | 510.00 | 1,020.00 | 749.00 | 1,498.00 | 150.00 | 300.00 | | 0033 | 727-01-00100 | Mobilization | 1 | LUMP | 220,000.00 | 220,000.00 | 260,000.00 | 260,000.00 | 262,200.00 | 262,200.00 | 262,396.00 | 262,396.00 | | 0034 | 729-16-00300 | Object Marker Assembly (Type 3) | 8 | EACH | 108.00 | 864.00 | 85.00 | 680.00 | 100.00 | 800.00 | 85.00 | 680.00 | | 0035 | 731-02-00100 | Reflectorized Raised Pavement Markers | 47 | EACH | 280.00 | 13,160.00 | 50.00 | 2,350.00 | 20.00 | 940.00 | 50.00 | 2,350.00 | | 0036 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 0.532 | MILE | 11,000.00 | 5,852.00 | 7,500.00 | 3,990.00 | 10,000.00 | 5,320.00 | 22,000.00 | 11,704.00 | | 0037 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 0.097 | MILE | 5,800.00 | 562.60 | 3,300.00 | 320.10 | 5,000.00 | 485.00 | 5,500.00 | 533.50 | | 0038 | 735-01-00100 | Mailboxes | 1 | EACH | 138.00 | 138.00 | 50.00 | 50.00 | 50.00 | 50.00 | 50.00 | 50.00 | | 0039 | 735-02-00100 | Mailbox Supports (Single) | 1 | EACH | 440.00 | 440.00 | 250.00 | 250.00 | 150.00 | 150.00 | 250.00 | 250.00 | | 0040 | 739-01-00100 | Hydro-Seeding | 0.96 | ACRE | 4,500.00 | 4,320.00 | 4,000.00 | 3,840.00 | 4,730.00 | 4,540.80 | 4,000.00 | 3,840.00 | | 0041 | 740-01-00100 | Construction Layout | 1 | LUMP | 35,000.00 | 35,000.00 | 55,000.00 | 55,000.00 | 10,000.00 | 10,000.00 | 37,462.00 | 37,462.00 | | 0042 | 804-01-00300 | Precast Concrete Piles (16") | 3,840 | LNFT | 151.00 | 579,840.00 | 132.00 | 506,880.00 | 115.00 | 441,600.00 | 155.00 | 595,200.00 | | 0043 | 804-17-00100 | Construction Site Survey | 1 | LUMP | 15,000.00 | 15,000.00 | 12,900.00 | 12,900.00 | 15,800.00 | 15,800.00 | 13,000.00 | 13,000.00 | | 0044 | 804-18-00100 | Vibration Monitoring | 6 | DAY | 980.00 | 5,880.00 | 1,050.00 | 6,300.00 | 1,300.00 | 7,800.00 | 2,100.00 | 12,600.00 | | 0045 | 805-01-00100 | Class A1 Concrete (Slab Span) | 254.8 | CUYD | 1,430.00 | 364,364.00 | 1,350.00 | 343,980.00 | 1,900.00 | 484,120.00 | 1,200.00 | 305,760.00 | | 0046 | 805-01-00300 | Class A1 Concrete (Bent Cap) | 64.48 | CUYD | 2,900.00 | 186,992.00 | 2,800.00 | 180,544.00 | 2,700.00 | 174,096.00 | 3,200.00 | 206,336.00 | | 0047 | 805-18-00100 | Concrete Finish (Class 2 Rubbed Finish) | 2,388 | SQFT | 3.75 | 8,955.00 | 4.00 | 9,552.00 | 9.00 | 21,492.00 | 2.00 | 4,776.00 | | 0048 | 805-18-00200 | Concrete Finish (Class 3 Special Finish) | 2,388 | SQFT | 4.50 | 10,746.00 | 4.50 | 10,746.00 | 2.00 | 4,776.00 | 3.00 | 7,164.00 | | 0049 | 806-01-00100 | Deformed Reinforcing Steel | 67,775 | LB | 2.00 | 135,550.00 | 1.50 | 101,662.50 | 2.00 | 135,550.00 | 2.00 | 135,550.00 | | 0050 | 810-01-00100 | Concrete Bridge Railing (Standard) | 160 | LNFT | 280.00 | 44,800.00 | 215.00 | 34,400.00 | 205.00 | 32,800.00 | 291.00 | 46,560.00 | | 0051 | 810-01-00200 | Concrete Bridge Railing (Slotted) | 240 | LNFT | 253.00 | 60,720.00 | 197.00 | 47,280.00 | 210.00 | 50,400.00 | 298.00 | 71,520.00 | | 0052 | 813-01-00100 | Concrete Approach Slabs (Cast-in-Place) | 1,160 | SQFT | 68.00 | 78,880.00 | 95.00 | 110,200.00 | 76.25 | 88,450.00 | 99.00 | 114,840.00 | | 0053 | 815-03-00300 | Joint Seal (Poured) | 336 | LNFT | 7.00 | 2,352.00 | 45.00 | 15,120.00 | 11.15 | 3,746.40 | 18.00 | 6,048.