Proposal:H.015395.6
Parish:Lincoln
Routes:LA 150
Description:LA 150: W OF MAPLE ST - N MONROE ST
Type Construction:JOINTED CONCRETE PAVEMENT PATCHING, CONCRETE CURB, AND RELATED WORK.
Estimated Construction Cost:$2,060,656.85
| Rank | License | Bidder | Construction Bid |
| 1 | 21982 | Forby Contracting, Inc. | $1,396,601.00 |
| 2 | 30774 | Progressive Construction Co., LLC | $1,512,989.63 |
| 3 | 39462 | JB JAMES CONSTRUCTION LLC | $2,013,384.30 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Forby Contracting, Inc. | - 2 - Progressive Construction Co., LLC | - 3 - JB JAMES CONSTRUCTION LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-02-06100 | Removal of Concrete Walks and Drives | 133 | SQYD | 25.00 | 3,325.00 | 20.00 | 2,660.00 | 50.00 | 6,650.00 | | 0002 | 202-02-06140 | Removal of Curbs (Concrete) | 1,622 | LNFT | 20.00 | 32,440.00 | 15.00 | 24,330.00 | 5.00 | 8,110.00 | | 0003 | 203-07-00100 | Borrow (Vehicular Measurement) | 18 | CUYD | 100.00 | 1,800.00 | 100.00 | 1,800.00 | 150.00 | 2,700.00 | | 0004 | 204-06-00100 | Temporary Silt Fencing | 80 | LNFT | 60.00 | 4,800.00 | 15.00 | 1,200.00 | 20.00 | 1,600.00 | | 0005 | 602-02-00200 | Cleaning and Resealing Existing Longitudinal Pavement Joints | 28,249 | LNFT | 3.00 | 84,747.00 | 3.00 | 84,747.00 | 4.00 | 112,996.00 | | 0006 | 602-02-00300 | Cleaning and Resealing Existing Transverse Pavements Joints | 22,367 | LNFT | 3.00 | 67,101.00 | 3.00 | 67,101.00 | 4.00 | 89,468.00 | | 0007 | 602-05-01120 | Full Depth Patching of Jointed Concrete Pavement (16.0 square yards and under) (8" Thick) | 1,061.1 | SQYD | 250.00 | 265,275.00 | 260.00 | 275,886.00 | 340.00 | 360,774.00 | | 0008 | 602-05-02120 | Full Depth Patching of Jointed Concrete Pavement (16.1 square yards to 48.0 square yards) (8" Thick) | 1,880.7 | SQYD | 220.00 | 413,754.00 | 225.00 | 423,157.50 | 300.00 | 564,210.00 | | 0009 | 602-05-03120 | Full Depth Patching of Jointed Concrete Pavement (48.1 square yards and over) (8" Thick) | 553.2 | SQYD | 200.00 | 110,640.00 | 180.00 | 99,576.00 | 240.00 | 132,768.00 | | 0010 | 701-15-00100 | Concrete Collar | 1 | EACH | 2,000.00 | 2,000.00 | 2,500.00 | 2,500.00 | 8,000.00 | 8,000.00 | | 0011 | 702-04-00100 | Adjusting Manholes | 5 | EACH | 750.00 | 3,750.00 | 2,500.00 | 12,500.00 | 4,000.00 | 20,000.00 | | 0012 | 702-04-00200 | Adjusting Catch Basins | 12 | EACH | 1,500.00 | 18,000.00 | 5,500.00 | 66,000.00 | 3,700.00 | 44,400.00 | | 0013 | 706-01-00100 | Concrete Walk (4" Thick) | 25 | SQYD | 95.00 | 2,375.00 | 150.00 | 3,750.00 | 130.00 | 3,250.00 | | 0014 | 706-04-00110 | Curb Ramps TYPE 1 | 12.8 | SQYD | 250.00 | 3,200.00 | 280.00 | 3,584.00 | 230.00 | 2,944.00 | | 0015 | 706-04-00110 | Curb Ramps TYPE 3 | 8.1 | SQYD | 300.00 | 2,430.00 | 280.00 | 2,268.00 | 370.00 | 