Search


Bid Tabulations for the Letting of 8/12/2026 LA DOTD Headquarters

Proposal:H.016624.6
Parish:Catahoula
Routes:LA 28
Description:LA 28: LASALLE P/L - JCT US 84
Type Construction:MILLING ASPHALT PAVEMENT, PAVEMENT PATCHING, ASPHALT SURFACE TREATMENT, ASPHALT CONCRETE OVERLAY, AND RELATED WORK.
Estimated Construction Cost:$2,255,580.14
Rank License BidderConstruction Bid
112487Diamond B Construction Co., L.L.C.$1,811,288.55
212312Gilchrist Construction Company, LLC$1,872,451.60
305789D & J CONSTRUCTION CO., LLC$3,488,739.75


Line
Number
Item NumberItem DescriptionQuantityUnit of
Measure
- 1 -
Diamond B Construction Co., L.L.C.
- 2 -
Gilchrist Construction Company, LLC
- 3 -
D & J CONSTRUCTION CO., LLC
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
0001202-02-02020Removal of Asphalt Pavement 367.2   SQYD40.0014,688.0035.0012,852.0050.0018,360.00
0002202-02-14500Removal of Guard Rail 150     LNFT14.002,100.0014.002,100.0040.006,000.00
0003502-01-00100Asphalt Concrete 6,970.4   TON137.00954,944.80144.001,003,737.60225.001,568,340.00
0004502-01-00200Asphalt Concrete, Drives, Turnouts and Miscellaneous 36.7   TON1,300.0047,710.00700.0025,690.00295.0010,826.50
0005507-01-00100Asphalt Material (CRS-2P Emulsion) 23,560     GAL5.00117,800.005.10120,156.007.00164,920.00
0006507-02-00300Aggregate (S3) 76,000     SQYD1.50114,000.001.60121,600.004.00304,000.00
0007509-01-00100Milling Asphalt Pavement 63,367     SQYD3.50221,784.502.70171,090.907.00443,569.00
0008509-02-00100Contractor Retained Reclaimed Asphalt Pavement -2,641     CUYD1.00-2,641.001.00-2,641.001.00-2,641.00
0009510-01-00200Pavement Patching (12" Minimum Thickness) 378     SQYD199.0075,222.00194.0073,332.00320.00120,960.00
0010510-01-00300Pavement Patching (18" Minimum Thickness) 122     SQYD299.0036,478.00294.0035,868.00420.0051,240.00
0011704-03-00200Blocked Out Guard Rail - 31", (6'-3" Post Spacing) 62.5   LNFT35.002,187.5036.002,250.0050.003,125.00
0012704-05-00300Guard Rail Anchor Sections - 31", (Trailing End) 9.9   LNFT142.001,405.80143.001,415.70200.001,980.00
0013704-10-00205Guard Rail End Treatment, MASH, (TL-3 Tangent) 1     EACH4,150.004,150.004,200.004,200.006,000.006,000.00
0014713-01-00100Temporary Signs and Barricades 1     LUMP30,000.0030,000.0042,500.0042,500.00250,000.00250,000.00
0015713-03-01000Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) 3.277 MILE150.00491.55200.00655.40250.00819.25
0016713-03-02000Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) 5.96  MILE600.003,576.00600.003,576.00800.004,768.00
0017713-04-01000Temporary Pavement Markings (Solid Line) (4" Width) 15.948 MILE900.0014,353.20900.0014,353.201,000.0015,948.00
0018713-06-00200Temporary Reflectorized Raised Pavement Markers (Tabs) 856     EACH2.502,140.002.502,140.003.002,568.00
0019724-01-00100Rumble Strips (Centerline) 3.239 MILE1,000.003,239.001,100.003,562.90500.001,619.50
0020724-02-00100Rumble Strips (Shoulder/Edge) 6.477 MILE1,000.006,477.001,100.007,124.70500.003,238.50
0021724-03-00100Rumble Strips (Intersection) 1     EACH2,500.002,500.002,600.002,600.006,550.006,550.00
0022727-01-00100Mobilization 1     LUMP100,000.00100,000.00150,000.00150,000.00320,000.00320,000.00
0023729-16-00300Object Marker Assembly (Type 3) 2     EACH135.00270.00136.00272.00200.00400.00
0024731-02-00100Reflectorized Raised Pavement Markers 620     EACH5.003,100.005.503,410.0010.006,200.00
0025732-01-01040Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) 514     LNFT5.002,570.005.502,827.0020.0010,280.00
0026732-01-02080Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) 15     LNFT25.00375.0026.00390.0030.00450.00
0027732-02-02000Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) 7.974 MILE4,800.0038,275.204,800.0038,275.208,500.0067,779.00
0028732-03-02000Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) 2.98  MILE1,100.003,278.001,100.003,278.005,000.0014,900.00
0029732-03-02010Plastic Pavement Striping (Dotted Line)(4" W)(2' L)(Thermo 90 mil) 0.044 MILE18,500.00814.0019,000.00836.0035,000.001,540.00
0030740-01-00100Construction Layout 1     LUMP10,000.0010,000.0025,000.0025,000.0085,000.0085,000.00
           
  CONTRACTOR TOTAL   1,811,288.55 1,872,451.60 3,488,739.75