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 2,453,110.25 | | 2,599,437.50 | | 2,619,332.62 | | 2,623,000.00 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 5 - Buck Town Contractors & Co. | - 6 - Guinn Construction, LLC | - 7 - Coastal Contractors, LLC | - 8 - JB JAMES CONSTRUCTION LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 100,000.00 | 100,000.00 | 100,000.00 | 100,000.00 | 200,000.00 | 200,000.00 | 200,000.00 | 200,000.00 | | 0002 | 202-02-00010 | Removal of Removal of Mailboxes | 1 | EACH | 5.00 | 5.00 | 200.00 | 200.00 | 250.00 | 250.00 | 250.00 | 250.00 | | 0003 | 202-02-03030 | Removal of Pavement Structure | 1,870.1 | SQYD | 24.00 | 44,882.40 | 18.00 | 33,661.80 | 25.00 | 46,752.50 | 20.00 | 37,402.00 | | 0004 | 202-02-04501 | Removal of Bridge Bridge Str. No. 611730411905721 (27.4' Wide x 76' Long LWPCSS) | 1 | LUMP | 80,000.00 | 80,000.00 | 40,000.00 | 40,000.00 | 95,000.00 | 95,000.00 | 170,000.00 | 170,000.00 | | 0005 | 202-02-04501 | Removal of Bridge Bridge Str. No. 617730411905951 (31' Wide x 78' Long COPCSS) | 1 | LUMP | 80,000.00 | 80,000.00 | 40,000.00 | 40,000.00 | 95,000.00 | 95,000.00 | 170,000.00 | 170,000.00 | | 0006 | 202-02-06100 | Removal of Concrete Walks and Drives | 30 | SQYD | 10.00 | 300.00 | 10.00 | 300.00 | 26.00 | 780.00 | 120.00 | 3,600.00 | | 0007 | 202-02-32120 | Removal of Pipe (Side Drain) (Side Drain)(24" CMP, 24" CPP, 30" CPP) | 63 | LNFT | 30.00 | 1,890.00 | 10.00 | 630.00 | 22.00 | 1,386.00 | 100.00 | 6,300.00 | | 0008 | 203-02-00100 | Drainage Excavation | 853 | CUYD | 25.00 | 21,325.00 | 25.00 | 21,325.00 | 46.00 | 39,238.00 | 32.00 | 27,296.00 | | 0009 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 47,000.00 | 47,000.00 | 75,000.00 | 75,000.00 | 46,000.00 | 46,000.00 | 60,000.00 | 60,000.00 | | 0010 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 8 | EACH | 100.00 | 800.00 | 250.00 | 2,000.00 | 180.00 | 1,440.00 | 175.00 | 1,400.00 | | 0011 | 204-06-00100 | Temporary Silt Fencing | 2,115 | LNFT | 1.00 | 2,115.00 | 3.00 | 6,345.00 | 2.50 | 5,287.50 | 8.00 | 16,920.00 | | 0012 | 302-02-08520 | Class II Base Course (8-1/2" Thick) (Crushed Stone) | 2,639.1 | SQYD | 39.00 | 102,924.90 | 65.00 | 171,541.50 | 51.00 | 134,594.10 | 50.00 | 131,955.00 | | 0013 | 302-03-00100 | Base Drain Outlet | 8 | EACH | 1,300.00 | 10,400.00 | 2,000.00 | 16,000.00 | 1,200.00 | 9,600.00 | 1,200.00 | 9,600.00 | | 0014 | 304-01-00100 | Lime | 35.28 | TON | 460.00 | 16,228.80 | 500.00 | 17,640.00 | 450.00 | 15,876.00 | 450.00 | 15,876.00 | | 0015 | 304-05-00100 | Lime Treatment (Type E) | 2,639 | SQYD | 10.00 | 26,390.00 | 15.00 | 39,585.00 | 10.00 | 26,390.00 | 10.00 | 26,390.00 | | 0016 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 14 | CUYD | 1.00 | 14.00 | 250.00 | 3,500.00 | 180.00 | 2,520.00 | 200.00 | 2,800.00 | | 0017 | 402-01-00101 | Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 100 | CUYD | 1.00 | 100.00 | 50.00 | 5,000.00 | 200.00 | 20,000.00 | 200.00 | 20,000.00 | | 0018 | 502-01-00100 | Asphalt Concrete | 383.2 | TON | 255.00 | 97,716.00 | 275.00 | 105,380.00 | 225.00 | 86,220.00 | 238.00 | 91,201.60 | | 0019 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 173 | TON | 230.00 | 39,790.00 | 275.00 | 47,575.00 | 225.00 | 38,925.00 | 238.00 | 41,174.00 | | 0020 | 511-01-00100 | Saw Cutting Asphalt Concrete Pavement | 405 | INLF | 5.00 | 2,025.00 | 10.00 | 4,050.00 | 1.00 | 405.00 | 2.00 | 810.00 | | 0021 | 701-05-01066 | Side Drain Pipe (24" RCP) | 36 | LNFT | 175.00 | 6,300.00 | 140.00 | 5,040.00 | 170.00 | 6,120.00 | 200.00 | 7,200.00 | | 0022 | 701-05-01088 | Side Drain Pipe (30" RCP) | 24 | LNFT | 200.00 | 4,800.00 | 250.00 | 6,000.00 | 240.00 | 5,760.00 | 365.00 | 8,760.00 | | 0023 | 702-08-00100 | Side Drain Safety End (Type 1) | 4 | EACH | 3,300.00 | 13,200.00 | 4,000.00 | 16,000.00 | 6,000.00 | 24,000.00 | 6,000.00 | 24,000.00 | | 0024 | 702-08-00200 | Side Drain Safety End (Type 2) | 2 | EACH | 6,300.00 | 12,600.00 | 12,500.00 | 25,000.00 | 7,900.00 | 15,800.00 | 9,000.00 | 18,000.00 | | 0025 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 131.25 | LNFT | 36.00 | 4,725.00 | 45.00 | 5,906.25 | 38.00 | 4,987.50 | 20.00 | 2,625.00 | | 0026 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 200 | LNFT | 93.00 | 18,600.00 | 155.00 | 31,000.00 | 125.00 | 25,000.00 | 80.00 | 16,000.00 | | 0027 | 704-10-00205 | Guard Rail End Treatment, MASH, (TL-3 Tangent) | 8 | EACH | 3,750.00 | 30,000.00 | 4,250.00 | 34,000.00 | 3,700.00 | 29,600.00 | 3,250.00 | 26,000.00 | | 0028 | 706-02-00200 | Concrete Drive (6" Thick) | 19 | SQYD | 150.00 | 2,850.00 | 125.00 | 2,375.00 | 225.00 | 4,275.00 | 200.00 | 3,800.00 | | 0029 | 711-01-04000 | Riprap (55 lb, 18" Thick) | 1,129 | SQYD | 120.00 | 135,480.00 | 135.00 | 152,415.00 | 100.00 | 112,900.00 | 100.00 | 112,900.00 | | 0030 | 711-04-00100 | Geotextile Fabric | 1,129 | SQYD | 2.00 | 2,258.00 | 5.00 | 5,645.00 | 5.50 | 6,209.50 | 3.00 | 3,387.00 | | 0031 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 21,200.00 | 21,200.00 | 45,000.00 | 45,000.00 | 70,000.00 | 70,000.00 | 80,000.00 | 80,000.00 | | 0032 | 726-01-00100 | Bedding Material | 2 | CUYD | 170.00 | 340.00 | 500.00 | 1,000.00 | 170.00 | 340.00 | 1,000.00 | 2,000.00 | | 0033 | 727-01-00100 | Mobilization | 1 | LUMP | 290,000.00 | 290,000.00 | 275,000.00 | 275,000.00 | 275,000.00 | 275,000.00 | 320,000.00 | 320,000.00 | | 0034 | 729-16-00300 | Object Marker Assembly (Type 3) | 8 | EACH | 115.00 | 920.00 | 200.00 | 1,600.00 | 95.00 | 760.00 | 100.00 | 800.00 | | 0035 | 731-02-00100 | Reflectorized Raised Pavement Markers | 47 | EACH | 58.00 | 2,726.00 | 100.00 | 4,700.00 | 55.00 | 2,585.00 | 50.00 | 2,350.00 | | 0036 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 