2,997.00 | | 0016 | 706-04-00110 | Curb Ramps TYPE 7 | 159.6 | SQYD | 350.00 | 55,860.00 | 280.00 | 44,688.00 | 210.00 | 33,516.00 | | 0017 | 706-04-00110 | Curb Ramps TYPE 8 | 62.6 | SQYD | 325.00 | 20,345.00 | 280.00 | 17,528.00 | 195.00 | 12,207.00 | | 0018 | 707-01-00100 | Concrete Curb | 1,622 | LNFT | 25.00 | 40,550.00 | 25.00 | 40,550.00 | 17.00 | 27,574.00 | | 0019 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 40,000.00 | 40,000.00 | 50,000.00 | 50,000.00 | 250,000.00 | 250,000.00 | | 0020 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 1,040 | LNFT | 0.50 | 520.00 | 0.55 | 572.00 | 0.50 | 520.00 | | 0021 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 344 | LNFT | 1.00 | 344.00 | 1.10 | 378.40 | 1.00 | 344.00 | | 0022 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 4.798 | MILE | 650.00 | 3,118.70 | 2,000.00 | 9,596.00 | 1,500.00 | 7,197.00 | | 0023 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 3.142 | MILE | 650.00 | 2,042.30 | 715.00 | 2,246.53 | 650.00 | 2,042.30 | | 0024 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 6.624 | MILE | 900.00 | 5,961.60 | 990.00 | 6,557.76 | 900.00 | 5,961.60 | | 0025 | 714-01-00100 | Slab Sodding (Bermuda Grass) | 175 | SQYD | 28.00 | 4,900.00 | 20.00 | 3,500.00 | 50.00 | 8,750.00 | | 0026 | 718-01-00100 | Fertilizer | 37 | LB | 6.00 | 222.00 | 45.00 | 1,665.00 | 5.00 | 185.00 | | 0027 | 727-01-00100 | Mobilization | 1 | LUMP | 100,000.00 | 100,000.00 | 150,000.00 | 150,000.00 | 200,000.00 | 200,000.00 | | 0028 | 731-02-00100 | Reflectorized Raised Pavement Markers | 1,809 | EACH | 6.00 | 10,854.00 | 6.60 | 11,939.40 | 6.00 | 10,854.00 | | 0029 | 732-01-02040 | Plastic Pavement Striping (8" Width) (Thermoplastic 125 mil) | 1,040 | LNFT | 3.00 | 3,120.00 | 3.30 | 3,432.00 | 3.00 | 3,120.00 | | 0030 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 344 | LNFT | 13.00 | 4,472.00 | 14.30 | 4,919.20 | 13.00 | 4,472.00 | | 0031 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 6.624 | MILE | 5,500.00 | 36,432.00 | 6,050.00 | 40,075.20 | 5,500.00 | 36,432.00 | | 0032 | 732-03-04001 | Plastic Pav't Striping (Broken) (7" Width) (Preformed Tape) (Retroreflectivity Level I) (Black and White Contrast) | 3.142 | MILE | 9,800.00 | 30,791.60 | 10,780.00 | 33,870.76 | 9,800.00 | 30,791.60 | | 0033 | 732-05-00100 | Removal of Existing Markings | 1.656 | MILE | 6,800.00 | 11,260.80 | 7,480.00 | 12,386.88 | 6,800.00 | 11,260.80 | | 0034 | 740-01-00100 | Construction Layout | 1 | LUMP | 7,500.00 | 7,500.00 | 5,800.00 | 5,800.00 | 6,400.00 | 6,400.00 | | 0035 | NS-602-00001 | Milling Concrete Pavement | 8.9 | SQYD | 300.00 | 2,670.00 | 250.00 | 2,225.00 | 100.00 | 890.00 | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 1,396,601.00 | | 1,512,989.63 | | 2,013,384.30 |
|