0.532 | MILE | 11,500.00 | 6,118.00 | 15,000.00 | 7,980.00 | 8,000.00 | 4,256.00 | 7,500.00 | 3,990.00 | | 0037 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 0.097 | MILE | 5,800.00 | 562.60 | 10,000.00 | 970.00 | 4,000.00 | 388.00 | 3,600.00 | 349.20 | | 0038 | 735-01-00100 | Mailboxes | 1 | EACH | 60.00 | 60.00 | 200.00 | 200.00 | 35.00 | 35.00 | 50.00 | 50.00 | | 0039 | 735-02-00100 | Mailbox Supports (Single) | 1 | EACH | 180.00 | 180.00 | 250.00 | 250.00 | 225.00 | 225.00 | 250.00 | 250.00 | | 0040 | 739-01-00100 | Hydro-Seeding | 0.96 | ACRE | 4,000.00 | 3,840.00 | 6,500.00 | 6,240.00 | 3,250.00 | 3,120.00 | 4,000.00 | 3,840.00 | | 0041 | 740-01-00100 | Construction Layout | 1 | LUMP | 32,200.00 | 32,200.00 | 35,000.00 | 35,000.00 | 40,000.00 | 40,000.00 | 40,000.00 | 40,000.00 | | 0042 | 804-01-00300 | Precast Concrete Piles (16") | 3,840 | LNFT | 179.00 | 687,360.00 | 150.00 | 576,000.00 | 148.00 | 568,320.00 | 160.00 | 614,400.00 | | 0043 | 804-17-00100 | Construction Site Survey | 1 | LUMP | 4,000.00 | 4,000.00 | 15,500.00 | 15,500.00 | 16,000.00 | 16,000.00 | 20,000.00 | 20,000.00 | | 0044 | 804-18-00100 | Vibration Monitoring | 6 | DAY | 925.00 | 5,550.00 | 1,500.00 | 9,000.00 | 1,100.00 | 6,600.00 | 1,700.00 | 10,200.00 | | 0045 | 805-01-00100 | Class A1 Concrete (Slab Span) | 254.8 | CUYD | 1,800.00 | 458,640.00 | 1,750.00 | 445,900.00 | 2,200.00 | 560,560.00 | 1,400.00 | 356,720.00 | | 0046 | 805-01-00300 | Class A1 Concrete (Bent Cap) | 64.48 | CUYD | 2,900.00 | 186,992.00 | 2,400.00 | 154,752.00 | 2,650.00 | 170,872.00 | 2,900.00 | 186,992.00 | | 0047 | 805-18-00100 | Concrete Finish (Class 2 Rubbed Finish) | 2,388 | SQFT | 1.00 | 2,388.00 | 3.00 | 7,164.00 | 3.00 | 7,164.00 | 4.00 | 9,552.00 | | 0048 | 805-18-00200 | Concrete Finish (Class 3 Special Finish) | 2,388 | SQFT | 1.00 | 2,388.00 | 3.00 | 7,164.00 | 4.00 | 9,552.00 | 4.00 | 9,552.00 | | 0049 | 806-01-00100 | Deformed Reinforcing Steel | 67,775 | LB | 1.30 | 88,107.50 | 1.75 | 118,606.25 | 1.25 | 84,718.75 | 1.60 | 108,440.00 | | 0050 | 810-01-00100 | Concrete Bridge Railing (Standard) | 160 | LNFT | 250.00 | 40,000.00 | 300.00 | 48,000.00 | 230.00 | 36,800.00 | 300.00 | 48,000.00 | | 0051 | 810-01-00200 | Concrete Bridge Railing (Slotted) | 240 | LNFT | 250.00 | 60,000.00 | 300.00 | 72,000.00 | 230.00 | 55,200.00 | 160.00 | 38,400.00 | | 0052 | 813-01-00100 | Concrete Approach Slabs (Cast-in-Place) | 1,160 | SQFT | 100.00 | 116,000.00 | 95.00 | 110,200.00 | 105.00 | 121,800.00 | 110.00 | 127,600.00 | | 0053 | 815-03-00300 | Joint Seal (Poured) | 336 | LNFT | 10.00 | 3,360.00 | 15.00 | 5,040.00 | 40.00 | 13,440.00 | 26.00 | 8,736.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 2,917,651.20 | | 2,960,380.80 | | 3,148,051.85 | | 3,247,867.80 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 9 - Command Construction Industries LLC | - 10 - Gilchrist Construction Company, LLC | | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 150,000.00 | 150,000.00 | 125,000.00 | 125,000.00 | | 0002 | 202-02-00010 | Removal of Removal of Mailboxes | 1 | EACH | 100.00 | 100.00 | 2,000.00 | 2,000.00 | | 0003 | 202-02-03030 | Removal of Pavement Structure | 1,870.1 | SQYD | 20.00 | 37,402.00 | 20.00 | 37,402.00 | | 0004 | 202-02-04501 | Removal of Bridge Bridge Str. No. 611730411905721 (27.4' Wide x 76' Long LWPCSS) | 1 | LUMP | 150,000.00 | 150,000.00 | 70,000.00 | 70,000.00 | | 0005 | 202-02-04501 | Removal of Bridge Bridge Str. No. 617730411905951 (31' Wide x 78' Long COPCSS) | 1 | LUMP | 150,000.00 | 150,000.00 | 70,000.00 | 70,000.00 | | 0006 | 202-02-06100 | Removal of Concrete Walks and Drives | 30 | SQYD | 20.00 | 600.00 | 150.00 | 4,500.00 | | 0007 | 202-02-32120 | Removal of Pipe (Side Drain) (Side Drain)(24" CMP, 24" CPP, 30" CPP) | 63 | LNFT | 20.00 | 1,260.00 | 25.00 | 1,575.00 | | 0008 | 203-02-00100 | Drainage Excavation | 853 | CUYD | 20.00 | 17,060.00 | 25.00 | 21,325.00 | | 0009 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 100,000.00 | 100,000.00 | 250,000.00 | 250,000.00 | | 0010 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 8 | EACH | 150.00 | 1,200.00 | 140.00 | 1,120.00 | | 0011 | 204-06-00100 | Temporary Silt Fencing | 2,115 | LNFT | 5.00 | 10,575.00 | 3.00 | 6,345.00 | | 0012 | 302-02-08520 | Class II Base Course (8-1/2" Thick) (Crushed Stone) | 2,639.1 | SQYD | 50.00 | 131,955.00 | 50.00 | 131,955.00 | | 0013 | 302-03-00100 | Base Drain Outlet | 8 | EACH | 750.00 | 6,000.00 | 3,000.00 | 24,000.00 | | 0014 | 304-01-00100 | Lime | 35.28 | TON | 250.00 | 8,820.00 | 290.00 | 10,231.20 | | 0015 | 304-05-00100 | Lime Treatment (Type E) | 2,639 | SQYD | 7.00 | 18,473.00 | 7.00 | 18,473.00 | | 0016 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 14 | CUYD | 200.00 | 2,800.00 | 200.00 | 2,800.00 | | 0017 | 402-01-00101 | Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 100 | CUYD | 1.00 | 100.00 | 125.00 | 12,500.00 | | 0018 | 502-01-00100 | Asphalt Concrete | 383.2 | TON | 250.00 | 95,800.00 | 375.00 | 143,700.00 | | 0019 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 173 | TON | 250.00 | 43,250.00 | 375.00 | 64,875.00 | | 0020 | 511-01-00100 | Saw Cutting Asphalt Concrete Pavement | 405 | INLF | 1.00 | 405.00 | 10.00 | 4,050.00 | | 0021 | 701-05-01066 | Side Drain Pipe (24" RCP) | 36 | LNFT | 175.00 | 6,300.00 | 160.00 | 5,760.00 | | 0022 | 701-05-01088 | Side Drain Pipe (30" RCP) | 24 | LNFT | 250.00 | 6,000.00 | 195.00 | 4,680.00 | | 0023 | 702-08-00100 | Side Drain Safety End (Type 1) | 4 | EACH | 5,750.00 | 23,000.00 | 5,700.00 | 22,800.00 | | 0024 | 702-08-00200 | Side Drain Safety End (Type 2) | 2 | EACH | 6,000.00 | 12,000.00 | 7,700.00 | 15,400.00 | | 0025 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 131.25 | LNFT | 35.00 | 4,593.75 | 34.00 | 4,462.50 | | 0026 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 200 | LNFT | 100.00 | 20,000.00 | 117.00 | 23,400.00 | | 0027 | 704-10-00205 | Guard Rail End Treatment, MASH, (TL-3 Tangent) | 8 | EACH | 3,750.00 | 30,000.00 | 3,500.00 | 28,000.00 | | 0028 | 706-02-00200 | Concrete Drive (6" Thick) | 19 | SQYD | 100.00 | 1,900.00 | 125.00 | 2,375.00 | | 0029 | 711-01-04000 | Riprap (55 lb, 18" Thick) | 1,129 | SQYD | 100.00 | 112,900.00 | 95.00 | 107,255.00 | | 0030 | 711-04-00100 | Geotextile Fabric | 1,129 | SQYD | 3.00 | 3,387.00 | 7.00 | 7,903.00 | | 0031 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 50,000.00 | 50,000.00 | 136,000.00 | 136,000.00 | | 0032 | 726-01-00100 | Bedding Material | 2 | CUYD | 250.00 | 500.00 | 155.00 | 310.00 | | 0033 | 727-01-00100 | Mobilization | 1 | LUMP | 330,000.00 | 330,000.00 | 300,000.00 | 300,000.00 | | 0034 | 729-16-00300 | Object Marker Assembly (Type 3) | 8 | EACH | 150.00 | 1,200.00 | 90.00 | 720.00 | | 0035 | 731-02-00100 | Reflectorized Raised Pavement Markers | 47 | EACH | 250.00 | 11,750.00 | 50.00 | 2,350.00 | | 0036 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 0.532 | MILE | 10,000.00 | 5,320.00 | 7,500.00 | 3,990.00 | | 0037 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 0.097 | MILE | 6,000.00 | 582.00 | 3,300.00 | 320.10 | | 0038 | 735-01-00100 | Mailboxes | 1 | EACH | 100.00 | 100.00 | 31.00 | 31.00 | | 0039 | 735-02-00100 | Mailbox Supports (Single) | 1 | EACH | 200.00 | 200.00 | 205.00 | 205.00 | | 0040 | 739-01-00100 | Hydro-Seeding | 0.96 | ACRE | 5,000.00 | 4,800.00 | 4,800.00 | 4,608.00 | | 0041 | 740-01-00100 | Construction Layout | 1 | LUMP | 50,000.00 | 50,000.00 | 40,000.00 | 40,000.00 | | 0042 | 804-01-00300 | Precast Concrete Piles (16") | 3,840 | LNFT | 150.00 | 576,000.00 | 150.00 | 576,000.00 | | 0043 | 804-17-00100 | Construction Site Survey | 1 | LUMP | 50,000.00 | 50,000.00 | 25,000.00 | 25,000.00 | | 0044 | 804-18-00100 | Vibration Monitoring | 6 | DAY | 750.00 | 4,500.00 | 1,200.00 | 7,200.00 | | 0045 | 805-01-00100 | Class A1 Concrete (Slab Span) | 254.8 | CUYD | 2,000.00 | 509,600.00 | 1,800.00 | 458,640.00 | | 0046 | 805-01-00300 | Class A1 Concrete (Bent Cap) | 64.48 | CUYD | 4,000.00 | 257,920.00 | 3,400.00 | 219,232.00 | | 0047 | 805-18-00100 | Concrete Finish (Class 2 Rubbed Finish) | 2,388 | SQFT | 1.00 | 2,388.00 | 2.50 | 5,970.00 | | 0048 | 805-18-00200 | Concrete Finish (Class 3 Special Finish) | 2,388 | SQFT | 1.00 | 2,388.00 | 2.50 | 5,970.00 | | 0049 | 806-01-00100 | Deformed Reinforcing Steel | 67,775 | LB | 2.00 | 135,550.00 | 1.25 | 84,718.75 | | 0050 | 810-01-00100 | Concrete Bridge Railing (Standard) | 160 | LNFT | 250.00 | 40,000.00 | 250.00 | 40,000.00 | | 0051 | 810-01-00200 | Concrete Bridge Railing (Slotted) | 240 | LNFT | 250.00 | 60,000.00 | 250.00 | 60,000.00 | | 0052 | 813-01-00100 | Concrete Approach Slabs (Cast-in-Place) | 1,160 | SQFT | 80.00 | 92,800.00 | 125.00 | 145,000.00 | | 0053 | 815-03-00300 | Joint Seal (Poured) | 336 | LNFT | 30.00 | 10,080.00 | 30.00 | 10,080.00 | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 3,341,558.75 | | 3,350,231.55 |
|